672 Project(s) Found

Brazoria County - Pearland Parkway extension
down-arrow
Project ID 625
Agency Name Brazoria County
Project Title Pearland Parkway extension
Facility/Street/Highway Pearland Parkway
Limits from Dixie Farm to FM 2351
Description Extend Pearland Parkway from Dixie Farm Road to FM 2351 (as a four-lane, median divided roadway) to improve mobility within Brazoria County and provide an additional north/south route parallel to SH 35 to reduce congestion.
Timeframe Medium Term (6-10 Years)
Estimated Cost $35,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Brazoria County - CR 100 extension
down-arrow
Project ID 626
Agency Name Brazoria County
Project Title CR 100 extension
Facility/Street/Highway County Road 100
Limits from CR 113 to SH 35
Description Construct 2-lane roadway and 2-lane grade separation crossing at existing railroad.
Timeframe Medium Term (6-10 Years)
Estimated Cost $16,600,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Brazoria County - CR 64 widening (both east and west – but east is mostly City) - Medium Term
down-arrow
Project ID 627
Agency Name Brazoria County
Project Title CR 64 widening (both east and west – but east is mostly City) - Medium Term
Facility/Street/Highway County Road 64
Limits from SH 288 to CR 65
Description Construct 10-foot shoulders along CR 64 from SH 288 to CR 65 to offset fixed objects from the travel way.
Timeframe Medium Term (6-10 Years)
Estimated Cost $2,976,000.00
Brazoria County - CR 64 widening (both east and west – but east is mostly City) - Short Term
down-arrow
Project ID 628
Agency Name Brazoria County
Project Title CR 64 widening (both east and west – but east is mostly City) - Short Term
Facility/Street/Highway County Road 64
Limits from SH 288 to CR 65
Description Construct 10-foot shoulders along CR 64 from SH 288 to CR 65 to offset fixed objects from the travel way.
Timeframe Medium Term (6-10 Years)
Estimated Cost $4,000,000.00
Brazoria County - CR 44 improvements
down-arrow
Project ID 629
Agency Name Brazoria County
Project Title CR 44 improvements
Facility/Street/Highway County Road 44
Limits FM 521 to SH 288
Description Install signage to warn drivers of roadway conditions and rumble strips to improve safety along CR 44 from FM 521 to W Wilkins Street. Construct 10-foot shoulders along CR 44 from SH 288 to FM 521 to offset fixed objects from the travel way and improve sight distance at intersections and driveways.
Timeframe Medium Term (6-10 Years)
Estimated Cost $6,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Brazoria County - CR 44 improvements - Short Term
down-arrow
Project ID 630
Agency Name Brazoria County
Project Title CR 44 improvements - Short Term
Facility/Street/Highway County Road 44
Limits FM 521 to SH 288
Description Install signage to warn drivers of roadway conditions and rumble strips to improve safety along CR 44 from FM 521 to W Wilkins Street. Construct 10-foot shoulders along CR 44 from SH 288 to FM 521 to offset fixed objects from the travel way and improve sight distance at intersections and driveways.
Timeframe Short Term (0-5 Years)
Estimated Cost $35,000.00
Brazoria County - CR 44 improvements
down-arrow
Project ID 631
Agency Name Brazoria County
Project Title CR 44 improvements
Facility/Street/Highway County Road 44
Limits SH 288 to Loop 274
Description Install signage to warn drivers of roadway conditions and rumble strips to improve safety along CR 44 from SH 288 to Loop 274. Construct 10-foot shoulders along CR 44 from SH 288 to Loop 274 to offset fixed objects from the travel way and improve sight distance at intersections and driveways.
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Brazoria County - CR 44 improvements - Short Term
down-arrow
Project ID 632
Agency Name Brazoria County
Project Title CR 44 improvements - Short Term
Facility/Street/Highway County Road 44
Limits SH 288 to Loop 274
Description Install signage to warn drivers of roadway conditions and rumble strips to improve safety along CR 44 from SH 288 to Loop 274. Construct 10-foot shoulders along CR 44 from SH 288 to Loop 274 to offset fixed objects from the travel way and improve sight distance at intersections and driveways.
Timeframe Short Term (0-5 Years)
Estimated Cost $28,900.00
Brazoria County - CR 353/359 improvements - Medium Term
down-arrow
Project ID 633
Agency Name Brazoria County
Project Title CR 353/359 improvements - Medium Term
Facility/Street/Highway County Road 353 and County Road 359
Limits FM 522 to CR 348FM 524 to FM 1459
Description Install signage to warn drivers of roadway conditions, install rumble strips, and clear vegetation along CR 353 from FM 522 to CR 348 to improve safety. Construct 10-foot shoulders and widen travel lanes to be 12 feet wide along CR 353 from FM 522 to CR 348 and along CR 359 from FM 1459 to FM 524
Timeframe Medium Term (6-10 Years)
Estimated Cost $2,283,300.00
Brazoria County - CR 353/359 improvements - Short Term
down-arrow
Project ID 634
Agency Name Brazoria County
Project Title CR 353/359 improvements - Short Term
Facility/Street/Highway County Road 353 and County Road 359
Limits FM 522 to CR 348FM 524 to FM 1459
Description Install signage to warn drivers of roadway conditions, install rumble strips, and clear vegetation along CR 353 from FM 522 to CR 348 to improve safety. Construct 10-foot shoulders and widen travel lanes to be 12 feet wide along CR 353 from FM 522 to CR 348 and along CR 359 from FM 1459 to FM 524
Timeframe Short Term (0-5 Years)
Estimated Cost $404,000.00
Brazoria County - CR 59 widening - Medium Term
down-arrow
Project ID 635
Agency Name Brazoria County
Project Title CR 59 widening - Medium Term
Facility/Street/Highway County Road 59
Limits West of CR 48
Description Construct 10-foot shoulders from the Fort Bend County Line to CR 48 and from Kirby Drive to SH 288 to offset fixed objects from the travel way. Construct turn bays to allow for safe deceleration at CR 564.
Timeframe Medium Term (6-10 Years)
Estimated Cost $4,331,000.00
Brazoria County - CR 59 widening - Short Term
down-arrow
Project ID 636
Agency Name Brazoria County
Project Title CR 59 widening - Short Term
Facility/Street/Highway County Road 59
Limits West of CR 48
Description Construct 10-foot shoulders from the Fort Bend County Line to CR 48 and from Kirby Drive to SH 288 to offset fixed objects from the travel way. Construct turn bays to allow for safe deceleration at CR 564.
Timeframe Short Term (0-5 Years)
Estimated Cost $95,000.00
Chambers County - Chambers Parkway
down-arrow
Project ID 637
Agency Name Chambers County
Project Title Chambers Parkway
Facility/Street/Highway Chambers Parkway
Limits Approx. 0.5 mi. south of I10 from S.H. 146 to F.M. 3180
Description Reconstruction of existing 2 lane roadway. Along with construction of a new 4 lane roadway.
Timeframe Short Term (0-5 Years)
Estimated Cost $30,000,000.00
Regional Goods Movement Questionnaire View Questionnaire
Chambers County - Kilgore Parkway Widening
down-arrow
Project ID 638
Agency Name Chambers County
Project Title Kilgore Parkway Widening
Facility/Street/Highway Kilgore Parkway
Limits From SH 99 East to FM 3180
Description Widen from 2 to 4 lanes with center turn lane
Timeframe Short Term (0-5 Years)
Estimated Cost $4,000,000.00
Chambers County - NEEDLEPOINT RD
down-arrow
Project ID 639
Agency Name Chambers County
Project Title NEEDLEPOINT RD
Facility/Street/Highway Needlepoint Rd
Limits From IH-10 south to FM 565
Description Reconstruction widen from 2 to 4 lanes
Timeframe Short Term (0-5 Years)
Estimated Cost $8,000,000.00
Regional Goods Movement Questionnaire View Questionnaire
Chambers County - Jonnie G Jennings Dr
down-arrow
Project ID 640
Agency Name Chambers County
Project Title Jonnie G Jennings Dr
Facility/Street/Highway Jonnie G Jennings Dr
Limits From FM 1405 East to FM 2354
Description Construct 2 lane concrete freight roadway
Timeframe Medium Term (6-10 Years)
Estimated Cost $10,000,000.00
Regional Goods Movement Questionnaire View Questionnaire
Chambers County - Belton Lane Extinsion Widen
down-arrow
Project ID 641
Agency Name Chambers County
Project Title Belton Lane Extinsion Widen
Facility/Street/Highway Belton Lane Extension
Limits From FM 563 to FM 562
Description Widen roadway to include turn lanes and sidewalks in front of new school
Timeframe
Estimated Cost $6,000,000.00
Chambers County - Hatcherville RD
down-arrow
Project ID 642
Agency Name Chambers County
Project Title Hatcherville RD
Facility/Street/Highway Hatcherville RD
Limits From Liberty County to FM 1942
Description Full depth repairs and replace asphalt pavement to concrete
Timeframe Short Term (0-5 Years)
Estimated Cost $2,750,000.00
Chambers County - Bayer Road
down-arrow
Project ID 643
Agency Name Chambers County
Project Title Bayer Road
Facility/Street/Highway Bayer Road
Limits From FM 1405 to 6,185 ft North
Description Reconstruction of asphalt road to industrial standards
Timeframe Medium Term (6-10 Years)
Estimated Cost $4,100,000.00
Chambers County - West Bay Road
down-arrow
Project ID 644
Agency Name Chambers County
Project Title West Bay Road
Facility/Street/Highway West Bay Road
Limits From SH 99 to Bayer Road
Description Reconstruction of asphalt road to industrial standards
Timeframe Long Term (More than 10 Years)
Estimated Cost $3,600,000.00
Chambers County - Rhonda Rosa
down-arrow
Project ID 645
Agency Name Chambers County
Project Title Rhonda Rosa
Facility/Street/Highway Rhonda Rosa
Limits At Turtle Bayou
Description Replace Bridge Class Culvert
Timeframe Short Term (0-5 Years)
Estimated Cost $500,000.00
City of Angleton - Henderson Road Improvement Project
down-arrow
Project ID 646
Agency Name City of Angleton
Project Title Henderson Road Improvement Project
Facility/Street/Highway Henderson Road
Limits From SH 288B to SH 35
Description This project will improve the modlity and safety for bike, pedestrian, and vechicular movements in a cooridor with an existing school and significant amount of new development. The City has perform a cooridor study and identifed that the two lane roadway is insufficent and does is required to be converted into a boulavard section with sidewalks/shared paths and several signalized intersection. Associated drainage improvements will be required to install this boulevard cross-section and improve the drainage in the area.
Timeframe Medium Term (6-10 Years)
Estimated Cost $51,600,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
City of Angleton - Western Avenue Improvement Project
down-arrow
Project ID 647
Agency Name City of Angleton
Project Title Western Avenue Improvement Project
Facility/Street/Highway Western Ave
Limits From West Mullberry Street to West Mulbery Street
Description This project will improve the paving condition, safety, and drainage in the area
Timeframe Short Term (0-5 Years)
Estimated Cost $3,240,000.00
City of Baytown - Garth Rd Widening Segment D
down-arrow
Project ID 648
Agency Name City of Baytown
Project Title Garth Rd Widening Segment D
Facility/Street/Highway Garth Rd
Limits Archer Rd to SH 146
Description Reconstruction and Widening from 4 to 6 11 ft. lanes with 16 ft. non continuous mediansfor access management and right turns in some locations; 6.5 ft sidewalk on east side and 10 ft shared use path on west side
Timeframe Short Term (0-5 Years)
Estimated Cost $105,000,000.00
Major Projects Questionnaire View Questionnaire
City of Baytown - Garth Rd Widening Segment E
down-arrow
Project ID 649
Agency Name City of Baytown
Project Title Garth Rd Widening Segment E
Facility/Street/Highway Garth Rd
Limits N. of Riceland Rd to S. of Baker Rd
Description Reconstruction and Widening from 4 to 6 11 ft. lanes with 16 ft. non continuous mediansfor access management and right turns in some locations; 6.5 ft sidewalk on east side and 10 ft shared use path on west side
Timeframe Short Term (0-5 Years)
Estimated Cost $34,600,000.00
City of Baytown - Garth Rd Widening Segment F
down-arrow
Project ID 650
Agency Name City of Baytown
Project Title Garth Rd Widening Segment F
Facility/Street/Highway Garth Rd
Limits N. of Riceland Rd to S. of Baker Rd
Description Reconstruction and Widening from 4 to 6 11 ft. lanes with 16 ft. non continuous mediansfor access management and right turns in some locations; 6.5 ft sidewalk on east side and 10 ft shared use path on west side
Timeframe Short Term (0-5 Years)
Estimated Cost $44,700,000.00
City of Baytown - Cedar Bayou Crossing (formerly Hunt Rd)
down-arrow
Project ID 651
Agency Name City of Baytown
Project Title Cedar Bayou Crossing (formerly Hunt Rd)
Facility/Street/Highway Cedar Bayou Crossing (formerly Hunt Rd)
Limits N. Main St to SH-146
Description Construct new 4 lane roadway connection across Cedar Bayou; with bridge and elevated crossing across railroads to provide alternate evacuation route.
Timeframe Medium Term (6-10 Years)
Estimated Cost $230,000,000.00
City of Baytown - W Baker Rd Reconstruction
down-arrow
Project ID 652
Agency Name City of Baytown
Project Title W Baker Rd Reconstruction
Facility/Street/Highway W Baker Rd
Limits Garth Rd to Decker Dr
Description Reconstruct pavement section, including drainge improvments. Reduce median width to improve sight distance and safety.
Timeframe Medium Term (6-10 Years)
Estimated Cost $78,500,000.00
City of Baytown - Lee Drive Revitalization
down-arrow
Project ID 653
Agency Name City of Baytown
Project Title Lee Drive Revitalization
Facility/Street/Highway Lee Dr
Limits Market St to SH-99
Description Reconfigure cross section to include reconstruction of 2 lane roadwy with a 12-ft shared-use path separated by a vegetative buffer, pedestrian signals and improvements to signalized intersections.
Timeframe Medium Term (6-10 Years)
Estimated Cost $51,800,000.00
City of Bellaire - Traffic Management System
down-arrow
Project ID 654
Agency Name City of Bellaire
Project Title Traffic Management System
Facility/Street/Highway Multiple (Bellaire Blvd, Bissonnet St, South Rice Ave, Newcastle St, Chimney Rock Rd, Fournace Pl)
Limits From Limit: CHIMNEY ROCK TO NEWCASTLE; CHIMNEY ROCK TO NEWCASTLE To Limit : FOURNACE PLACE TO BEECHNUT; BISSONNET TO BEECHNUT
Description INSTALLATION FIBER OPTIC CABLE AND WIRELESS COMMUNICATION TO SUPPORT CLOSED-CIRCUIT (CCTV) CAMERAS, DYNAMIC MESSAGE SIGNS AND LOOP DETECTOR SENSORS AT 14 EXISTING TRAFFIC SIGNALS MAINTAINED BY THE CITY OF BELLAIRE.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,117,925.00
City of Bellaire - Traffic Signal Timing Optimization Program
down-arrow
Project ID 655
Agency Name City of Bellaire
Project Title Traffic Signal Timing Optimization Program
Facility/Street/Highway Multiple (Bellaire Blvd, Bissonnet St, South Rice Ave, Newcastle St, Chimney Rock Rd, Fournace Pl)
Limits From Limit: VA To Limit : VA
Description TRAFFIC SIGNAL TIMING OPTIMIZATION PROGRAM FOR THE CITY OF BELLAIRE
Timeframe Short Term (0-5 Years)
Estimated Cost $1,002,246.00
City of Bellaire - Pavement Conditions Analysis
down-arrow
Project ID 656
Agency Name City of Bellaire
Project Title Pavement Conditions Analysis
Facility/Street/Highway All roadways maintained by Bellaire
Limits All roadways maintained by Bellaire
Description STUDY TO DETERMINE CONDITIONS OF BELLAIRE ROADWAYS TO ASSIST IN REPAIR/REPLACEMENT PLANNING
Timeframe Short Term (0-5 Years)
Estimated Cost $75,000.00
City of Bellaire - Speed Study
down-arrow
Project ID 657
Agency Name City of Bellaire
Project Title Speed Study
Facility/Street/Highway All roadways maintained by Bellaire
Limits All roadways maintained by Bellaire
Description ANALYSIS OF TRAFFIC FLOW TO DETERMINE IF SPEED LIMITS NEED TO BE UPDATED.
Timeframe Short Term (0-5 Years)
Estimated Cost $50,000.00
City of Conroe - Airport Road Widening
down-arrow
Project ID 658
Agency Name City of Conroe
Project Title Airport Road Widening
Facility/Street/Highway Airport Road
Limits FM 1314 / Porter Rd to FM 3083
Description Widen existing two-lane road (no sidewalks) to four lane with sidewalks. Scope includes stormwater, water, and wastewater.
Timeframe Short Term (0-5 Years)
Estimated Cost $22,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Conroe - Foster Drive Widening
down-arrow
Project ID 659
Agency Name City of Conroe
Project Title Foster Drive Widening
Facility/Street/Highway Foster Drive
Limits S. Frazier St / N. Porter Rd.
Description Widen existing two-lane road (no sidewalks) to four lane with sidewalks. Scope includes stormwater, water, and wastewater.
Timeframe Short Term (0-5 Years)
Estimated Cost $30,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Conroe - Commuter Bus Purchase
down-arrow
Project ID 660
Agency Name City of Conroe
Project Title Commuter Bus Purchase
Facility/Street/Highway N/A
Limits N/A
Description Purchase four (4) commuter bus vehicles.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,500,000.00
City of Conroe - Old Conroe Road
down-arrow
Project ID 661
Agency Name City of Conroe
Project Title Old Conroe Road
Facility/Street/Highway Old Conroe Road
Limits FM 1488 to S LP 336
Description Widening of Old Conroe Road to four (4) lanes and extending the roadway to include a bridge over the west fork of the San Jacinto River.
Timeframe Short Term (0-5 Years)
Estimated Cost $125,000,000.00
City of Dickinson - Dickinson Ave./FM 1266 Safety Improvements
down-arrow
Project ID 662
Agency Name City of Dickinson
Project Title Dickinson Ave./FM 1266 Safety Improvements
Facility/Street/Highway Dickinson Avenue / FM 1266
Limits FM 646 to FM 517
Description The improvement will be a full reconstruction of the roadway including the addition of street lighting, sidewalk facilities, and upgrades to signalized intersection at Deats Road. To accommodate the addition of sidewalks, the existing open ditches will be replaced with culverts.
Timeframe Short Term (0-5 Years)
Estimated Cost $15,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Dickinson - Dickinson High School Pedestrian Enhancements
down-arrow
Project ID 663
Agency Name City of Dickinson
Project Title Dickinson High School Pedestrian Enhancements
Facility/Street/Highway FM 517
Limits Baker Drive to Owens Drive
Description The improvements will include upgrades to the signalized intersection at Owens Drive such as wider sidewalks, updated pedestrian ramps, pedestrian signalization, and enhanced crosswalks. Wider sidewalks will be constucted along FM 517 and improvements will be made to existing midblock crossing at Meadow Glen Drive.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,500,000.00
East Aldine Management District - Bikeways on Aldine Mail Route
down-arrow
Project ID 664
Agency Name East Aldine Management District
Project Title Bikeways on Aldine Mail Route
Facility/Street/Highway Aldine Mail Route Road
Limits US 59 and Hardy Toll Road
Description The proposed improvements include the addition of a 10' sidepath on both side of the corridor.
Timeframe Short Term (0-5 Years)
Estimated Cost $9,000,000.00
East Aldine Management District - Greens Bayou Greenway Trail
down-arrow
Project ID 665
Agency Name East Aldine Management District
Project Title Greens Bayou Greenway Trail
Facility/Street/Highway Greens Bayou
Limits Hardy Toll Road to BW 8 to US 59/Homestead
Description Construct off street trail along Greens Bayou requiring on crossing at signalized intersection and construction of 1 bridge facility.
Timeframe Short Term (0-5 Years)
Estimated Cost $11,000,000.00
East Aldine Management District - Enhance Halls Bayou Trail
down-arrow
Project ID 666
Agency Name East Aldine Management District
Project Title Enhance Halls Bayou Trail
Facility/Street/Highway Halls Bayou
Limits Hardy Toll Road to Keith Wiess Park (southern edge)
Description Construct off street trail along Halls Bayou including construction of 1 bridge facility.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,000,000.00
East Aldine Management District - Hopper Road Complete Street
down-arrow
Project ID 667
Agency Name East Aldine Management District
Project Title Hopper Road Complete Street
Facility/Street/Highway Hopper Road
Limits US 59 to Aldine Westfield Road
Description Retrofit Hopper Road within existing ROW to have one travel lane in each direction with bicycle and pedestrian facilities on both sides.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,000,000.00
East Aldine Management District - Bayou Community Trail
down-arrow
Project ID 668
Agency Name East Aldine Management District
Project Title Bayou Community Trail
Facility/Street/Highway off-street
Limits Greens Bayou to Aldine Town Center
Description Construct off street trail along drainage facility between Greens Bayou and the Aldine Town Center.
Timeframe Medium Term (6-10 Years)
Estimated Cost $4,000,000.00
Friendswood - Friendswood Parkway / Pearland Parkway
down-arrow
Project ID 669
Agency Name Friendswood
Project Title Friendswood Parkway / Pearland Parkway
Facility/Street/Highway Funding will cover street construction, storm sewer and detention if needed
Limits FM 528 to FM 2351
Description Funding will cover street construction, storm sewer and detention if needed
Timeframe Short Term (0-5 Years)
Estimated Cost $14,312,700.00
Friendswood - FM518 at FM 528 Intersection (Phase I)
down-arrow
Project ID 670
Agency Name Friendswood
Project Title FM518 at FM 528 Intersection (Phase I)
Facility/Street/Highway S. Friendswood Drive/FM 528 at E. Parkwood Drive/FM 528.
Limits FM 518 at FM 528
Description Phase 1 includes dual left-turn lanes along FM 518 and optimization of traffic signal timing.
Timeframe Short Term (0-5 Years)
Estimated Cost $396,000.00
Friendswood - FM 528 at Sunset Intersection (Phase 1)
down-arrow
Project ID 671
Agency Name Friendswood
Project Title FM 528 at Sunset Intersection (Phase 1)
Facility/Street/Highway W. Parkwood Drive/FM 528 at Sunset Drive
Limits FM 528 at Sunset
Description Restripe southbound Sunset Drive approach to have a dedicated left-turn lane and a shared left/through lane. Optimize traffic signal timings.
Timeframe Short Term (0-5 Years)
Estimated Cost $55,000.00
Friendswood - FM 518 at FM 2351 Intersection (Phase 1)
down-arrow
Project ID 672
Agency Name Friendswood
Project Title FM 518 at FM 2351 Intersection (Phase 1)
Facility/Street/Highway N. Friendswood Dr/FM 518 at E. Edgewood Dr/FM 2351
Limits FM 518 at FM 2351
Description Left-turns extension on all approaches Southbound right-turn lane
Timeframe Short Term (0-5 Years)
Estimated Cost $374,000.00
Friendswood - FM 528 at Bay Area Blvd Intersection (Phase 1)
down-arrow
Project ID 673
Agency Name Friendswood
Project Title FM 528 at Bay Area Blvd Intersection (Phase 1)
Facility/Street/Highway FM 528 at Bay Area Blvd (Blackhawk Blvd Extension)
Limits FM 528 at Bay Area Blvd
Description Add a through that extends 500 feet north and south of the intersection. Dual eastbound and westbound left-turn lanes.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,067,000.00
Friendswood - E. Parkwood Drive/FM 528 at Winding Way Intersection (Phase 1)
down-arrow
Project ID 674
Agency Name Friendswood
Project Title E. Parkwood Drive/FM 528 at Winding Way Intersection (Phase 1)
Facility/Street/Highway E. Parkwood Dr/FM 528 at Winding Way Dr
Limits E. Parkwood Drive/FM 528 at Winding Way
Description Optimize traffic signal timings
Timeframe Short Term (0-5 Years)
Estimated Cost $8,250.00
Friendswood - Blackhawk Boulevard Phase IIC
down-arrow
Project ID 675
Agency Name Friendswood
Project Title Blackhawk Boulevard Phase IIC
Facility/Street/Highway FM 2351 to Geneva Drive, Thursa Lane to FM 528
Limits FM 2351 to Geneva Drive, Thursa Lane to FM 528
Description Funding will cover street construction and Utilities
Timeframe Short Term (0-5 Years)
Estimated Cost $7,535,402.00
Friendswood - Friendswood Parkway / Pearland Parkway
down-arrow
Project ID 676
Agency Name Friendswood
Project Title Friendswood Parkway / Pearland Parkway
Facility/Street/Highway Funding will cover street construction, storm sewer and detention if needed
Limits FM 2351 to Pearland Parkway
Description Funding will cover street construction, storm sewer and detention if needed
Timeframe Medium Term (6-10 Years)
Estimated Cost $12,043,485.00
Friendswood - FM518 at FM 528 Intersection (Phase 2)
down-arrow
Project ID 677
Agency Name Friendswood
Project Title FM518 at FM 528 Intersection (Phase 2)
Facility/Street/Highway S. Friendswood Drive/FM 528 at E. Parkwood Drive/FM 528.
Limits FM 518 at FM 528
Description Phase 2 includes dual left-turn lanes to match length of existing left-turn lanes on the eastbound and westbound FM 528 approaches and optimization of traffic signal timings
Timeframe Medium Term (6-10 Years)
Estimated Cost $385,000.00
Friendswood - FM 528 at Sunset Intersection (Phase 2)
down-arrow
Project ID 678
Agency Name Friendswood
Project Title FM 528 at Sunset Intersection (Phase 2)
Facility/Street/Highway W. Parkwood Drive/FM 528 at Sunset Drive
Limits FM 528 at Sunset
Description Widening of Sunset Drive approach to include dual left-turn lanes on southbound Sunset Drive approach. Proposed lane configuration would consist of exclusive left-turn lane, a shared left-turn/through lane, and an exclusive right-turn lane. Optimization fo signal timings.
Timeframe Medium Term (6-10 Years)
Estimated Cost $209,000.00
Friendswood - FM 518 at FM 2351 Intersection (Phase 2)
down-arrow
Project ID 679
Agency Name Friendswood
Project Title FM 518 at FM 2351 Intersection (Phase 2)
Facility/Street/Highway N. Friendswood Dr/FM 518 at E. Edgewood Dr/FM 2352
Limits FM 518 at FM 2351
Description Westbound right-turn lane
Timeframe Medium Term (6-10 Years)
Estimated Cost $187,000.00
Friendswood - FM 528 at Bay Area Blvd Intersection (Phase 2)
down-arrow
Project ID 680
Agency Name Friendswood
Project Title FM 528 at Bay Area Blvd Intersection (Phase 2)
Facility/Street/Highway FM 528 at Bay Area Blvd (Blackhawk Blvd Extension)
Limits FM 528 at Bay Area Blvd
Description Blackhawk Blvd extension from FM 528 to Bay Area Blvd
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,214,000.00
Friendswood - E. Parkwood Drive/FM 528 at Winding Way Intersection (Phase 2)
down-arrow
Project ID 681
Agency Name Friendswood
Project Title E. Parkwood Drive/FM 528 at Winding Way Intersection (Phase 2)
Facility/Street/Highway E. Parkwood Dr/FM 528 at Winding Way Dr
Limits E. Parkwood Drive/FM 528 at Winding Way
Description Right turn lane with 100 ft of storage and a 100-foot taper on the northbounds Winding Way Drive approach. Optimize traffic signal timings.
Timeframe Medium Term (6-10 Years)
Estimated Cost $187,000.00
Friendswood - FM 2351 at Beamer Rd
down-arrow
Project ID 682
Agency Name Friendswood
Project Title FM 2351 at Beamer Rd
Facility/Street/Highway FM 2351 at Beamer Rd
Limits FM 2351 at Beamer Rd
Description Northbound and Southbound right-turn lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $343,200.00
Friendswood - FM518 at FM 528 Intersection (Phase 3)
down-arrow
Project ID 683
Agency Name Friendswood
Project Title FM518 at FM 528 Intersection (Phase 3)
Facility/Street/Highway S. Friendswood Drive/FM 528 at E. Parkwood Drive/FM 528.
Limits FM 518 at FM 528
Description Phase 3 includes extending left-turn lanes, 100 feet storage and a 100-ft taper at all approaches, except for the southbound FM 518 approach. Proposed dedicated right-turn lanes on eastbound and wetbound FM 528 approaches with 200-ft storage and 150-ft storage with 100-ft taper, respectively. Extend teh northbound FM 518 right-turn lane, 100 ft storage and 100ft taper. Optimize traffic signal timing.
Timeframe Long Term (More than 10 Years)
Estimated Cost $1,067,000.00
Friendswood - FM 528 at Sunset Intersection (Phase 3)
down-arrow
Project ID 684
Agency Name Friendswood
Project Title FM 528 at Sunset Intersection (Phase 3)
Facility/Street/Highway W. Parkwood Drive/FM 528 at Sunset Drive
Limits FM 528 at Sunset
Description Exclusive southbound Sunset Drive right-turn lane with 150 ft storage and 25 ft taper and an easbound FM 528 right-turn lane with 180 ft of storage and a 25-ft taper. Optimization of traffic signal timings.
Timeframe Long Term (More than 10 Years)
Estimated Cost $214,500.00
Friendswood - FM 528 at Bay Area Blvd Intersection (Phase 3)
down-arrow
Project ID 685
Agency Name Friendswood
Project Title FM 528 at Bay Area Blvd Intersection (Phase 3)
Facility/Street/Highway FM 528 at Bay Area Blvd (Blackhawk Blvd Extension)
Limits FM 528 at Bay Area Blvd
Description Southbound right-turn lane
Timeframe Long Term (More than 10 Years)
Estimated Cost $313,500.00
Friendswood - E. Parkwood Drive/FM 528 at Winding Way Intersection (Phase 3)
down-arrow
Project ID 686
Agency Name Friendswood
Project Title E. Parkwood Drive/FM 528 at Winding Way Intersection (Phase 3)
Facility/Street/Highway E. Parkwood Dr/FM 528 at Winding Way Dr
Limits E. Parkwood Drive/FM 528 at Winding Way
Description Construct a dedicated westbound FM 528 right-turn lane with 300 feet of storage and a 100-ft taper. Optimize traffic signal timings
Timeframe Long Term (More than 10 Years)
Estimated Cost $275,000.00
Friendswood - FM 528 Connection to SH 99
down-arrow
Project ID 687
Agency Name Friendswood
Project Title FM 528 Connection to SH 99
Facility/Street/Highway FM 528 Connection to SH 99
Limits FM 528 Connection to SH 99
Description Roadway connection between FM528 and SH99
Timeframe Long Term (More than 10 Years)
Estimated Cost $3,014,000.00
City of Galveston - Stewart Road - 61st to 75th Streets: Corridor Improvements
down-arrow
Project ID 688
Agency Name City of Galveston
Project Title Stewart Road - 61st to 75th Streets: Corridor Improvements
Facility/Street/Highway Stewart Road
Limits 61st Street to 75th Street
Description Full reconstruction of Stewart Road from 61st to 75th Streets to include a two-way left turn lane, pedestrian improvements (e.g. sidewalks, ADA ramps), traffic signal upgrades (i.e. 65th, 68th, 69th and Colony Park Drive), replacement of water and sanitary sewer infrastructure, storm sewer system improvements, and ROW acquisition (if necessary).
Timeframe Short Term (0-5 Years)
Estimated Cost $46,058,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
City of Galveston - Avenues O & P: 53rd to Seawall Corridor Safety Improvements
down-arrow
Project ID 689
Agency Name City of Galveston
Project Title Avenues O & P: 53rd to Seawall Corridor Safety Improvements
Facility/Street/Highway Avenue O & Avenue P
Limits 53rd Street to Seawall Blvd
Description Install curb extensions, sidewalks and/or a multi-use trail, install ADA ramps, perform traffic signal upgrades, construct storm sewer improvements to accommodate drainage modifications due to improvements made, improve roadway signage and striping for enhanced visibility and safety.
Timeframe Short Term (0-5 Years)
Estimated Cost $31,545,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
City of Galveston - Intersection Improvements: 33rd Street & Seawall Blvd
down-arrow
Project ID 690
Agency Name City of Galveston
Project Title Intersection Improvements: 33rd Street & Seawall Blvd
Facility/Street/Highway Seawall Blvd
Limits 33rd Street
Description Construct a new Traffic Signal
Timeframe Short Term (0-5 Years)
Estimated Cost $525,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Galveston - Bicycle Infrastructure Improvements
down-arrow
Project ID 691
Agency Name City of Galveston
Project Title Bicycle Infrastructure Improvements
Facility/Street/Highway Citywide
Limits
Description Implement new bicycle lanes along various roadway corridors within the City including signage and striping.
Timeframe Short Term (0-5 Years)
Estimated Cost $355,583.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Galveston - Seawall Blvd Traffic: Signal Installation
down-arrow
Project ID 692
Agency Name City of Galveston
Project Title Seawall Blvd Traffic: Signal Installation
Facility/Street/Highway Seawall Blvd
Limits 75th Street & 89th Street
Description This proposed project will add: 1) a new traffic signal at the intersection of 75th Street & Seawall Blvd., and 2) a new traffic signal at the intersection of 89th Street & Seawall Blvd.
Timeframe Short Term (0-5 Years)
Estimated Cost $957,375.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Galveston - Traffic Signal / Safety Improvements
down-arrow
Project ID 693
Agency Name City of Galveston
Project Title Traffic Signal / Safety Improvements
Facility/Street/Highway Citywide
Limits
Description Replace old traffic signal heads, cabinets and controllers; Install new guard rails and battery back ups for traffic signals.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,431,111.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Galveston - Seawall Blvd: Pedestrian Safety & Traffic Calming Measures (12th to 61st Streets)
down-arrow
Project ID 694
Agency Name City of Galveston
Project Title Seawall Blvd: Pedestrian Safety & Traffic Calming Measures (12th to 61st Streets)
Facility/Street/Highway Seawall Blvd
Limits 12th to 61st Streets
Description This proposed project will add: 1) a new low linear barrier along the north side of Seawall Blvd. between 12th & 61st Streets to separate the at grade sidewalk from the adjacent on-street vehicle parking; 2) new traffic calming measures incorporating medians, curb bump outs and high visibility crosswalks at four (4) unsignalized intersections along Seawall Blvd. to reduce speeds along the corridor and enhance pedestrian safety and a new HAWK Pedestrian Crossing in the 5400 Block of Seawall Blvd.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,021,277.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Galveston - Seawall Blvd: Pedestrian Safety & Traffic Calming Measures (61st to 103rd Streets)
down-arrow
Project ID 695
Agency Name City of Galveston
Project Title Seawall Blvd: Pedestrian Safety & Traffic Calming Measures (61st to 103rd Streets)
Facility/Street/Highway Seawall Blvd
Limits 61st to 103rd Streets
Description This proposed project will add: 1) a new low linear barrier along the north side of Seawall Blvd. between 61st & 103rd Streets to separate the at grade sidewalk from the adjacent on-street vehicle parking, and 2) new traffic calming measures incorporating medians, curb bump outs and high visibility crosswalks at give (5) intersections along Seawall Blvd. to reduce speeds along the corridor and enhance pedestrian safety.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,984,900.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Galveston - Downtown Streetscape Improvements
down-arrow
Project ID 696
Agency Name City of Galveston
Project Title Downtown Streetscape Improvements
Facility/Street/Highway
Limits
Description Phase 1 includes streetscape improvements to the downtown area of 23rd Street between Harborside and Church. Phase 2 (FY2025) includes streetscape improvements to the downtown area of 22nd Street
Timeframe Short Term (0-5 Years)
Estimated Cost $4,788,113.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
City of Galveston - Traffic Signal at 28th St/SH-275
down-arrow
Project ID 697
Agency Name City of Galveston
Project Title Traffic Signal at 28th St/SH-275
Facility/Street/Highway SH-275
Limits 28th Street
Description Installation of a Traffic Signal at 28th Street and Harborside Drive
Timeframe Short Term (0-5 Years)
Estimated Cost $500,000.00
City of Galveston - Traffic Signal at 33rd St/SH-275
down-arrow
Project ID 698
Agency Name City of Galveston
Project Title Traffic Signal at 33rd St/SH-275
Facility/Street/Highway SH-275
Limits 33rd Street
Description Installation of a Traffic Signal at 33rd Street and Harborside Drive
Timeframe Short Term (0-5 Years)
Estimated Cost $500,000.00
City of Galveston - Traffic Signal at 16th St/SH-275
down-arrow
Project ID 699
Agency Name City of Galveston
Project Title Traffic Signal at 16th St/SH-275
Facility/Street/Highway SH-275
Limits 16th Street
Description Installation of a Traffic Signal at 16th Street and Harborside Drive
Timeframe Short Term (0-5 Years)
Estimated Cost $500,000.00
City of Hedwig Village - Hedwig Village Commercial Promenade
down-arrow
Project ID 700
Agency Name City of Hedwig Village
Project Title Hedwig Village Commercial Promenade
Facility/Street/Highway Gaylord Drive
Limits Campbell Road to Brogden Road and Bunker Hill Drive to Echo Lane
Description The project will include the addition of a 12' shared-use path on the north side of Gaylord Drive; a landscaped buffer zone of an additional 12' will also be constructed. The existing sidewalk on the south side of Gaylord will be upgraded to a 6' wide facility.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,000,000.00
City of Hedwig Village - Hedwig Village Residential Neighborhood Sidewalk Upgrades
down-arrow
Project ID 701
Agency Name City of Hedwig Village
Project Title Hedwig Village Residential Neighborhood Sidewalk Upgrades
Facility/Street/Highway multiple - Denise Drive, Magdelene Street, Taylorcrest Road, Echo Lane, Piney Point Road, Beinhorn Road, Gaylord Drive, Corbindale Road, Hedwig Road, and Brogden Road
Limits within City limits
Description The project will replace and upgrade existing sidewalks to be 6' wide, upgrade crosswalks, and replace pedestrian ramps.
Timeframe Short Term (0-5 Years)
Estimated Cost $8,000,000.00
City of Iowa Colony - Iowa Colony Blvd Expansion and Improvements (North)
down-arrow
Project ID 702
Agency Name City of Iowa Colony
Project Title Iowa Colony Blvd Expansion and Improvements (North)
Facility/Street/Highway Iowa Colony Blvd
Limits SH 6 to Meridiana Pkwy
Description Improve and expand Iowa Colony Blvd from 2-lane, deteriorated asphalt road to 4-lane concrete boulevard, as identified in the Brazoria County and Iowa Colony Major Thoroughfare Plans.
Timeframe Short Term (0-5 Years)
Estimated Cost $33,000,000.00
City of Iowa Colony - Cedar Rapids Pkwy Expansion and Improvements
down-arrow
Project ID 703
Agency Name City of Iowa Colony
Project Title Cedar Rapids Pkwy Expansion and Improvements
Facility/Street/Highway Cedar Rapids Pkwy (CR57)
Limits FM 521 to SH 288
Description Improve and expand Cedar Rapids Pkwy (CR57) to 4-lane concrete boulevard, as identified in the Brazoria County and Iowa Colony Major Thoroughfare Plans.
Timeframe Short Term (0-5 Years)
Estimated Cost $11,000,000.00
City of Iowa Colony - Davenport Pkwy Expansion and Improvements (East)
down-arrow
Project ID 704
Agency Name City of Iowa Colony
Project Title Davenport Pkwy Expansion and Improvements (East)
Facility/Street/Highway Davenport Pkwy (CR64)
Limits SH 288 to Iowa Colony Blvd
Description Improve and expand Davenport Pkwy (CR64) to 4-lane boulevard, as identified in the Iowa Colony and Brazoria County Major Thoroughfare Plans.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,000,000.00
City of Iowa Colony - Davenport Pkwy Expansion and Improvements (West)
down-arrow
Project ID 705
Agency Name City of Iowa Colony
Project Title Davenport Pkwy Expansion and Improvements (West)
Facility/Street/Highway Davenport Pkwy (CR64)
Limits Ames Blvd to SH 288
Description Improve and expand Davenport Pkwy (CR64) to 4-lane boulevard, as identified in the Iowa Colony and Brazoria County Major Thoroughfare Plans.
Timeframe Medium Term (6-10 Years)
Estimated Cost $11,000,000.00
City of Iowa Colony - Iowa Colony Blvd Expansion and Improvements (South)
down-arrow
Project ID 706
Agency Name City of Iowa Colony
Project Title Iowa Colony Blvd Expansion and Improvements (South)
Facility/Street/Highway Iowa Colony Blvd
Limits Davenport Pkwy (Freedom Field) to Dubuque Pkwy (Municipal Government Complex)
Description Improve and expand Iowa Colony Blvd from 2-lane, deteriorated asphalt road to 4-lane concrete boulevard, as identified in the Brazoria County and Iowa Colony Major Thoroughfare Plans.
Timeframe Medium Term (6-10 Years)
Estimated Cost $13,000,000.00
City of Iowa Colony - Dubuque Parkway Expansion and Improvements
down-arrow
Project ID 707
Agency Name City of Iowa Colony
Project Title Dubuque Parkway Expansion and Improvements
Facility/Street/Highway Dubuque Parkway (CR63)
Limits From SH288 to Iowa Colony Blvd.
Description Improve and expand Dubuque Pkwy (CR 63) to 4-lane concrete boulevard, as identified in the Brazoria County and Iowa Colony Major Thoroughfare Plans.
Timeframe Medium Term (6-10 Years)
Estimated Cost $11,000,000.00
City of Iowa Colony - Ames Bvld Expansion and Improvements
down-arrow
Project ID 708
Agency Name City of Iowa Colony
Project Title Ames Bvld Expansion and Improvements
Facility/Street/Highway Dubuque Parkway (CR63)
Limits From Cedar Rapids Pkwy south approximaltey 3000'
Description Improve and expand Ames Blvd. (CR 48) from 0 to 4-lane concrete boulevard, as identified in the Brazoria County and Iowa Colony Major Thoroughfare Plans.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,000,000.00
City of League City - SH 96 Widening Project, Phase 1: West of Hobbs Rd. intersection to Benson Bayou
down-arrow
Project ID 709
Agency Name City of League City
Project Title SH 96 Widening Project, Phase 1: West of Hobbs Rd. intersection to Benson Bayou
Facility/Street/Highway Highway
Limits Hobbs Rd. to Benson Bayou
Description This project would widen SH 96 from the existing 4-lane divided roadway to a 6-lane divided roadway between Hobbs Road and Benson Bayou. ROW will expand from 120' to 140' in width; estimate approximately 11 acres of land along the SH 96 frontage will need to be acquired for expansion and detention/mitigation needs.
Timeframe Short Term (0-5 Years)
Estimated Cost $46,670,500.00
City of League City - FM 270 Widening Project, Phase 1: Main Street to south of the SH 96 Intersection
down-arrow
Project ID 710
Agency Name City of League City
Project Title FM 270 Widening Project, Phase 1: Main Street to south of the SH 96 Intersection
Facility/Street/Highway Highway
Limits Main Street to SH 96
Description This project would widen FM 270 between Main Street and SH 96 from an existing 2/3 lane roadway to a 4-lane roadway, with sidewalk and/or bike paths. Anticpated that some land acquisition may be needed for detention, right turn lanes, and corner clips.
Timeframe Short Term (0-5 Years)
Estimated Cost $58,745,400.00
City of League City - Texas Ave. Improvements, Phase 1: FM 518 to south of the Walker Street Intersection
down-arrow
Project ID 711
Agency Name City of League City
Project Title Texas Ave. Improvements, Phase 1: FM 518 to south of the Walker Street Intersection
Facility/Street/Highway Street
Limits FM 518 to Walker
Description Improvements along Texas Avenue between FM 518 and Walker Street to provide safe pedestrian access and drainage improvements. Project will also add dedicated left turn lane at the FM 518 intersection. Texas Ave is currently a 2-lane asphalt open-ditch roadway. Proposed improvements could include (a) a 2-lane concrete curb and gutter roadway with 12' lanes, approximately 1,500' of new 24" diam stormsewer and 5' wide sidewalk along the eastern ROW, or (b) a hybrid design with a concrete roadway and mixture of stormsewer and open ditches with a 5' sidewalk on along the eastern ROW. Either option will require some utility adjustments. ROW would need to expand in certain areas for this project. ROW needs are not anticipated to exceed 1 acre in total.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,760,100.00
City of League City - Texas Ave. Improvements, Phase 2: Walker thru Webster St. intersection
down-arrow
Project ID 712
Agency Name City of League City
Project Title Texas Ave. Improvements, Phase 2: Walker thru Webster St. intersection
Facility/Street/Highway Street
Limits Walker to Webster
Description Improvements along Texas Avenue between Walker Street and Webster Street to provide safe pedestrian access and drainage improvements. Texas Ave is currently a 2-lane asphalt open-ditch roadway. The proposed improvements could include (a) a 2-lane concrete curb and gutter roadway with 12' wide lanes, with approximately 2,000' in total of new 24", 30" and 42" diam stormsewer installed along with a 5' wide sidewalk adjusting as needed along the eastern ROW or (b) a hybrid design with a concrete roadway and mixture of storm sewer and open ditches with a 5' sidewalk on along the eastern ROW. Either option will require some utility adjustments. ROW would need to expand in certain areas for this project. ROW needs are not anticipated to exceed 1 acre in total.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,763,700.00
City of League City - FM 2094 Shared Use Path Improvements
down-arrow
Project ID 713
Agency Name City of League City
Project Title FM 2094 Shared Use Path Improvements
Facility/Street/Highway Highway
Limits Twin Oaks Blvd to Lawrence Road
Description Construct 5-foot wide Pedestrian Path and a 10-foot wide Shared Use Path with intersection improvements and pedestrian crossings between Twin Oaks Blvd and Lawrence Road
Timeframe Short Term (0-5 Years)
Estimated Cost $2,300,000.00
City of League City - Hobbs Road Extension to FM 517
down-arrow
Project ID 714
Agency Name City of League City
Project Title Hobbs Road Extension to FM 517
Facility/Street/Highway City Collector
Limits Patagonia Street to FM 517
Description Extend 2-Lanes of Hobbs Road from Patagonia Street to FM 517
Timeframe Short Term (0-5 Years)
Estimated Cost $8,941,250.00
City of League City - Webster Street Sidewalk Improvements
down-arrow
Project ID 715
Agency Name City of League City
Project Title Webster Street Sidewalk Improvements
Facility/Street/Highway City Collector
Limits Texas Ave to Louisiana Ave (Go Forth Elementary School)
Description Construct 5-foot wide Pedestrian Path intersection improvements and pedestrian crossings between Texas Ave and Louisiana Ave. There are no current pedestian pathways along this cooridor that has Goforth Elementary and League City Intermediate School located on Webster Street.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,012,500.00
City of League City - Main Street/E. FM 518 Improvement Project.
down-arrow
Project ID 716
Agency Name City of League City
Project Title Main Street/E. FM 518 Improvement Project.
Facility/Street/Highway Highway
Limits Magnolia Ave to thru Iowa Ave intersection
Description The project includes major renovations proposed for Main Street (E. FM 518) between Magnolia Ave and Iowa Ave. Improvements would include: Landscaping and streetscaping enhancements along Main St including pedestrian improvements, off street parking locations, transferring overhead utilities to underground, and a visible entrance way into the Downtown (sign to be located along FM 518 near Magnolia Ave intersection).
Timeframe Short Term (0-5 Years)
Estimated Cost $13,225,000.00
City of League City - Main Street/E. FM 518 Intersection Improvement Project.
down-arrow
Project ID 717
Agency Name City of League City
Project Title Main Street/E. FM 518 Intersection Improvement Project.
Facility/Street/Highway Highway
Limits Intersection
Description This project will add 230 LF to the existing Left Turn Lane southbound on SH3 at intersection and convert an existing Thru Lane southbound SH3 into a second Left Turn Lane, and a new Right Turn Lane to southbound SH3. An additional 170 LF will be added to an existing Right Thru Lane on southbound SH3 south of the intersection and 400 LF to an existing Left Turn Lane on northbound SH3. A Conversion of an existing Thru Lane on Northbound SH3 at the intersection into a second Left Turn Lane and a new Right Turn Lane to northbound SH3 will be included. Additional 180 LF will be added to the existing Left Turn Lane on eastbound FM518 at intersection with a raised curb median and a new Right Turn Lane eastbound on FM518 at the intersection. A Right Turn/Thru Lane will be converted to a 460 LF Right Turn Lane on westbound FM518 and an additional 110 LF will be added to the Left Turn Lane on westbound FM518. Traffic access management measures will be Implemented with raised curbs.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,425,900.00
City of League City - Smith Lane Sidewalk Improvement
down-arrow
Project ID 718
Agency Name City of League City
Project Title Smith Lane Sidewalk Improvement
Facility/Street/Highway City Collector
Limits Bern Street to Webster Street
Description Construct 5-foot wide Pedestrian Path with intersection improvements and pedestrian crossings between Bern Street and Webster Street. There are no current pedestian pathways along this cooridor that connects several residential developments to Webster Street near both Goforth Elementary and League City Intermediate School.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,150,000.00
City of League City - SH 96 Widening Project, Phase 2: Benson Bayou to East of Hometown Heroes Dr. Intersection
down-arrow
Project ID 719
Agency Name City of League City
Project Title SH 96 Widening Project, Phase 2: Benson Bayou to East of Hometown Heroes Dr. Intersection
Facility/Street/Highway Highway
Limits Benson Bayou to Hometown Heroes Dr.
Description This project would widen SH 96 from the existing 4-lane divided roadway to a 6-lane divided roadway; extend and widen existing fly-over to include SH 3; create access roads as needed to accomodate the extended SH 3 fly-over. ROW will expand from 120' to 140' in width; estimate approximately 3.1 acres of land along the SH 96 frontage will need to be acquired for expansion and detention/mitigation needs.
Timeframe Medium Term (6-10 Years)
Estimated Cost $54,245,270.00
City of League City - FM 270 Widening Project Phase 2: SH 96 to FM 646
down-arrow
Project ID 720
Agency Name City of League City
Project Title FM 270 Widening Project Phase 2: SH 96 to FM 646
Facility/Street/Highway Highway
Limits SH 96 to FM 646
Description This project would widen FM 270 between SH 96 to FM 646 from an existing 2/3 lane roadway to a 4-lane roadway, with sidewalk and/or bike paths. Anticpated that some land acquisition may be needed for detention, right turn lanes, and corner clips.
Timeframe Medium Term (6-10 Years)
Estimated Cost $25,142,400.00
City of League City - Hobbs Road Expansion to 4-Lanes
down-arrow
Project ID 721
Agency Name City of League City
Project Title Hobbs Road Expansion to 4-Lanes
Facility/Street/Highway City Collector
Limits Ervin Street to FM 517
Description Expand 2-lane Hobbs Road to 4-lanes from Ervin Street to FM 517
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,635,000.00
City of Missouri City - US 90A Railroad Crossing Safety Initiative
down-arrow
Project ID 722
Agency Name City of Missouri City
Project Title US 90A Railroad Crossing Safety Initiative
Facility/Street/Highway US 90A at Cravens Rd
Limits Identified Intersection
Description Implement improvements to reduce railroad collisions at intersection and at-grade crossing.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,400,000.00
City of Missouri City - US 90A Railroad Crossing Safety Buildout
down-arrow
Project ID 723
Agency Name City of Missouri City
Project Title US 90A Railroad Crossing Safety Buildout
Facility/Street/Highway US 90A at Cravens Rd
Limits Identified Intersection
Description Implement long-term solutions to reduce railroad collisions at intersection and at-grade crossing.
Timeframe Long Term (More than 10 Years)
Estimated Cost $20,000,000.00
City of Missouri City - ITS Communications Upgrade
down-arrow
Project ID 724
Agency Name City of Missouri City
Project Title ITS Communications Upgrade
Facility/Street/Highway Citywide
Limits City limts & ETJ
Description The project includes the development of Plans, Specifications & Estimates (PS&E) and subsequent construction for upgrading the aging Intelligent Transportation Systems (ITS) wireless communications network architecture, antennae, radios, routers, switchers, and other associated network equipment. Project includes communications equipment upgrades (radio and Ethernet switches) at four existing radio towers, select intersections and CCTV gap locations along select corridors.
Timeframe Short Term (0-5 Years)
Estimated Cost $720,000.00
City of Missouri City - Traffic Management Center Ugprade
down-arrow
Project ID 725
Agency Name City of Missouri City
Project Title Traffic Management Center Ugprade
Facility/Street/Highway Citywide
Limits City limts & ETJ
Description The Traffic Management Center (TMC) project will upgrade the existing TMC including reconfiguring the video wall, replacing the video control system, enhancing operator capabilities. Performing an architectural assessment and proposing architectural upgrades is included. TMC website with traffic conditions and traveler information will also be assessed.
Timeframe Short Term (0-5 Years)
Estimated Cost $480,000.00
City of Missouri City - Hunters Glen Multimodal Improvements
down-arrow
Project ID 726
Agency Name City of Missouri City
Project Title Hunters Glen Multimodal Improvements
Facility/Street/Highway Independence Blvd.
Limits 1340 Independence Blvd.
Description Improve 3510 feet of decomposed granite footpaths to 8-fot wide concrete multiuse activity corridor.
Timeframe Short Term (0-5 Years)
Estimated Cost $270,000.00
City of Missouri City - Pedestrian Bridge
down-arrow
Project ID 727
Agency Name City of Missouri City
Project Title Pedestrian Bridge
Facility/Street/Highway 1) Middle Oyster Creek 2) Channel A
Limits 1) Middle Oyster Creek; connecting proposed trail from Glenn Lakes Lane to Lake Olympia Middle School, and 2) Channel A; connecting proposed trail from Independence Park to American Legion Park, near Bay Shore Boulevard and Waterford Village Boulevard.
Description The City and residents would benefit greatly from increasing the access to desired locations and further connecting the existing parks and trails. Park, near Bay Shore Boulevard and Waterford Village Boulevard.
Timeframe Short Term (0-5 Years)
Estimated Cost $720,000.00
City of Missouri City Parks and Recreation - Hunters Glen Trail
down-arrow
Project ID 728
Agency Name City of Missouri City Parks and Recreation
Project Title Hunters Glen Trail
Facility/Street/Highway Off-Street Trail Independence Blvd
Limits
Description This trail will address the need for safe travel by for pedestrians and bicylclists by connecting Hunters Glen Park, Progressive High School, and the surrounding neighborhoods.
Timeframe Short Term (0-5 Years)
Estimated Cost $260,000.00
City of Missouri City, TxDOT - FM 1092 Widening
down-arrow
Project ID 729
Agency Name City of Missouri City, TxDOT
Project Title FM 1092 Widening
Facility/Street/Highway FM 1092
Limits Missouri City Limits to SH 6
Description Widening existing 4-lane roadway to a 6-lane roadway with medians and\or turn lane improvements. Install sidewalks, improve signals, and evaluate additional operational improvements to provide better through movement along roadway corridor.
Timeframe Medium Term (6-10 Years)
Estimated Cost $20,000,000.00
City of Missouri City, TxDOT - SH 6 Traffic Control Improvements
down-arrow
Project ID 730
Agency Name City of Missouri City, TxDOT
Project Title SH 6 Traffic Control Improvements
Facility/Street/Highway SH 6
Limits Dulles Avenue to N. Creekmont Dr.
Description Implement traffic signal improvements, and evaluate widen roadway from 6 lanes to 8 lanes with turn lane improvements along critical intersections.
Timeframe Long Term (More than 10 Years)
Estimated Cost $30,000,000.00
City of Missouri City, TxDOT - Texas Parkway Shared Use Path
down-arrow
Project ID 731
Agency Name City of Missouri City, TxDOT
Project Title Texas Parkway Shared Use Path
Facility/Street/Highway Texas Parkway/FM2234
Limits US 90 to Turtle Creek Drive (End of City Limits)
Description The Shared Use Path project will design and install shared use paths along priority corridors. The project includes the development of Plans, Specifications & Estimates (PS&E), and subsequent construction of proposed shared use path
Timeframe Short Term (0-5 Years)
Estimated Cost $2,280,000.00
City of Missouri City, TxDOT - Intersection Improvements
down-arrow
Project ID 732
Agency Name City of Missouri City, TxDOT
Project Title Intersection Improvements
Facility/Street/Highway 1) FM 1092 at Cartwright Road 2) SL 8 at Gessner Road 3) FM 1092 at Lexington Boulevard, 4) FM 1092 at SH 6, and 5) SH 6 at Sienna Parkway
Limits Identified Intersections
Description The Intersection Improvements project will expand study on safety and mobility enhancements for priority intersections which have been identified to experience congestion and have a high crash incidence within the City. Studies within this project will analyze the safety and efficiency of the identified intersections, and culminate in actionable geometric and/or operational improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,720,000.00
City of Mont Belvieu - Public Works & Engineering Director
down-arrow
Project ID 733
Agency Name City of Mont Belvieu
Project Title Public Works & Engineering Director
Facility/Street/Highway Eagle Dr.
Limits From Fm 565 to SH 146
Description Reconstruction of 2-lane open ditch to 4-lane Blvd with curb and gutter with sidewalks and bikeway.
Timeframe Short Term (0-5 Years)
Estimated Cost $36,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
City of Mont Belvieu - Public Works & Engineering Director
down-arrow
Project ID 734
Agency Name City of Mont Belvieu
Project Title Public Works & Engineering Director
Facility/Street/Highway FM 565
Limits From SH 99 to Canal St.
Description Reconstruction of 2-lane open ditch to 4-lane Blvd with curb and gutter with sidewalks and bikeway.
Timeframe Short Term (0-5 Years)
Estimated Cost $24,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
City of Mont Belvieu - Public Works & Engineering Director
down-arrow
Project ID 735
Agency Name City of Mont Belvieu
Project Title Public Works & Engineering Director
Facility/Street/Highway Traffic Management Center
Limits City Wide
Description Construction of a traffic management center for the City of Mont Belvieu
Timeframe Short Term (0-5 Years)
Estimated Cost $3,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
City of Pearland - Reid Boulevard Extension (Max Road)
down-arrow
Project ID 736
Agency Name City of Pearland
Project Title Reid Boulevard Extension (Max Road)
Facility/Street/Highway Reid Boulevard (Max Road)
Limits Hughes Ranch Road to McHard
Description Reid Boulevard from Hughes Ranch Road to Mchard Road. Approximately 3,500 LF extension will extend and match the 4-lane boulevard cross-section of Reid Blvd (HRR to FM 518)previously constructed through the TIP program.
Timeframe Short Term (0-5 Years)
Estimated Cost $17,571,000.00
City of Pearland - O'Day Road
down-arrow
Project ID 737
Agency Name City of Pearland
Project Title O'Day Road
Facility/Street/Highway O'Day Road
Limits McHard to Broadway
Description The project consists of 7,800 LF reconstruction of O’Day Road from two lane asphalt to four lanes divided with curb and gutter, underground drainage and a single ten-foot sidewalk along one side. The project will require approximately 9.25 acres of ROW and 15 acres for detention.
Timeframe Short Term (0-5 Years)
Estimated Cost $42,541,000.00
City of Pearland - Reid Boulevard Extension (Max Road)
down-arrow
Project ID 738
Agency Name City of Pearland
Project Title Reid Boulevard Extension (Max Road)
Facility/Street/Highway Reid Boulevard (Max Road)
Limits McHard to Beltway 8
Description Extend Reid Boulevard from McHard Road to BW8. Approximately 7,500 LF extension will match the 4-lane boulevard cross-section of Reid Blvd (McHard to FM 518) to provide connectivity to Beltway 8.
Timeframe Short Term (0-5 Years)
Estimated Cost $63,386,000.00
City of Pearland - Kingsley Drive
down-arrow
Project ID 739
Agency Name City of Pearland
Project Title Kingsley Drive
Facility/Street/Highway Kingsley Drive
Limits Clear Creek to Beltway 8
Description Expand 4,800 feet of Kingsley drive from Clear Creek to Beltway 8. The project will replace a 2-lane road with a 4-lane road connecting HWY 6 to Beltway 8
Timeframe Medium Term (6-10 Years)
Estimated Cost $20,758,000.00
City of Pearland - Harkey Road Expansion
down-arrow
Project ID 740
Agency Name City of Pearland
Project Title Harkey Road Expansion
Facility/Street/Highway Harkey Road
Limits Broadway to Bailey Road
Description The project will widen 7,900 LF of the existing 2 lane roadway to a 4-lane undivided concrete curb and gutter cross-section with a 10’ shared use path from Broadway to Bailey Road.
Timeframe Medium Term (6-10 Years)
Estimated Cost $45,736,000.00
City of Pearland - Miller Ranch Road Expansion
down-arrow
Project ID 741
Agency Name City of Pearland
Project Title Miller Ranch Road Expansion
Facility/Street/Highway Miller Ranch Road
Limits Broadway to Hughes Ranch Rd
Description The project will widen 5,300 LF of the existing 2 lane roadway to a 4-lane undivided concrete curb and gutter cross-section with a 10’ shared use path from Hughes Ranch Road to FM 518.
Timeframe Medium Term (6-10 Years)
Estimated Cost $15,936,000.00
City of Pearland - Veterans Drive Expansion
down-arrow
Project ID 742
Agency Name City of Pearland
Project Title Veterans Drive Expansion
Facility/Street/Highway Veterans Drive
Limits Walnut to Bailey Road
Description This project will consist of the reconstruction of 10,600 feet of Veterans from Walnut to Bailey Road. The street will be constructed as four-lane divided with curb and gutter cross section, underground drainage, detention pond, and a ten-foot-wide sidewalk.
Timeframe Long Term (More than 10 Years)
Estimated Cost $52,500,000.00
City of Pearland - Cullen Parkway Expansion
down-arrow
Project ID 743
Agency Name City of Pearland
Project Title Cullen Parkway Expansion
Facility/Street/Highway Cullen Parkway
Limits Magnolia Parkway (Southfork) to Bailey Road
Description This project will consist of the reconstruction of 4,300 feet of Cullen Parkway from Magnolia Pkwy to Bailey Road. Street will be constructed as 4 lanes divided with curb and gutter cross section, underground drainage, detention pond, one ten-foot-wide sidewalk and add one additional two lane bridge over Mary’s Creek approximately 150 feet in length.
Timeframe Long Term (More than 10 Years)
Estimated Cost $59,230,000.00
City of Pearland - Dixie Farm Road Extension
down-arrow
Project ID 744
Agency Name City of Pearland
Project Title Dixie Farm Road Extension
Facility/Street/Highway Dixie Farm Road
Limits SH 35 to Veterans (Pearland Sites)
Description A 4,800 LF extension of Dixie Farm Road from SH 35 to Pearland Sites (Dixie Farm Rd to existing McKeever Rd). The project would also widen the existing cross-section of McKeever to a 4-lane boulevard and include an above grade crossing over the Railroad. THe project will provide vehicular mobility from HWY35 to FM1128.
Timeframe Long Term (More than 10 Years)
Estimated Cost $50,740,000.00
City of Pearland - Clear Creek Trail
down-arrow
Project ID 745
Agency Name City of Pearland
Project Title Clear Creek Trail
Facility/Street/Highway Clear Creek Trail
Limits Province Village to Dixie Farm
Description Project will consist of the installation of approximately 19,900 LF of 10 foot wide concrete multi-path use, benches, waste receptacles, and appurtenances along Clear Creek (Country Club Dr. to Dixie Farm).
Timeframe Short Term (0-5 Years)
Estimated Cost $10,694,000.00
City of Pearland - Clear Creek Trail
down-arrow
Project ID 746
Agency Name City of Pearland
Project Title Clear Creek Trail
Facility/Street/Highway Clear Creek Trail
Limits SH 288 to Cullen Parkway
Description Project will consist of the installation of approximately 12,950 LF of 10 foot wide concrete multi-path use, benches, waste receptacles, and appurtenances along Clear Creek (SH 288 to Cullen Blvd).
Timeframe Short Term (0-5 Years)
Estimated Cost $7,110,000.00
City of Sugar Land - Soldiers Field Extension/ Roundabout @ First Colony Blvd & Brooks St Improvements (CST1901)
down-arrow
Project ID 747
Agency Name City of Sugar Land
Project Title Soldiers Field Extension/ Roundabout @ First Colony Blvd & Brooks St Improvements (CST1901)
Facility/Street/Highway Soldiers Field Blvd/First Colony Blvd/Brooks Street
Limits From Fluor Daniel Drive to SH6
Description Extend the existing Soldiers Field roadway to SH 6 and install roundabout at the intersection of Soldiers Field and First Colony Boulevard. Project will include sidepaths, buffered bike lanes, and shared lanes.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,400,000.00
City of Sugar Land - Sugar Land Trail Phase 2 (Ditch H Trail) (PK1702)
down-arrow
Project ID 748
Agency Name City of Sugar Land
Project Title Sugar Land Trail Phase 2 (Ditch H Trail) (PK1702)
Facility/Street/Highway Ditch H/ Bullhead Bayou/ CenterPoint Corridor
Limits From Imperial Park to Lexington Blvd near Smart Financial Centre
Description Approx. 4 mile, 10-ft wide concrete trail with below-grade crossings at state highway intersections and three pedestrian bridges
Timeframe Short Term (0-5 Years)
Estimated Cost $8,000,000.00
City of Sugar Land - University Blvd Widening & Intersection Improvements (CST2102/CST2203)
down-arrow
Project ID 749
Agency Name City of Sugar Land
Project Title University Blvd Widening & Intersection Improvements (CST2102/CST2203)
Facility/Street/Highway University Blvd
Limits From New Territory Blvd to Wentworth Ave
Description Widen existing roadway from 4 lanes to six lanes and intersection improvements at Wescott & Branford Place.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,000,000.00
City of Sugar Land - Brazos River Turnaround Alt/UHSL Roadway (CST2103)
down-arrow
Project ID 750
Agency Name City of Sugar Land
Project Title Brazos River Turnaround Alt/UHSL Roadway (CST2103)
Facility/Street/Highway UHSL Roadway/ US 59 Frontage Road
Limits From Wallingford Ave to Grand Pkwy/SH99
Description Design new roadway as low-speed facility using traffic calming, such as raised crosswalks or narrow lanes. Intersection improvements at University Blvd @ US 59 and replace existing substandard bike lane with sidepath in each direction.
Timeframe Short Term (0-5 Years)
Estimated Cost $25,000,000.00
City of Sugar Land - ITS Railroad Monitoring, Notification, & Communication (CTR2203)
down-arrow
Project ID 751
Agency Name City of Sugar Land
Project Title ITS Railroad Monitoring, Notification, & Communication (CTR2203)
Facility/Street/Highway Cravens Road
Limits Pitts Road
Description Install railroad notification DMS prior to RR crossings to reroute traffic; Add Lidar or other technology to the Rail Monitor System to detect trains on dual tracks.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,100,000.00
Regional Goods Movement Questionnaire View Questionnaire
City of Sugar Land - Dulles Avenue Pedestrian Improvements
down-arrow
Project ID 752
Agency Name City of Sugar Land
Project Title Dulles Avenue Pedestrian Improvements
Facility/Street/Highway Dulles Avenue
Limits From Avenue E to 3 Rivers Drive
Description Install 10-ft wide sidepath on one side of street and pedestrian bridge over American Canal near Riverbend Country Club. Pedestrian midblock crossing and connection at Oyster Creek Trail.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,000,000.00
City of Sugar Land - Gannoway Lake Trail
down-arrow
Project ID 753
Agency Name City of Sugar Land
Project Title Gannoway Lake Trail
Facility/Street/Highway Gannoway Lake Park
Limits From Voss Rd to Cullinan Park
Description Approx. 2 mile, 10-ft wide concrete trail with below-grade crossings and two pedestrian bridges
Timeframe Short Term (0-5 Years)
Estimated Cost $2,100,000.00
City of Sugar Land - New Territory Trail
down-arrow
Project ID 754
Agency Name City of Sugar Land
Project Title New Territory Trail
Facility/Street/Highway CenterPoint Corridor
Limits From Wescott Avd to New Terriroty Blvd
Description Approx. 1.5-mile, 10-ft wide concrete trail within CNP easement
Timeframe Short Term (0-5 Years)
Estimated Cost $1,900,000.00
City of Sugar Land - Traffic Signal Detection Update
down-arrow
Project ID 755
Agency Name City of Sugar Land
Project Title Traffic Signal Detection Update
Facility/Street/Highway Various
Limits Various
Description The City has identified the need to update detection to as it reaches end-of-life.
Timeframe Short Term (0-5 Years)
Estimated Cost $600,000.00
City of Sugar Land - Adaptive Signal Timing Update
down-arrow
Project ID 756
Agency Name City of Sugar Land
Project Title Adaptive Signal Timing Update
Facility/Street/Highway Various
Limits Various
Description Update adaptive signal timing for top 3 corridors.
Timeframe Short Term (0-5 Years)
Estimated Cost $540,000.00
City of Sugar Land - ITS Upgrades
down-arrow
Project ID 757
Agency Name City of Sugar Land
Project Title ITS Upgrades
Facility/Street/Highway Citywide ITS
Limits City Limits
Description In order for ITS to continue support mobility goals, hardware and software need to be upgraded after reaching end of life . Major componenets currently need to be replaced due to end of life and some will need to be replaced within 5 years to continue to support future ITS initiatiatives like connected vehicles and others.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,750,000.00
City of Sugar Land - Sweetwater Blvd Reconstruction
down-arrow
Project ID 758
Agency Name City of Sugar Land
Project Title Sweetwater Blvd Reconstruction
Facility/Street/Highway Sweetwater Blvd
Limits From Austin Pkwy to Town Center Blvd
Description Replace Approx. 2 miles of boulevard sectioned roadway and water main, traffic signal upgrades, and pedestrian/bicyclist capacity and enhanced access.
Timeframe Medium Term (6-10 Years)
Estimated Cost $24,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Sugar Land - Williams Trace Blvd Reconstruction
down-arrow
Project ID 759
Agency Name City of Sugar Land
Project Title Williams Trace Blvd Reconstruction
Facility/Street/Highway Williams Trace Blvd
Limits From Lexington Blvd to SH6
Description Reconstruct 4 lane divided roadway including curb and gutter, left turn lanes, inlets and manholes; Construct a triple left from SB Quarry Hill to SB SH6
Timeframe Medium Term (6-10 Years)
Estimated Cost $14,900,000.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Sugar Land - Williams Trace Blvd Widening
down-arrow
Project ID 760
Agency Name City of Sugar Land
Project Title Williams Trace Blvd Widening
Facility/Street/Highway Williams Trace Blvd
Limits From US59 to Oyster Creek
Description Widen from 4 - 6 lanes; Improvements to intersection at 59 & William Trace - Potential Triple Left; Intersection Improvements to Parkway Blvd & Williams Trace, Roadway Improvements to SB Williams Trace- potentially adding an additional right turn lane
Timeframe Medium Term (6-10 Years)
Estimated Cost $22,400,000.00
High Growth Area Needs Questionnaire View Questionnaire
City of Sugar Land - West Airport Blvd
down-arrow
Project ID 761
Agency Name City of Sugar Land
Project Title West Airport Blvd
Facility/Street/Highway West Airport Blvd
Limits From SH6 to Dairy Ashford Rd
Description Replace Approx. 3 miles of roadway
Timeframe Medium Term (6-10 Years)
Estimated Cost $20,000,000.00
City of Sugar Land - Grand Parkway Direct Connectors
down-arrow
Project ID 762
Agency Name City of Sugar Land
Project Title Grand Parkway Direct Connectors
Facility/Street/Highway Grand Parkway - Segment C
Limits US 59
Description Construction four director connectors (TOLL) for traffic flow improvements.
Timeframe Long Term (More than 10 Years)
Estimated Cost $104,000,000.00
City of Sugar Land - Brazos River Multimodal Bridge & Connections
down-arrow
Project ID 763
Agency Name City of Sugar Land
Project Title Brazos River Multimodal Bridge & Connections
Facility/Street/Highway Brazos River Corridor
Limits From Greatwood Community to Brazos River Park
Description Multimodal bridge over the Brazos River connecting from Greatwood to Brazos River Park.
Timeframe Long Term (More than 10 Years)
Estimated Cost $25,000,000.00
City of Sugar Land - Bullhead Bayou Trail
down-arrow
Project ID 764
Agency Name City of Sugar Land
Project Title Bullhead Bayou Trail
Facility/Street/Highway University Blvd
Limits University Blvd to Easton Ave
Description Approx. 1.25 mile trail along Bullhead Bayou within Telfair.
Timeframe Medium Term (6-10 Years)
Estimated Cost $7,000,000.00
City of Sugar Land - East Utility Corridor Greenway
down-arrow
Project ID 765
Agency Name City of Sugar Land
Project Title East Utility Corridor Greenway
Facility/Street/Highway Utility Corridor
Limits SH 6 to Austin Parkway
Description Approx. 1.25 mile trail along utility corridor between Chimneystone and Lakefield neighborhoods and pedestrian bridge connection to Oyster Creek Park over SH6.
Timeframe Medium Term (6-10 Years)
Estimated Cost $11,000,000.00
City of Sugar Land - John Sharp (Owens Rd) Trail
down-arrow
Project ID 766
Agency Name City of Sugar Land
Project Title John Sharp (Owens Rd) Trail
Facility/Street/Highway John Sharp Road
Limits US 90A to Cullinan Park
Description Approx. 1.5 mile trail west of the Sugar Land Regional Airport connecting from US 90A along John Sharp Rd to the existing trail system within Cullinan Park. Includes pedestrian & bicycle improvements at the US 90A and John Sharp Rd intersection.
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
City of Sugar Land - Sugar Land Business Park Trail
down-arrow
Project ID 767
Agency Name City of Sugar Land
Project Title Sugar Land Business Park Trail
Facility/Street/Highway Drainage Corridor
Limits Eldridge Road to West Airport Blvd
Description Approx. 1 mile trail within the Sugar Land Business Park.
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,000,000.00
City of Tomball - Alley Improvement Project
down-arrow
Project ID 768
Agency Name City of Tomball
Project Title Alley Improvement Project
Facility/Street/Highway Street
Limits 200, 300 & 400 blocks of Commerce and Market
Description To improve the connectivity and walkability of the downtown area while providing revitalization of the Main Street area.
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
City of Tomball - South Persimmon Street Widening
down-arrow
Project ID 769
Agency Name City of Tomball
Project Title South Persimmon Street Widening
Facility/Street/Highway Street
Limits South Persimmon from FM 2920 to Medical Complex
Description Widening of a north to south corridor widely used for industrial and commercial purposes due to the businesses located in the area.
Timeframe Medium Term (6-10 Years)
Estimated Cost $4,000,000.00
City of Tomball - Rudolph Road Widening
down-arrow
Project ID 770
Agency Name City of Tomball
Project Title Rudolph Road Widening
Facility/Street/Highway Street
Limits Rudolph Road from Zion Road to Hufsmith Road
Description Widening of a currently undersized road due to safety. The road is experiencing development and the City's wastewater treatment plant is located on this road and does have large deliveries.
Timeframe Long Term (More than 10 Years)
Estimated Cost $2,500,000.00
City of Waller - Schultz Middle School and Waller High School Safe Routes Project
down-arrow
Project ID 771
Agency Name City of Waller
Project Title Schultz Middle School and Waller High School Safe Routes Project
Facility/Street/Highway Field Store Road
Limits Waller Spring Creek Road to Daugherty Street (the project includes other small gap filling connections on Brazeal St., Farr St., Daughterty St., and Waller St.)
Description Construct 6-FT wide sidewalk to connect new Schultz Middle School and new Waller High School to community.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,600,000.00
City of West Columbia, TX - West Columbia Roadway State of Good Repair
down-arrow
Project ID 772
Agency Name City of West Columbia, TX
Project Title West Columbia Roadway State of Good Repair
Facility/Street/Highway Various locally owned and maintained roads within the City limits, a supplemental list can be provided outside of this spreadsheet.
Limits Various limits.
Description Design and reconstruction of approximately 8.61 lane miles of roads within the City. The scope of work is limited to roadway reconstruction, pavement markings, hydromulch, and incidental reconstruction/replacement of driveways and drainage within existing rights-of-way.
Timeframe Short Term (0-5 Years)
Estimated Cost $5,261,200.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Energy Corridor District - Memorial Drive Reconstruction
down-arrow
Project ID 773
Agency Name Energy Corridor District
Project Title Memorial Drive Reconstruction
Facility/Street/Highway Memorial Drive
Limits SH-6 to N. Eldridge Pkwy
Description A redesign and reconstruction of Memorial Drive into a bikable, walkable, and more resilient street. A planning study is underway to determine bicycle, pedestrian, transit, drainage, and safety improvements for this detoriating 2-mile stretch of Memorial Drive. Currently, the road has demonstrated poor pavement conditions, lacks multi-modal features, and contains significant open drainage.
Timeframe Medium Term (6-10 Years)
Estimated Cost $52,403,656.00
Energy Corridor District - Eldridge Pkwy Reconstruction
down-arrow
Project ID 774
Agency Name Energy Corridor District
Project Title Eldridge Pkwy Reconstruction
Facility/Street/Highway Eldridge Parkway
Limits Addicks Reservoir to Briar Forest
Description A complete reconstruction of Eldridge Parkway from the Addicks Reservoir to Briar Forest to address a detoriating and structurally damaged roadway while adding shared use paths and improving pedestrian safety. Eldridge Parkway flooded during Hurrican Harvey and has not received improvements to address flood damage.
Timeframe Long Term (More Than 10 years)
Estimated Cost $98,120,272.00
Energy Corridor District - N. Dairy Ashford Shared Use Paths
down-arrow
Project ID 775
Agency Name Energy Corridor District
Project Title N. Dairy Ashford Shared Use Paths
Facility/Street/Highway N. Dairy Ashford
Limits N. Eldridge Pkwy to IH-10
Description The proposed project will convert existing 6-foot wide sidewalks into 10-foot wide shared use paths for approximately .85 miles along N. Dairy Ashford Rd from I-10 to N. Eldridge Parkway. The shared use paths will close an existing gap in trail connectivity and improve the pedestrian and bicycle infrastructure that connects a 1.3 million sf mixed-use development to office buildings with more than 5,000 employees daily.
Timeframe Short Term (0-5 Years)
Estimated Cost $888,657.00
Energy Corridor District - Park Row Bicycle and Pedestrian Improvements
down-arrow
Project ID 776
Agency Name Energy Corridor District
Project Title Park Row Bicycle and Pedestrian Improvements
Facility/Street/Highway Park Row
Limits SH-6 to N. Eldridge Pkwy
Description The proposed project will construct 1.65 miles of a 10'-12' foot wide shared use path and 6' wide sidewalks along Park Row in the city of Houston, from N. Eldridge Parkway to SH-6. The shared use path and sidewalks will add bicycle and pedestrian infrastructure along a major thoroughfare, connecting office buildings, Terry Hershey Trail and Park, medical facilities, and housing.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,458,435.00
Energy Corridor District - Grisby Square/Addicks Village Infrastructure Enhancements
down-arrow
Project ID 777
Agency Name Energy Corridor District
Project Title Grisby Square/Addicks Village Infrastructure Enhancements
Facility/Street/Highway Grisby Rd, Fortsmith, Addicks Howell Rd, Grasshopper
Limits Grisby Rd from SH-6 to Addicks Howell Rd; Fortsmith from SH-6 to Addicks Howell Rd; Stafford St from IH-10 FR to Grisby Rd; Jackson Ave from IH-10 FR to Grisby Rd;
Description A property line to property line reconstruction of several small blocks in the GrisbySquare/Addicks Village area. Improvements include one travel lane in each direction, sidewalks, and bicycle facilities (potential shared use path along Addicks Howell Rd); and upgrades to stormwater and subsurface utilities.
Timeframe Long Term (More Than 10 years)
Estimated Cost $14,217,750.00
Energy Corridor District - N. Eldridge Pkwy-N. Dairy Ashford/Park Row Intersection Safety Enhancements
down-arrow
Project ID 778
Agency Name Energy Corridor District
Project Title N. Eldridge Pkwy-N. Dairy Ashford/Park Row Intersection Safety Enhancements
Facility/Street/Highway N. Eldridge Parkway-N. Dairy Ashford Intersection
Limits Intersection of N. Eldridge Parkway and N.Dairy Ashford/Park Row
Description A redesign of the intersection to improve vehicular, pedestrian, and bicylcist safety through curb extensions, new mast arms, turning lane removal, median extensions, and a shared use path
Timeframe Short Term (0-5 Years)
Estimated Cost $714,007.00
Energy Corridor District - SH-6 and Grisby Rd. Traffic Signal
down-arrow
Project ID 779
Agency Name Energy Corridor District
Project Title SH-6 and Grisby Rd. Traffic Signal
Facility/Street/Highway SH-6 and Grisby Rd Intersection
Limits Intersection of SH-6 and Grisby Rd
Description A redesign of the intersection to feature a new traffic signal, curb extensions, updated markings, and universal accesibility upgrades
Timeframe Short Term (0-5 Years)
Estimated Cost $671,563.00
Energy Corridor District - SH-6 and Park Row Intersection Enhancements
down-arrow
Project ID 780
Agency Name Energy Corridor District
Project Title SH-6 and Park Row Intersection Enhancements
Facility/Street/Highway SH-6 and Park Row Intersection
Limits Intersection of SH-6 and Park Row
Description A redesign of the intersection to add curb extensions, a Texas U-turn, better signal timing, and leading pedestrian intervals
Timeframe Short Term (0-5 Years)
Estimated Cost $492,279.00
Fort Bend County - SH 99 Frontage Rd (20303a)
down-arrow
Project ID 781
Agency Name Fort Bend County
Project Title SH 99 Frontage Rd (20303a)
Facility/Street/Highway SH 99
Limits NB Cinco Ranch Blvd to Bay Hill
Description Construction of a two lane concrete curb and gutter frontage road.
Timeframe Short Term (0-5 Years)
Estimated Cost $13,600,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - SH 99 Frontage Rd (20303b)
down-arrow
Project ID 782
Agency Name Fort Bend County
Project Title SH 99 Frontage Rd (20303b)
Facility/Street/Highway SH 99
Limits NB Westheimer Pkwy to Cinco Ranch Blvd
Description Construction of a two lane concrete curb and gutter frontage road.
Timeframe Short Term (0-5 Years)
Estimated Cost $12,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - SH 99 Frontage Rd (20307)
down-arrow
Project ID 783
Agency Name Fort Bend County
Project Title SH 99 Frontage Rd (20307)
Facility/Street/Highway SH 99
Limits SB Fry Rd to Westheimer Pkwy
Description Construction of a two lane concrete curb and gutter frontage road.
Timeframe Short Term (0-5 Years)
Estimated Cost $20,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - SH 99 Frontage Rd (203xx)
down-arrow
Project ID 784
Agency Name Fort Bend County
Project Title SH 99 Frontage Rd (203xx)
Facility/Street/Highway SH 99
Limits NB Fry Rd to Westheimer Pkwy
Description Construction of a two lane concrete curb and gutter frontage road.
Timeframe Short Term (0-5 Years)
Estimated Cost $25,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - FM 762 Extension to 10th St (Grade separation over Railroad)
down-arrow
Project ID 785
Agency Name Fort Bend County
Project Title FM 762 Extension to 10th St (Grade separation over Railroad)
Facility/Street/Highway FM 762 (10th St)
Limits Morton to Preston St.
Description Engineering and construction of a bridge over the railroad crossing between Morton St. and Preston St.
Timeframe Short Term (0-5 Years)
Estimated Cost $7,500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - FM 1093 and FM 1489
down-arrow
Project ID 786
Agency Name Fort Bend County
Project Title FM 1093 and FM 1489
Facility/Street/Highway Intersection Improvement
Limits Intersection of FM 1093 and FM 1489
Description Align the intersection in downtown Simonton.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,400,000.00
Fort Bend County - FM 1093
down-arrow
Project ID 787
Agency Name Fort Bend County
Project Title FM 1093
Facility/Street/Highway FM 1093
Limits Fulshear to west of Simonton
Description Construction of four lane roadway.
Timeframe Short Term (0-5 Years)
Estimated Cost $70,000,000.00
Fort Bend County - FM 1489
down-arrow
Project ID 788
Agency Name Fort Bend County
Project Title FM 1489
Facility/Street/Highway FM 1489
Limits SH 36 to I-10
Description Construction of four lane roadway.
Timeframe Short Term (0-5 Years)
Estimated Cost $225,000,000.00
Fort Bend County - Fort Bend Parkway
down-arrow
Project ID 789
Agency Name Fort Bend County
Project Title Fort Bend Parkway
Facility/Street/Highway Fort Bend Pkwy
Limits FM 762 to Sienna Ranch Rd
Description Construction of four lane highway. (including 2 bridge structures)
Timeframe Short Term (0-5 Years)
Estimated Cost $180,000,000.00
Major Projects Questionnaire View Questionnaire
Fort Bend County - FM 2759
down-arrow
Project ID 790
Agency Name Fort Bend County
Project Title FM 2759
Facility/Street/Highway FM 2759
Limits FM 762 to Thompsons (8.25 miles)
Description Construction of a four lane concrete curb and gutter road.
Timeframe Short Term (0-5 Years)
Estimated Cost $100,000,000.00
Fort Bend County - FM 521
down-arrow
Project ID 791
Agency Name Fort Bend County
Project Title FM 521
Facility/Street/Highway SH 6
Limits SH 6 to Brazoria County Line (4.85 miles)
Description Construction of a four lane concrete curb and gutter road.
Timeframe Short Term (0-5 Years)
Estimated Cost $85,000,000.00
Fort Bend County - Humphrey Way
down-arrow
Project ID 792
Agency Name Fort Bend County
Project Title Humphrey Way
Facility/Street/Highway Humphrey Way
Limits Braxton Road to Emmanuel King Road
Description Concrete roadway, 4-12 ft lanes undivided w/ 4 ft shoulders.
Timeframe Short Term (0-5 Years)
Estimated Cost $7,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - FM 2977
down-arrow
Project ID 793
Agency Name Fort Bend County
Project Title FM 2977
Facility/Street/Highway FM 2977
Limits FM 361 to FM 762
Description Partner with Rosenberg for Engineering and Contruction - over all improvements
Timeframe Short Term (0-5 Years)
Estimated Cost $80,000,000.00
Fort Bend County - Austin St
down-arrow
Project ID 794
Agency Name Fort Bend County
Project Title Austin St
Facility/Street/Highway Austin St
Limits 7th St to 90A
Description Sidewalks
Timeframe Short Term (0-5 Years)
Estimated Cost $400,000.00
Fort Bend County - FM 762 (10th St)
down-arrow
Project ID 795
Agency Name Fort Bend County
Project Title FM 762 (10th St)
Facility/Street/Highway FM 762 (10th St)
Limits Clay Street to over the Brazos to meet McCrary/Peek
Description FM 762/10th - over the Brazos to get to Peek and McCrary
Timeframe Short Term (0-5 Years)
Estimated Cost $120,000,000.00
Fort Bend County - FM 762
down-arrow
Project ID 796
Agency Name Fort Bend County
Project Title FM 762
Facility/Street/Highway FM 762
Limits Brazos Center Blvd to FM 2759 (2.55 miles)
Description Construction of a four lane concrete curb and gutter road.
Timeframe Short Term (0-5 Years)
Estimated Cost $30,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - FM 762 BNSF Rail Underpass
down-arrow
Project ID 797
Agency Name Fort Bend County
Project Title FM 762 BNSF Rail Underpass
Facility/Street/Highway FM 2759 & FM 762
Limits FM 762 at BNSF Railroad/FM 2759 Intersection
Description Construction of underpass beneath BNSF Railroad at FM 762
Timeframe Short Term (0-5 Years)
Estimated Cost $50,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County Public Transportation - Bus Support Equipment
down-arrow
Project ID 798
Agency Name Fort Bend County Public Transportation
Project Title Bus Support Equipment
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Bus support equipment and facilities, transit software, hardware and bus wraps FY2020.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,281,000.00
Fort Bend County Public Transportation - Rolling Stock - Replacement
down-arrow
Project ID 799
Agency Name Fort Bend County Public Transportation
Project Title Rolling Stock - Replacement
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Replace 11 transit vehicles FY2024
Timeframe Short Term (0-5 Years)
Estimated Cost $3,809,848.00
Fort Bend County Public Transportation - Bus Support Equipment
down-arrow
Project ID 800
Agency Name Fort Bend County Public Transportation
Project Title Bus Support Equipment
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Bus support equipment and facilities, transit software, hardware and bus wraps FY2021.
Timeframe Short Term (0-5 Years)
Estimated Cost $580,000.00
Fort Bend County Public Transportation - Rolling Stock - Replacement
down-arrow
Project ID 801
Agency Name Fort Bend County Public Transportation
Project Title Rolling Stock - Replacement
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Replace seven (7) transit vehicles FY2023
Timeframe Short Term (0-5 Years)
Estimated Cost $1,942,939.00
Fort Bend County Public Transportation - Bus Support Equipment
down-arrow
Project ID 802
Agency Name Fort Bend County Public Transportation
Project Title Bus Support Equipment
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Bus support equipment and facilities, transit software, hardware and bus wraps FY2023
Timeframe Short Term (0-5 Years)
Estimated Cost $650,000.00
Fort Bend County - Rolling Stock - Replacement
down-arrow
Project ID 803
Agency Name Fort Bend County
Project Title Rolling Stock - Replacement
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Replace nine (9) transit vehicles FY2022
Timeframe Short Term (0-5 Years)
Estimated Cost $2,495,493.00
Fort Bend County Public Transportation - ITS Equipment - Fare Collection System
down-arrow
Project ID 804
Agency Name Fort Bend County Public Transportation
Project Title ITS Equipment - Fare Collection System
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Contactless fare collection system to allow customers to pay transit fare using a mobile device.
Timeframe Short Term (0-5 Years)
Estimated Cost $500,000.00
Fort Bend County Public Transportation - Signage and Wayfinding
down-arrow
Project ID 805
Agency Name Fort Bend County Public Transportation
Project Title Signage and Wayfinding
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description New signs for all FBCT facilities along roadways surrounding facilities. Implement wayfinding improvements to coordinate with the transit, sidewalk and bikeway networks.
Timeframe Short Term (0-5 Years)
Estimated Cost $300,000.00
Fort Bend County Public Transportation - Rolling Stock - Expansion
down-arrow
Project ID 806
Agency Name Fort Bend County Public Transportation
Project Title Rolling Stock - Expansion
Facility/Street/Highway 19820 FM 1093 Rd, Richmond, TX
Limits
Description Acquire six (6) large transit vehicles for expansion service from Westpark Park & Ride.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,758,392.00
Fort Bend County Public Transportation - ITS - Scheduling & Dispatch System
down-arrow
Project ID 807
Agency Name Fort Bend County Public Transportation
Project Title ITS - Scheduling & Dispatch System
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Upgrade scheduling and dispatch system
Timeframe Short Term (0-5 Years)
Estimated Cost $1,750,000.00
Fort Bend County Public Transportation - Rolling Stock - Low Emission Pilot Program
down-arrow
Project ID 808
Agency Name Fort Bend County Public Transportation
Project Title Rolling Stock - Low Emission Pilot Program
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Pilot nine (9) low emission vehicles for Phase II of new downtown service.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,505,526.00
Fort Bend County Public Transportation - Bus Facility -Parking Garage
down-arrow
Project ID 809
Agency Name Fort Bend County Public Transportation
Project Title Bus Facility -Parking Garage
Facility/Street/Highway Thomas Taylor Parkway & Texas Parkway Missouri City, TX
Limits
Description Construct structured TOD parking garage of 400 spaces in downtown Missouri City with bus and passenger accommodations for a permanent park and ride including dedicated bus bays with passenger platforms, passenger waiting shelters and transit information systems.
Timeframe Short Term (0-5 Years)
Estimated Cost $10,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
Fort Bend County Public Transportation - Rolling Stock - Expansion
down-arrow
Project ID 810
Agency Name Fort Bend County Public Transportation
Project Title Rolling Stock - Expansion
Facility/Street/Highway 19820 FM 1093 Rd, Richmond, TX
Limits
Description Acquire six (6) additional large transit vehicles for express services from Westpark Park & Ride.
Timeframe Medium Term (6-10 Years)
Estimated Cost $2,000,714.00
Fort Bend County Public Transportation - Rolling stock - Expansion
down-arrow
Project ID 811
Agency Name Fort Bend County Public Transportation
Project Title Rolling stock - Expansion
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Acquire six (10) additional large transit vehicles and bus support equipment for express services from Westpark Park & Ride.
Timeframe Long Term (More than 10 Years)
Estimated Cost $6,856,000.00
Fort Bend County Public Transportation - Bus Facility - Expand Parking Lot
down-arrow
Project ID 812
Agency Name Fort Bend County Public Transportation
Project Title Bus Facility - Expand Parking Lot
Facility/Street/Highway 19820 FM 1093 Rd, Richmond, TX
Limits
Description Construct additional 500 spaces of park and ride to service express bus and vanpool services to the Energy Corridor, Greenway-Galleria, Downtown and other employment centers. Ultimate lot size to include 1,000 spaces.
Timeframe Long Term (More than 10 Years)
Estimated Cost $3,210,000.00
Fort Bend County Public Transportation - Operations & Maintenance Facility
down-arrow
Project ID 813
Agency Name Fort Bend County Public Transportation
Project Title Operations & Maintenance Facility
Facility/Street/Highway North area of Fort Bend County
Limits
Description Construct a second Fort Bend Transit operations and maintenance facility to support expanded transit services.
Timeframe Long Term (More than 10 Years)
Estimated Cost $4,500,000.00
Fort Bend County Public Transportation - Bus Facility -Parking Garage
down-arrow
Project ID 814
Agency Name Fort Bend County Public Transportation
Project Title Bus Facility -Parking Garage
Facility/Street/Highway 14000 University Boulevard Sugar Land, TX
Limits
Description Construct structured parking garage of 2,500 spaces with bus and passenger accommodations for a permanent park and ride including dedicated bus bays with passenger platforms, passenger waiting shelters and transit information systems.
Timeframe Long Term (More than 10 Years)
Estimated Cost $73,083,000.00
Fort Bend County Public Transportation - Construction - HOV Lane
down-arrow
Project ID 815
Agency Name Fort Bend County Public Transportation
Project Title Construction - HOV Lane
Facility/Street/Highway Westpark Toll Road
Limits SH 99 to IH69
Description Construct bi-directional HOV lane on the Westpark toll road.
Timeframe Long Term (More than 10 Years)
Estimated Cost $0.00
Gulf Coast Transit District - GCTD Universal Accessibility Program
down-arrow
Project ID 822
Agency Name Gulf Coast Transit District
Project Title GCTD Universal Accessibility Program
Facility/Street/Highway Various - Galveston & Brazoria County
Limits District Wide
Description The system consists of a total of 1019 unique Bus Stops. Based on field works, ridership, stakeholder input, and other data three hundred and thirty-one (331) bus stops will receive accessibly improvements in the way of signage, shelters, pads, trash cans and benches.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,300,000.00
Gulf Coast Transit District - Texas City Maintenance Facility
down-arrow
Project ID 823
Agency Name Gulf Coast Transit District
Project Title Texas City Maintenance Facility
Facility/Street/Highway 1415 33rd St. North, Texas City, Texas
Limits None
Description The facilities will include a four-bay maintenance facility (9,000 square feet), a wash building with bus wash bay as well as an undercarriage wash bay with detailed cleaning space (4,564 square feet), an office building with 17 offices (4,800 square feet), a storage building (2,500 square feet), and a storage shed (1,100 square feet).
Timeframe Short Term (0-5 Years)
Estimated Cost $6,000,000.00
Gulf Coast Transit District - GCTD Training Facility and Transit Oriented Development Space
down-arrow
Project ID 824
Agency Name Gulf Coast Transit District
Project Title GCTD Training Facility and Transit Oriented Development Space
Facility/Street/Highway 1415 33rd St. North, Texas City, Texas
Limits None
Description GCTD has seeking funding to build a GCTD training facility (which can be flexed as community space) and transit oriented development space. The project will optimize the commercial value of the proposed development to generate maximum revenue by making the best use of the available piece of property under GCTD control, as well as to meet the needs of the surrounding community.
Timeframe Short Term (0-5 Years)
Estimated Cost $10,000,000.00
Gulf Coast Transit District - Fleet Replacement
down-arrow
Project ID 825
Agency Name Gulf Coast Transit District
Project Title Fleet Replacement
Facility/Street/Highway 1415 33rd St. North, Texas City, Texas
Limits None
Description Replacement of rolling stock (10 buses) that have reached the end of their useful life.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,500,000.00
Gulf Coast Transit District - Brazoria County Park & Ride Facility
down-arrow
Project ID 826
Agency Name Gulf Coast Transit District
Project Title Brazoria County Park & Ride Facility
Facility/Street/Highway 1415 33rd St. North, Texas City, Texas
Limits City of Pearland
Description Planning funds for Engineering, land lease/purchase pursual and other planning activities for a central hub for the Brazoria County Park and ride located in Pearland area to allow for full intergration of this and Metro busses for all Brazoria County residents and Metro UZA residents.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,250,000.00
Gulf Coast Transit District - Demand Response Coverage Area Increase
down-arrow
Project ID 827
Agency Name Gulf Coast Transit District
Project Title Demand Response Coverage Area Increase
Facility/Street/Highway 1415 33rd St. North, Texas City, Texas
Limits Bacliff / San Leon / North Galveston County / City of Pearland and areas in North Brazoria County
Description Providing funds for new vehicles and operating costs for expansion of DR into Pearland (taking over for Harris county rides) and providing full services for the area, as well as Webster and Baycliff. This will be an expansion of the DR to the Houston UZA for areas not being serviced at a full level due to lack of resources. This expansion will focus on the Houston UZA areas in Galveston and Brazoria county.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,250,000.00
Harris County - Barker Cypress Road Capacity and Safety Improvements
down-arrow
Project ID 828
Agency Name Harris County
Project Title Barker Cypress Road Capacity and Safety Improvements
Facility/Street/Highway Barker Cypress Road - HGAN
Limits From: Queenston Blvd/To: North of US 290
Description The proposed project, which is primarily in existing right of way, widens Barker Cypress Road from four to six lanes, converting it from a four-lane asphalt section with open ditch drainage to a six-lane concrete urban section with curb-and-gutter including added sidewalks; the project includes reconstruction of the bridge over the railroad and intersection improvements along Barker Cypress Road at Queenston Boulevard, US 290 eastbound and westbound frontage roads. The improvements will reduce congestion, increase safety in the area, improve pedestrian accommodations, improve drainage due to modernizing the roadway to include curbs and gutters, reduce vehicular emissions attributable to severe traffic congestion, and decrease the travel delays for the Barker Cypress Corridor.
Timeframe Short Term (0-5 Years)
Estimated Cost $60,000,000.00
Harris County Engineering - Safety Improvement Projects on Vision Zero High Injury Network
down-arrow
Project ID 829
Agency Name Harris County Engineering
Project Title Safety Improvement Projects on Vision Zero High Injury Network
Facility/Street/Highway Various locations: Garth Road Stuebner Airline Road Jones Road Atascocita Road Grant Road Louetta Road W Lake Houston Parkway Spring Cypress Road Greenhouse Road (North) Greenhouse Road (South)
Limits Garth Road at Barbers Hill Rd intersection Stuebner Airline Road from N. of Spring Cypress Rd to FM1960 Jones Road from Grant Road to Ranchstone Drive Atascocita Road from Kings Parkway to FM1960 Grant Road from Perry Road to SH249 Louetta Road from SH249 to Cannaberry Way W Lake Houston Pkwy from Pine Cup Dr to Atascocita Middle School South Boundary Spring Cypress Rd from Memorial Springs Dr to W. of Valka Rd. Greenhouse Road (North) from Clay Road to Golden Wave Drive Greenhouse Road (South) from IH10 to Misty Cove Drive
Description Safety projects at various locations to mitigate serious injuries and fatalities on Vision Zero High Injury Network corridors. Signal modifications (leading pedestrian interval, crosswalks, ramps), pedestrian refuge, bike lane improvements, and street lighting. Total: $11,943,671 Garth Road $650,000 Stuebner Airline Road (Streetlights) $506,226 Jones Road $1,158,289 Atascocita Road $2,400,000 Grant Road $87,616 Louetta Road $759,338 W Lake Houston Pkwy $1,500,000 Spring Cypress Road $194,702 Greenhouse Road (North) $1,746,428 Greenhouse Road (South) $2,941,072
Timeframe Short Term (0-5 Years)
Estimated Cost $11,943,671.00
Harris County Engineering - White Oak Bayou Bicycle Pedestrian Bridge Project
down-arrow
Project ID 830
Agency Name Harris County Engineering
Project Title White Oak Bayou Bicycle Pedestrian Bridge Project
Facility/Street/Highway De Soto St.
Limits White Oak Bayou at De Soto St.
Description Pedestrian Bridge , approximately 220' feet span with a 14-ft clear width , and Trail to that will connect the Acres Homes neighborhood to the existing Trail on west-side of White Oak Bayou.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,300,000.00
Harris County Engineering - Mason Creek Trail Extension
down-arrow
Project ID 831
Agency Name Harris County Engineering
Project Title Mason Creek Trail Extension
Facility/Street/Highway Mason Rd./I-10, Colonial Pkwy./ Merchants Way/ 99, Mason Creek.
Limits Mason Rd. and Mason Access Rd. to I-10 and Highway 99.
Description Build Concrete/Asphalt 10' wide trail to connect TXDOT car/vanpool lot under I-10 and provide safe access to Asia Town, HCC, UofH Katy Campus, and Metro Grand Parkway Park and Ride.
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
Harris County Engineering - Old Hwy 146 Reconstruction Project
down-arrow
Project ID 832
Agency Name Harris County Engineering
Project Title Old Hwy 146 Reconstruction Project
Facility/Street/Highway Old Hwy 146
Limits Port Rd to New Hwy 146
Description Project includes a full road reconstruction to a concrete 4 lane road
Timeframe Medium Term (6-10 Years)
Estimated Cost $6,000,000.00
Harris County Engineering - Rankin Road Access Management Project
down-arrow
Project ID 833
Agency Name Harris County Engineering
Project Title Rankin Road Access Management Project
Facility/Street/Highway Rankin Road
Limits IH 45 NBFR to Ranch View Trail
Description Add center two-way left turn lane, signal modifications (leading pedestrian intervals, crosswalks, ADA ramps), and sidewalk improvements to mitigate serious injuries and fatalities on 1.5 mile Vision Zero High Injury Network corridor.
Timeframe Medium Term (6-10 Years)
Estimated Cost $12,200,000.00
Regional Goods Movement Questionnaire View Questionnaire
Harris County Engineering - ITS - CCTV Implementation
down-arrow
Project ID 834
Agency Name Harris County Engineering
Project Title ITS - CCTV Implementation
Facility/Street/Highway County Wide
Limits Unincorporated Harris County
Description Addition of 400 CCTV at various county-wide unincorporated locations to observe and monitor medium to high flood risk road segments. This includes implementation on existing traffic signal devices, new pole-mounted devices and a wireless 5yr contract and server upgrade/software transition costs as part of the estimate.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,700,000.00
Harris County Engineering - Fry Road/Cypress Rose Hill Road ITS Infrastructure Project
down-arrow
Project ID 835
Agency Name Harris County Engineering
Project Title Fry Road/Cypress Rose Hill Road ITS Infrastructure Project
Facility/Street/Highway Fry Road
Limits Clay Road to Louetta Road/Huffmeister Road
Description Installation of ITS infrastructure along the Fry Road/Cypress Rose Hill Road Corridor, From Clay Road to Louetta Road/Huffmeister Road in Harris County
Timeframe Short Term (0-5 Years)
Estimated Cost $8,000,000.00
Harris County Engineering - W Montgomery Road Access Management Project
down-arrow
Project ID 836
Agency Name Harris County Engineering
Project Title W Montgomery Road Access Management Project
Facility/Street/Highway W Montgomery Road
Limits Tomball Pkwy to Wavell St
Description Add center two-way left turn lane, signal modifications (leading pedestrian interval, crosswalks, ramps), and sidwalk improvements to mitigate serious injuries and fatalities on 2 mile Vision Zero High Injury Network corridor.
Timeframe Medium Term (6-10 Years)
Estimated Cost $8,700,000.00
Harris County Engineering - Navigation Blvd Access Management Project
down-arrow
Project ID 837
Agency Name Harris County Engineering
Project Title Navigation Blvd Access Management Project
Facility/Street/Highway Navigation Blvd
Limits Lockwood to S Sgt Macario Garcia
Description Project includes a median reconstruction to add a shared use path, landscaping and sidewalks.
Timeframe Medium Term (6-10 Years)
Estimated Cost $10,000,000.00
Harris County Engineering - Allen Genoa Access Management Project
down-arrow
Project ID 838
Agency Name Harris County Engineering
Project Title Allen Genoa Access Management Project
Facility/Street/Highway Allen Genoa
Limits Queens Road to Genoa Red Bluff
Description Project includes a safety study, design, access management, and implementation of recommended improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $10,000,000.00
Harris County Engineering - Aldine Mail Road Access Management Project
down-arrow
Project ID 839
Agency Name Harris County Engineering
Project Title Aldine Mail Road Access Management Project
Facility/Street/Highway Aldine Mail Road
Limits Airline Dr to Easthampton Dr
Description Raised median improvements, driveway consolidation, signal modifications (leading pedestrian interval, crosswalks, ramps), pedestrian refuge, sidewalk, and street lighting improvements to mitigate serious injuries and fatalities on Vision Zero High Injury Network corridor.
Timeframe Medium Term (3-5 Years)
Estimated Cost $11,500,000.00
Harris County Engineering - Stuebner Airline Drive Access Management Project
down-arrow
Project ID 840
Agency Name Harris County Engineering
Project Title Stuebner Airline Drive Access Management Project
Facility/Street/Highway Stuebner Airline Drive
Limits Lyons School Rd to Naremore Dr
Description Raised median improvements, driveway consolidation, signal modifications (leading pedestrian interval, crosswalks, ramps), and sidewalk improvements to mitigate serious injuries and fatalities on 4.5 mile Vision Zero High Injury Network corridor.
Timeframe Short Term (0-5 Years)
Estimated Cost $11,800,000.00
Harris County Engineering - Wallisville Rd Reconstruction Project
down-arrow
Project ID 841
Agency Name Harris County Engineering
Project Title Wallisville Rd Reconstruction Project
Facility/Street/Highway Wallisville Road - HGAN
Limits Maxey to 1,000 East of Uvalde Rd
Description curb and gutter drainage, access management, shared use path, sidewalks and landscaping, Signal modifications (leading pedestrian interval, crosswalks, ramps) and signal timing improvements to mitigate serious injuries and fatalities on Vision Zero High Injury Network corridor.
Timeframe Short Term (0-5 Years)
Estimated Cost $50,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Harris County Engineering - E Mount Houston Reconstruction Project
down-arrow
Project ID 842
Agency Name Harris County Engineering
Project Title E Mount Houston Reconstruction Project
Facility/Street/Highway E Mount Houston
Limits Keith Weiss to Hirsch Rd.
Description Project includes a full road reconstruction, drainage, sidewalks and landscaping
Timeframe Medium Term (6-10 Years)
Estimated Cost $15,000,000.00
Harris County Engineering - Fairmont Parkway Accesss Management and Safety Improvement Project
down-arrow
Project ID 843
Agency Name Harris County Engineering
Project Title Fairmont Parkway Accesss Management and Safety Improvement Project
Facility/Street/Highway Fairmont Parkway
Limits Allen Genoa to Broadway St
Description Project includes a safety study design, and implementation of recommended access management and safety improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $60,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Harris County Engineering - CE King Parkway Project
down-arrow
Project ID 844
Agency Name Harris County Engineering
Project Title CE King Parkway Project
Facility/Street/Highway CE King Parkway
Limits Tidwell to BW 8
Description Expansion from 2 to 4 lanes and addition of bicycle pedestrian trail
Timeframe Short Term (0-5 Years)
Estimated Cost $27,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Harris County Engineering - Veterans Memorial Drive Access Management Project
down-arrow
Project ID 845
Agency Name Harris County Engineering
Project Title Veterans Memorial Drive Access Management Project
Facility/Street/Highway Veterans Memorial Drive
Limits FM 1960 to SH 249
Description Raised median improvements, driveway consolidation, signal modifications (leading pedestrian interval, crosswalks, ramps), pedestrian refuge, sidewalk, and street lighting improvements to mitigate serious injuries and fatalities on 7.5 mile Vision Zero High Injury Network corridor.
Timeframe Medium Term (6-10 Years)
Estimated Cost $34,100,000.00
Harris County Engineering - Spencer Hwy. Access Management Project
down-arrow
Project ID 846
Agency Name Harris County Engineering
Project Title Spencer Hwy. Access Management Project
Facility/Street/Highway Spencer Hwy.
Limits I-45 to TX-146
Description Raised median improvements, driveway consolidation, signal modifications (leading pedestrian interval, crosswalks, ramps), sidewalk, and bike lane improvements to mitigate serious injuries and fatalities on Vision Zero High Injury Network corridor.
Timeframe Medium Term (6-10 Years)
Estimated Cost $28,200,000.00
Harris County Engineering - Gulf Bank Road Reconstruction Project
down-arrow
Project ID 847
Agency Name Harris County Engineering
Project Title Gulf Bank Road Reconstruction Project
Facility/Street/Highway Gulf Bank Road
Limits IH-45 to Hardy Toll Road
Description The proposed improvements consist of reconstructing Gulf Bank Road as a 4-lane divided boulevard with 8-foot to 10-foot multi-use paths, pedestrian ramps, landscaping, modernized traffic signals at Sweetwater Lane and Airline Drive, a closed drainage system, detention ponds, and appropriate signage and striping
Timeframe Medium Term (6-10 Years)
Estimated Cost $30,000,000.00
Harris County Engineering - Red Bluff Road Reconstruction Project
down-arrow
Project ID 848
Agency Name Harris County Engineering
Project Title Red Bluff Road Reconstruction Project
Facility/Street/Highway Red Bluff Rd.
Limits Spencer Hwy to Kirby road.
Description Project includes a full road reconstruction, shared use path and landscaping
Timeframe Medium Term (6-10 Years)
Estimated Cost $31,500,000.00
Harris County Engineering - FM 2920 Intersection Improvements
down-arrow
Project ID 849
Agency Name Harris County Engineering
Project Title FM 2920 Intersection Improvements
Facility/Street/Highway FM 2920
Limits US 290 to Telge Road
Description Construct full boulevard segment 1,000' north and south on major thoroughfares that intersect FM 2920. Should include drainage, ROW, signals, pedestrian accomodations, etc.
Timeframe Medium Term (6-10 Years)
Estimated Cost $36,000,000.00
Harris County Engineering - Expanding ITS Infrastructure - Traffic Control signals
down-arrow
Project ID 850
Agency Name Harris County Engineering
Project Title Expanding ITS Infrastructure - Traffic Control signals
Facility/Street/Highway County Wide
Limits Unincorporated Harris County
Description Study, design, and construct traffic control signals upto 83 intersections that based on land use analysis, showcase an activity of 10k average daily trips, providing critical congestion, safety and access management improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $40,000,000.00
Harris County Engineering - Sheldon Road (North) Improvement Project
down-arrow
Project ID 851
Agency Name Harris County Engineering
Project Title Sheldon Road (North) Improvement Project
Facility/Street/Highway Sheldon Road
Limits US90 to Sheldon Ridge
Description Reconstruct and widen, existing 2 lane concrete overlaid with asphalt to 4 lanes of reinforced 12" concrete roadway. Includes bridge section, 2 major throughfare intersections and multiple industrial/ commercial business entrances. drainage, sidewalks and landscaping and safety. Considering existing railroad at-grade crossing to be a separate line item.
Timeframe Short Term (0-5 Years)
Estimated Cost $22,800,000.00
Regional Goods Movement Questionnaire View Questionnaire
Harris County Engineering - ITS - Upgrading of Aging Infrastructure - Traffic Control signals
down-arrow
Project ID 852
Agency Name Harris County Engineering
Project Title ITS - Upgrading of Aging Infrastructure - Traffic Control signals
Facility/Street/Highway County Wide
Limits County Wide
Description Replacement of 450 aging traffic signal intersections (over 20 years) operated by Harris County Engineering. This includes new hardware, and a wireless 5yr contract and server upgrade/software transition costs as part of the estimate.
Timeframe Short Term (0-5 Years)
Estimated Cost $55,000,000.00
Harris County Engineering - Market Street - Channelview Reconstruction Project
down-arrow
Project ID 853
Agency Name Harris County Engineering
Project Title Market Street - Channelview Reconstruction Project
Facility/Street/Highway Market Street - Channelview
Limits IH-10 to Monmoth
Description Project includes a full road reconstruction, drainage, shared use path, sidewalks and landscaping
Timeframe Short Term (0-5 Years)
Estimated Cost $56,000,000.00
Harris County Engineering - Bourgeois Rd Street Improvements
down-arrow
Project ID 854
Agency Name Harris County Engineering
Project Title Bourgeois Rd Street Improvements
Facility/Street/Highway Bourgeois Rd
Limits Cutten Rd to West Richey Rd
Description Sidewalks, Intersection and roadway improvements to address multimodal accessibility and traffic circulation.
Timeframe Short Term (0-5 Years)
Estimated Cost $12,000,000.00
Harris County Engineering - Hillcroft Street Trail
down-arrow
Project ID 855
Agency Name Harris County Engineering
Project Title Hillcroft Street Trail
Facility/Street/Highway Hillcroft Street
Limits Willow Bend to UPRR
Description Multimodal and safety improvements along Hillcroft Corridor
Timeframe Short Term (0-5 Years)
Estimated Cost $7,000,000.00
Harris County Engineering - Jacintoport Blvd Rehabililtation
down-arrow
Project ID 856
Agency Name Harris County Engineering
Project Title Jacintoport Blvd Rehabililtation
Facility/Street/Highway Jacintoport Blvd
Limits Sheldon to Penn City Rd
Description Rehabiliataion of Jacintoport Blvd and extension to connect to Penn City Rd
Timeframe Short Term (0-5 Years)
Estimated Cost $10,000,000.00
Harris County Redevelopment Authority - Kirby Drive Extension
down-arrow
Project ID 857
Agency Name Harris County Redevelopment Authority
Project Title Kirby Drive Extension
Facility/Street/Highway Street
Limits Holmes Rd. to Sam Houston Tollway South
Description Proposed Kirby Dr. is a multimodal thoroughfare consisiting of 3 segments: Segment 1 - construct a 4-lane from Holmes Rd. to Airport Blvd. with grade separation at Almeda Rd., Segment 2 - construct a bridge crossing Sims Bayou connecting to W. Orem Dr., Segment 3 - construct a 4-lane from Nichol Woods Dr. to Sam Houston Tollway South. Kirby Dr. is designated as a transit corridor from Fannin terminus at Feldman St. (west of Almeda Rd) to Airport Blvd.
Timeframe Medium Term (6-10 Years)
Estimated Cost $110,000,000.00
Major Projects Questionnaire View Questionnaire
Harris County Redevelopment Authority - Almeda Road, IH 610, SH 288 Connectors
down-arrow
Project ID 858
Agency Name Harris County Redevelopment Authority
Project Title Almeda Road, IH 610, SH 288 Connectors
Facility/Street/Highway Street/Highway
Limits North bound SH 288 to west bound IH 610 frontage to Almeda Rd.; south bound Almeda Rd. near Holly Hall St. to east bound IH 610 to south bound SH 288; SH 288 south bound frontage road crossing Holmes Rd.
Description Proposed project consists of 3 segments: Segment 1 - Construct a single-lane from SH 288/IH610 off ramp to IH 610 westbound frontage; Segment 2 - Construct a single-lane elevated ramp connecting Almeda Rd. southbound to IH 610 eastbound; Segment 3 - construct a grade separation crossing Holmes Rd to have continuous SH 288 frontage southbound.
Timeframe Long Term (More than 10 Years)
Estimated Cost $150,000,000.00
METRO - 3 Additional Curb to Curb Services
down-arrow
Project ID 859
Agency Name METRO
Project Title 3 Additional Curb to Curb Services
Facility/Street/Highway VA
Limits Within defined zone
Description Shuttle service within selected communities that lack convenient access to transit $12 million/annually ($4 million/annually each)
Timeframe Short Term (0-5 Years)
Estimated Cost $60,000,000.00
METRO - 54 Scott BOOST Corridor
down-arrow
Project ID 860
Agency Name METRO
Project Title 54 Scott BOOST Corridor
Facility/Street/Highway VA
Limits Downtown TC to MLK Health Center (Swingle Rd)
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Short Term (0-5 Years)
Estimated Cost $25,000,000.00
METRO - 56 Airline/Montrose BOOST
down-arrow
Project ID 861
Agency Name METRO
Project Title 56 Airline/Montrose BOOST
Facility/Street/Highway VA
Limits TMC/Rice TC to Greenspoint TC
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Short Term (0-5 Years)
Estimated Cost $30,000,000.00
METRO - 82 Westheimer BOOST
down-arrow
Project ID 862
Agency Name METRO
Project Title 82 Westheimer BOOST
Facility/Street/Highway VA
Limits Milam @ SP 527 to SH 6 (West Oaks Mall)
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Short Term (0-5 Years)
Estimated Cost $42,546,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
METRO - Bus Fleet Conversion to Zero Emissions Vehicles
down-arrow
Project ID 863
Agency Name METRO
Project Title Bus Fleet Conversion to Zero Emissions Vehicles
Facility/Street/Highway VA - within METRO service area
Limits
Description Replace diesel buses with zero emissions buses $26 million/annually
Timeframe Short Term (0-5 Years)
Estimated Cost $130,000,000.00
METRO - Bus Shelter Program
down-arrow
Project ID 864
Agency Name METRO
Project Title Bus Shelter Program
Facility/Street/Highway VA - within METRO service area
Limits
Description Service area wide program to replace aging shelters
Timeframe Short Term (0-5 Years)
Estimated Cost $25,000,000.00
METRO - Denver Harbor Transit Center
down-arrow
Project ID 865
Agency Name METRO
Project Title Denver Harbor Transit Center
Facility/Street/Highway Lockwood @ Temper
Limits
Description Relocate, Expand and Replace Existing Facility
Timeframe Short Term (0-5 Years)
Estimated Cost $34,500,000.00
METRO - Emergency & Community Services Bldg.
down-arrow
Project ID 866
Agency Name METRO
Project Title Emergency & Community Services Bldg.
Facility/Street/Highway Main Street
Limits @ Downtown TC (Main St. and St. Joseph St.)
Description Construction of new METRO PD emergency services & transit customer services building
Timeframe Short Term (0-5 Years)
Estimated Cost $57,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
METRO - Gulfton BRT
down-arrow
Project ID 867
Agency Name METRO
Project Title Gulfton BRT
Facility/Street/Highway Gulfton St.
Limits Uptwon TC to Gulfton/Chimnery Rock Rd
Description Southern extension of Silver Line from Uptown TC to Gulfton
Timeframe Short Term (0-5 Years)
Estimated Cost $250,000,000.00
METRO - Hiram Clarke curb2curb service
down-arrow
Project ID 868
Agency Name METRO
Project Title Hiram Clarke curb2curb service
Facility/Street/Highway VA
Limits Within defined zone
Description Shuttle service within selected communities that lack convenient access to transit $4 million/annually
Timeframe Short Term (0-5 Years)
Estimated Cost $20,000,000.00
METRO - I 69 2-way HOV - Phase 1
down-arrow
Project ID 869
Agency Name METRO
Project Title I 69 2-way HOV - Phase 1
Facility/Street/Highway I 69 S
Limits Milam @ SP 527 to IH 610 W
Description Convert 1-way to 2-way HOV
Timeframe Short Term (0-5 Years)
Estimated Cost $85,000,000.00
METRO - Inner Katy Busway
down-arrow
Project ID 870
Agency Name METRO
Project Title Inner Katy Busway
Facility/Street/Highway Northwest TC
Limits Downtown HOV connector ramp
Description Dedicated busway
Timeframe Short Term (0-5 Years)
Estimated Cost $665,000,000.00
METRO - Missouri City Park & Ride Capitalized Lease
down-arrow
Project ID 871
Agency Name METRO
Project Title Missouri City Park & Ride Capitalized Lease
Facility/Street/Highway SH 6
Limits @ Vicksburg
Description Private partner to develop parking garage to service site; METRO to enter into extended lease for use of garage for P&R service
Timeframe Short Term (0-5 Years)
Estimated Cost $52,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
METRO - New Bus Operating Facility in Western Service Area
down-arrow
Project ID 872
Agency Name METRO
Project Title New Bus Operating Facility in Western Service Area
Facility/Street/Highway VA - within METRO service area
Limits
Description Construct new BOF to accommodate low-to no emmission infrastructure to support existing needs as well as new BRT lines.
Timeframe Short Term (0-5 Years)
Estimated Cost $300,000,000.00
METRO - Northline TC
down-arrow
Project ID 873
Agency Name METRO
Project Title Northline TC
Facility/Street/Highway Fulton St.
Limits @ Julia St.
Description Construct new multi-level TC on new location to replace existing Northline TC
Timeframe Short Term (0-5 Years)
Estimated Cost $42,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
METRO - Other BOOST Corridors (3)
down-arrow
Project ID 874
Agency Name METRO
Project Title Other BOOST Corridors (3)
Facility/Street/Highway VA
Limits VA
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Short Term (0-5 Years)
Estimated Cost $75,000,000.00
METRO - Regional Transit Fare System Implementation - Fare Box Replacement
down-arrow
Project ID 875
Agency Name METRO
Project Title Regional Transit Fare System Implementation - Fare Box Replacement
Facility/Street/Highway VA
Limits
Description Replace current multiagency fare boxes with new universal fareboxes that offer cash payment
Timeframe Short Term (0-5 Years)
Estimated Cost $100,000,000.00
METRO - TMC Transit Center State of Good Repair
down-arrow
Project ID 876
Agency Name METRO
Project Title TMC Transit Center State of Good Repair
Facility/Street/Highway Replace TMC transit center elevators, escalators
Limits Fannin @ Pressler
Description Replace elevators, escalators at TMC Red Line Transit Center
Timeframe Short Term (0-5 Years)
Estimated Cost $40,000,000.00
METRO - Sunnyside curb2curb service
down-arrow
Project ID 877
Agency Name METRO
Project Title Sunnyside curb2curb service
Facility/Street/Highway VA
Limits Within defined zone
Description Shuttle service within selected communities that lack convenient access to transit $4 million/annually
Timeframe Short Term (0-5 Years)
Estimated Cost $20,000,000.00
METRO - Universal Accessibility (UA) - Phase 2
down-arrow
Project ID 878
Agency Name METRO
Project Title Universal Accessibility (UA) - Phase 2
Facility/Street/Highway VA - within METRO service area
Limits
Description Implement UA standards that exceed federal ADA requirements; improved bus shelters and pads, level boarding, assessible ramps, sidewalk improvements, and other stop improvements designed to improve accessibility
Timeframe Short Term (0-5 Years)
Estimated Cost $30,000,000.00
METRO - West Bellfort Park and Ride
down-arrow
Project ID 879
Agency Name METRO
Project Title West Bellfort Park and Ride
Facility/Street/Highway West Bellfort Ave.
Limits @ Roark Road
Description Reconstruct existing park and ride to add capacity and improve service
Timeframe Short Term (0-5 Years)
Estimated Cost $80,000,000.00
METRO - Wheeler Intermodal Terminal
down-arrow
Project ID 880
Agency Name METRO
Project Title Wheeler Intermodal Terminal
Facility/Street/Highway @ Main St.
Limits
Description Replace existing TC with expanded intermodal terminal to connect light rail and University BRT
Timeframe Short Term (0-5 Years)
Estimated Cost $60,000,000.00
METRO - Zero Emissionsn Infrastructure & Readiness
down-arrow
Project ID 881
Agency Name METRO
Project Title Zero Emissionsn Infrastructure & Readiness
Facility/Street/Highway VA - within METRO service area
Limits
Description Retrofit existing facilities for charging/refueliing infrastructure and related improvements to psupport fleet conversion to ZEVs
Timeframe Short Term (0-5 Years)
Estimated Cost $100,000,000.00
METRO - Other BOOST Corridors (4 corridors)
down-arrow
Project ID 882
Agency Name METRO
Project Title Other BOOST Corridors (4 corridors)
Facility/Street/Highway VA
Limits VA
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Medium Term (6-10 Years)
Estimated Cost $100,000,000.00
METRO - Buffalo Bayou Day Lot
down-arrow
Project ID 883
Agency Name METRO
Project Title Buffalo Bayou Day Lot
Facility/Street/Highway @ McKee St.
Limits
Description Relocate and expand existing mid-day layover facility
Timeframe Medium Term (6-10 Years)
Estimated Cost $100,000,000.00
METRO - Connection to HSR terminal
down-arrow
Project ID 884
Agency Name METRO
Project Title Connection to HSR terminal
Facility/Street/Highway North Post Oak
Limits NWTC to HSR Terminal (former site of NW Mall)
Description New busway
Timeframe Medium Term (6-10 Years)
Estimated Cost $106,000,000.00
METRO - Extension of Purple Line
down-arrow
Project ID 885
Agency Name METRO
Project Title Extension of Purple Line
Facility/Street/Highway Rusk/Capitol St.
Limits Theater District to Municipal Courthouse
Description Extend existing LRT
Timeframe Short Term (0-5 Years)
Estimated Cost $40,000,000.00
METRO - Gessner BOOST
down-arrow
Project ID 886
Agency Name METRO
Project Title Gessner BOOST
Facility/Street/Highway Gessner Rd.
Limits W Little York P&R to Fondren Meadow Dr.
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Medium Term (6-10 Years)
Estimated Cost $25,000,000.00
METRO - Gulfton TC
down-arrow
Project ID 887
Agency Name METRO
Project Title Gulfton TC
Facility/Street/Highway Gulfton St.
Limits @Gulfton St
Description Construct new transit center
Timeframe Long Term (6-10 Years)
Estimated Cost $52,000,000.00
METRO - I 45 S HOV
down-arrow
Project ID 888
Agency Name METRO
Project Title I 45 S HOV
Facility/Street/Highway Downtown
Limits Bay Area Blvd.
Description Convert 1-way to 2-way HOV
Timeframe Medium Term (6-10 Years)
Estimated Cost $122,000,000.00
METRO - I 45 S HOV
down-arrow
Project ID 889
Agency Name METRO
Project Title I 45 S HOV
Facility/Street/Highway I 45 S
Limits Nasa 1 Bypass to SH 146
Description Construct 2-way diamond lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $668,000,000.00
METRO - I 69 2-way HOV - Phase 2
down-arrow
Project ID 890
Agency Name METRO
Project Title I 69 2-way HOV - Phase 2
Facility/Street/Highway I 69 S
Limits Loop 610W to BW 8
Description Convert 1-way to 2-way HOV
Timeframe Medium Term (6-10 Years)
Estimated Cost $50,000,000.00
Major Projects Questionnaire View Questionnaire
METRO - Louetta P&R
down-arrow
Project ID 891
Agency Name METRO
Project Title Louetta P&R
Facility/Street/Highway SH 249
Limits @ Louetta Rd.
Description Construct new park & ride
Timeframe Medium Term (6-10 Years)
Estimated Cost $52,000,000.00
METRO - Missouri City Park & Ride
down-arrow
Project ID 892
Agency Name METRO
Project Title Missouri City Park & Ride
Facility/Street/Highway US 90A@BW 8
Limits
Description Construct new park and ride in vicinity of US 90A and BW 8
Timeframe Medium Term (6-10 Years)
Estimated Cost $36,000,000.00
METRO - P&R Service Enhancements/FLM Improvements for Reverse Commute
down-arrow
Project ID 893
Agency Name METRO
Project Title P&R Service Enhancements/FLM Improvements for Reverse Commute
Facility/Street/Highway VA - within METRO service area
Limits
Description Modify/improve service and facilities to accommodate reverse commute and enhance FLM connectivity
Timeframe Medium Term (6-10 Years)
Estimated Cost $20,000,000.00
METRO - SH 249 HOV
down-arrow
Project ID 894
Agency Name METRO
Project Title SH 249 HOV
Facility/Street/Highway SH 249
Limits Boudreaux Rd. to Hollister Dr.
Description Construct new 2-way HOV facility
Timeframe Medium Term (6-10 Years)
Estimated Cost $301,000,000.00
METRO - SH 249 P&R
down-arrow
Project ID 895
Agency Name METRO
Project Title SH 249 P&R
Facility/Street/Highway SH 249
Limits @ Boudreaux Rd.
Description Construct new park & ride
Timeframe Medium Term (6-10 Years)
Estimated Cost $52,000,000.00
METRO - State of Good Repair
down-arrow
Project ID 896
Agency Name METRO
Project Title State of Good Repair
Facility/Street/Highway VA - within METRO service area
Limits
Description Upgrade, rehab and retrofit facilities and infrastructure as needed to maintain SOGR
Timeframe Medium Term (6-10 Years)
Estimated Cost $100,000,000.00
METRO - Tidwell Intermodal Center
down-arrow
Project ID 897
Agency Name METRO
Project Title Tidwell Intermodal Center
Facility/Street/Highway VA
Limits @ Tidwell
Description Construct new multimodal center
Timeframe Short Term (6-10 Years)
Estimated Cost $52,000,000.00
METRO - Universal Accessibility (UA) - Phase 3
down-arrow
Project ID 898
Agency Name METRO
Project Title Universal Accessibility (UA) - Phase 3
Facility/Street/Highway VA - within METRO service area
Limits
Description Program to standardize all bus stops to meet & exceed ADA requirements
Timeframe Medium Term (6-10 Years)
Estimated Cost $30,000,000.00
METRO - University BRT
down-arrow
Project ID 899
Agency Name METRO
Project Title University BRT
Facility/Street/Highway VA
Limits
Description Construct new BRT corridor
Timeframe Short Term (6-10 Years)
Estimated Cost $1,760,000,000.00
METRO - Westheimer Signature Bus Service
down-arrow
Project ID 900
Agency Name METRO
Project Title Westheimer Signature Bus Service
Facility/Street/Highway VA
Limits Downtown to SH 6 (West Oaks Mall)
Description Rolling Stop for high speed overlay service
Timeframe Medium Term (6-10 Years)
Estimated Cost $30,000,000.00
METRO - Willowbrook TC
down-arrow
Project ID 901
Agency Name METRO
Project Title Willowbrook TC
Facility/Street/Highway SH 249
Limits @ FM 1960
Description Construct new transit center
Timeframe Medium Term (6-10 Years)
Estimated Cost $35,000,000.00
METRO - BRT Service to IAH
down-arrow
Project ID 902
Agency Name METRO
Project Title BRT Service to IAH
Facility/Street/Highway VA
Limits Downtown to IAH
Description New BRT corridor
Timeframe Long Term (More Than 10 Years)
Estimated Cost $358,000,000.00
METRO - Downtown Transit Corridors
down-arrow
Project ID 903
Agency Name METRO
Project Title Downtown Transit Corridors
Facility/Street/Highway VA
Limits Downtown Bus Routes
Description Redesign and construct bus lanes to improve signage and pavement markings , signal timing and operations, bus stop design and spacing, and other passenger improvements
Timeframe Short Term (0-5 years)
Estimated Cost $35,000,000.00
METRO - Fairfield Park & Ride
down-arrow
Project ID 904
Agency Name METRO
Project Title Fairfield Park & Ride
Facility/Street/Highway US 290
Limits @ US 290 & SH 99
Description Construct new park & ride
Timeframe Long Term (More Than 10 Years)
Estimated Cost $35,000,000.00
METRO - Future BOOST Corridors
down-arrow
Project ID 905
Agency Name METRO
Project Title Future BOOST Corridors
Facility/Street/Highway VA - within METRO service area
Limits
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Long Term (More Than 10 Years)
Estimated Cost $103,000,000.00
METRO - Hempstead Rd. TC
down-arrow
Project ID 906
Agency Name METRO
Project Title Hempstead Rd. TC
Facility/Street/Highway Hempstead Rd.
Limits @ North Post Oak Rd.
Description Construct new transit center
Timeframe Long Term (More Than 10 Years)
Estimated Cost $24,000,000.00
METRO - Kingwood Dr. P&R
down-arrow
Project ID 907
Agency Name METRO
Project Title Kingwood Dr. P&R
Facility/Street/Highway US 59 N
Limits @ Kingwood Dr.
Description Construct new park & ride
Timeframe Long Term (More Than 10 Years)
Estimated Cost $63,000,000.00
METRO - LRT Extension to Hobby Airport
down-arrow
Project ID 908
Agency Name METRO
Project Title LRT Extension to Hobby Airport
Facility/Street/Highway VA
Limits MLK/Griggs Rd to Hobby Airport
Description Extension of Green/Purple to airport
Timeframe Long Term (More Than 10 Years)
Estimated Cost $1,500,000,000.00
METRO - Maxey Rd. P&R
down-arrow
Project ID 909
Agency Name METRO
Project Title Maxey Rd. P&R
Facility/Street/Highway Maxey Rd.
Limits @ Maxey Rd.
Description Construct new park & ride
Timeframe Long Term (More Than 10 Years)
Estimated Cost $41,000,000.00
METRO - Memorial City TC
down-arrow
Project ID 910
Agency Name METRO
Project Title Memorial City TC
Facility/Street/Highway I 10 W
Limits @ Gessner Rd.
Description New TC in vicinity of Gessner and I-10 W
Timeframe Long Term (More Than 10 Years)
Estimated Cost $35,000,000.00
METRO - Park PLace Multimodal Center
down-arrow
Project ID 911
Agency Name METRO
Project Title Park PLace Multimodal Center
Facility/Street/Highway Green Line
Limits @ Park Place Blvd
Description Construct new multimodal center
Timeframe Long Term (More Than 10 Years)
Estimated Cost $66,000,000.00
METRO - Red Line Extension
down-arrow
Project ID 912
Agency Name METRO
Project Title Red Line Extension
Facility/Street/Highway VA
Limits Northline TC to N Shepherd P&R
Description Extension of Red Line
Timeframe Long Term (More Than 10 Years)
Estimated Cost $1,097,000,000.00
METRO - Red Line Extension
down-arrow
Project ID 913
Agency Name METRO
Project Title Red Line Extension
Facility/Street/Highway VA
Limits Fannin South TC to Missouri City
Description Red Line extension (planning phase)
Timeframe Long Term (More Than 10 Years)
Estimated Cost $18,000,000.00
METRO - Southwest Corridor
down-arrow
Project ID 914
Agency Name METRO
Project Title Southwest Corridor
Facility/Street/Highway US 90A Corridor
Limits TMC to Missouri City
Description Develop new transit corridor
Timeframe Long Term (More Than 10 Years)
Estimated Cost $365,000,000.00
METRO - Springwoods P&R
down-arrow
Project ID 915
Agency Name METRO
Project Title Springwoods P&R
Facility/Street/Highway I 45 N
Limits @ Springwoods Village Pkwy
Description Construct new park & ride
Timeframe Long Term (More Than 10 Years)
Estimated Cost $83,000,000.00
METRO - State of Good Repair
down-arrow
Project ID 916
Agency Name METRO
Project Title State of Good Repair
Facility/Street/Highway VA - within METRO service area
Limits
Description Upgrade, rehab and retrofit facilities and infrastructure as needed to maintain SOGR
Timeframe Long Term (More Than 10 Years)
Estimated Cost $1,000,000,000.00
METRO - TMC Transit Improvement and Service Integration
down-arrow
Project ID 917
Agency Name METRO
Project Title TMC Transit Improvement and Service Integration
Facility/Street/Highway
Limits @ TMC
Description Improve and better integrate local bus, commuter bus and LRT service within TMC
Timeframe Long Term (More Than 10 Years)
Estimated Cost $30,000,000.00
METRO - West Houston BRT Corridor
down-arrow
Project ID 918
Agency Name METRO
Project Title West Houston BRT Corridor
Facility/Street/Highway BW 8
Limits Missouri City P&R to W Little York P&R
Description New BRT corridor
Timeframe Long Term (More Than 10 Years)
Estimated Cost $1,700,000,000.00
METRO - Other BOOST Corridors (6 corridors)
down-arrow
Project ID 919
Agency Name METRO
Project Title Other BOOST Corridors (6 corridors)
Facility/Street/Highway VA
Limits VA
Description Optimize bus operations using a toolbox of improvements - traffic sign al prioritization, real-time travel information, shelters, level boarding, etc.
Timeframe Long Term (More than 10 Years)
Estimated Cost $150,000,000.00
METRO - Future Signature Service
down-arrow
Project ID 920
Agency Name METRO
Project Title Future Signature Service
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Medium Term (6-10 Years)
Estimated Cost $75,000,000.00
METRO - Future Signature Service
down-arrow
Project ID 921
Agency Name METRO
Project Title Future Signature Service
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Long Term (More Than 10 Years)
Estimated Cost $75,000,000.00
METRO - Regional Vanpool
down-arrow
Project ID 922
Agency Name METRO
Project Title Regional Vanpool
Facility/Street/Highway VA
Limits
Description Place Holder
Timeframe Medium Term (6-10 Years)
Estimated Cost $0.00
METRO - Regional Vanpool
down-arrow
Project ID 923
Agency Name METRO
Project Title Regional Vanpool
Facility/Street/Highway VA
Limits
Description Place Holder
Timeframe Long Term (More Than 10 Years)
Estimated Cost $0.00
METRO - Replacement Buses
down-arrow
Project ID 924
Agency Name METRO
Project Title Replacement Buses
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Medium Term (6-10 Years)
Estimated Cost $75,000,000.00
METRO - Replacement Buses
down-arrow
Project ID 925
Agency Name METRO
Project Title Replacement Buses
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Long Term (More Than 10 Years)
Estimated Cost $75,000,000.00
METRO - METROLift Vans
down-arrow
Project ID 926
Agency Name METRO
Project Title METROLift Vans
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Medium Term (6-10 Years)
Estimated Cost $50,000,000.00
METRO - METROLift Vans
down-arrow
Project ID 927
Agency Name METRO
Project Title METROLift Vans
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Long Term (More Than 10 Years)
Estimated Cost $50,000,000.00
METRO - ADA Support
down-arrow
Project ID 928
Agency Name METRO
Project Title ADA Support
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Medium Term (6-10 Years)
Estimated Cost $30,000,000.00
METRO - ADA Support
down-arrow
Project ID 929
Agency Name METRO
Project Title ADA Support
Facility/Street/Highway VA - within METRO service area
Limits
Description Place Holder
Timeframe Long Term (More Than 10 Years)
Estimated Cost $30,000,000.00
North Houston District - Imperial Valley Walking & Biking Connections (Revised)
down-arrow
Project ID 930
Agency Name North Houston District
Project Title Imperial Valley Walking & Biking Connections (Revised)
Facility/Street/Highway Imperial Valley Drive; Regional Park Drive; Wayforest
Limits Imperial Valley Drive from 50' north of Rankin Road to Greens Road; Regional Park Drive from Imperial Valley Drive to Chisholm Trail; Wayforest Dr. from Regional Park Dr. to Seminar Dr.
Description Provide safe, connected sidewalks and trails that connect schools, neighborhoods, businesses, community facilities to Tom Wussow Park, new Central Park and Greens Bayou Trail. This includes 5' and 6' wide sidewalks and 10' wide multi-use sidepaths, new bus pads and improved intersections with high-visibility crosswalks, pedestrian refuges, and improved pedestrian signal timing. Improved pedestrian and bicycle crossings on Imperial Valley Dr. include Rectangular Rapid Flashing Beacons (RRFB) and upgraded signage and striping to comport with City's new mid-block crossing standards.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,246,000.00
North Houston District - I-45 Trail Connector
down-arrow
Project ID 931
Agency Name North Houston District
Project Title I-45 Trail Connector
Facility/Street/Highway Greens Bayou
Limits North Houston Bike Park to Knobcrest Drive
Description Construct an off-street trail on both sides of Greens Bayou across I-45 creating safe, regional connections between parks, jobs, community facilities, and neighborhoods.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,276,500.00
North Houston District - Jack Drake Park to West Hardy Trail Connector
down-arrow
Project ID 932
Agency Name North Houston District
Project Title Jack Drake Park to West Hardy Trail Connector
Facility/Street/Highway Greens Bayou
Limits Jack Drake Park to W. Hardy Rd
Description Develop an off-street trail on the south side of Greens Bayou connecting Jack Drake Park to pedestrian and bicycle connections at W. Hardy Rd along Greens Bayou to increase safe, accessible multimodal connections for the community.
Timeframe Short Term (0-5 Years)
Estimated Cost $390,000.00
North Houston District - West Road Safety & Access Improvements
down-arrow
Project ID 933
Agency Name North Houston District
Project Title West Road Safety & Access Improvements
Facility/Street/Highway West Road
Limits I-45 Frontage Road to Airline Dr
Description Reconstruct the corridor as a 4-lane divided corridor improve current poor roadway conditions and pavement quality, fill gaps in sidewalk infrastructure and bring existing sidewalks in poor condition up to ADA standards, enhance crosswalks and intersections for multimodal safety, and improve bus stops with bus pads and shelters. Will provide improved access to Aldine High School and existing businesses while also creating opportunities for placemaking for the neighborhoods to the east of Airline Drive.
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,650,000.00
North Houston District - Rankin Road Corridor Improvements
down-arrow
Project ID 934
Agency Name North Houston District
Project Title Rankin Road Corridor Improvements
Facility/Street/Highway Rankin Road
Limits I-45 to West Hardy Road
Description Reconstruct Rankin Road to be a 4-lane curb and gutter facility with drainage improvements and new sidewalks facilitating safe connections for people walking or accessing transit from surrounding destinations and neighborhoods. Improvements will improve accessibility for freight to surrounding industrial uses and accessibility.
Timeframe Long Term (More than 10 Years)
Estimated Cost $21,795,000.00
PORT OF HOUSTON AUTHORITY - Second Rail Track
down-arrow
Project ID 935
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Second Rail Track
Facility/Street/Highway PORT TERMINAL RAILROAD ASSN (PTRA) TRACK
Limits STRANG YARD to RED BLUFF
Description CONSTRUCT 2ND RAIL TRACK
Timeframe Medium Term (6-10 Years)
Estimated Cost $97,100,000.00
PORT OF HOUSTON AUTHORITY - Broadway Expansion
down-arrow
Project ID 936
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Broadway Expansion
Facility/Street/Highway BROADWAY ST
Limits BARBOURS CUT BLVD to L STREET N
Description WIDEN TO 4-LANE ROAD
Timeframe Short Term (0-5 Years)
Estimated Cost $2,632,382.00
PORT OF HOUSTON AUTHORITY - Bayport Intermodal Yard
down-arrow
Project ID 937
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Bayport Intermodal Yard
Facility/Street/Highway RAILROAD TRACK
Limits AT BAYPORT
Description CONSTRUCT INTERMODAL RAIL YARD INCL 6 STORAGE TRACKS, 3 WORKING TRACKS, AND 1 CONTAINER TRACK
Timeframe Medium Term (6-10 Years)
Estimated Cost $61,000,000.00
PORT OF HOUSTON AUTHORITY - Double Track Rail
down-arrow
Project ID 938
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Double Track Rail
Facility/Street/Highway PORT TERMINAL RAILROAD ASSN (PTRA) TRACK
Limits MAINLINE TO INTERMODAL YARD
Description CONSTRUCT DOUBLE TRACK RAIL LINES AND RUN-AROUND TRACK FROM MAINLINE TO THE BAYPORT TERMINAL INTERMODAL YARD
Timeframe Medium Term (6-10 Years)
Estimated Cost $29,600,000.00
PORT OF HOUSTON AUTHORITY - BPT Intermodal Yard
down-arrow
Project ID 939
Agency Name PORT OF HOUSTON AUTHORITY
Project Title BPT Intermodal Yard
Facility/Street/Highway RAILROAD TRACK
Limits AT BAYPORT
Description CONSTRUCT INTERMODAL RAIL YARD INCL 6 STORAGE TRACKS, 3 WORKING TRACKS, 2 CONTAINER TRACKS AND 1 RUNAROUND TRACK
Timeframe Long Term (More than 10 Years)
Estimated Cost $44,398,000.00
PORT OF HOUSTON AUTHORITY - Grade Separation Expansion over Rail
down-arrow
Project ID 940
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Grade Separation Expansion over Rail
Facility/Street/Highway SPENCER HWY
Limits AT MAINLINE DOUBLE-RAILTRACK TO NE DOUBLE RAILTRACK
Description CONSTRUCT GRADE SEPARATION OVER MAINLINE DOUBLE-RAIL TRACK
Timeframe Short Term (0-5 Years)
Estimated Cost $16,300,000.00
PORT OF HOUSTON AUTHORITY - Bayport Container Terminal Overpass.
down-arrow
Project ID 941
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Bayport Container Terminal Overpass.
Facility/Street/Highway PORT RD
Limits FM 146 TO CRUISE ST
Description CONSTRUCTION OF RAILROAD OVERPASS ON PORT ROAD LEADING TO THE BAYPORT CONTAINER TERMINAL.
Timeframe Medium Term (6-10 Years)
Estimated Cost $18,996,668.00
Regional Goods Movement Questionnaire View Questionnaire
PORT OF HOUSTON AUTHORITY - Port Houston Barbours Cut Terminal Container Yard 6 Upgrade
down-arrow
Project ID 942
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Port Houston Barbours Cut Terminal Container Yard 6 Upgrade
Facility/Street/Highway BARBOURS CUT CONTAINER YARD
Limits AT BARBOURS CUT
Description RECONSTRUCT CONTAINER YARD 6 AT BAYPORT TO INCLUDE STRENGTHEN INFRASTRUCTURE.
Timeframe Short Term (0-5 Years)
Estimated Cost $42,250,000.00
Regional Goods Movement Questionnaire View Questionnaire
PORT OF HOUSTON AUTHORITY - Port Houston Barbours Cut Terminal Container Yard 7 Upgrade
down-arrow
Project ID 943
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Port Houston Barbours Cut Terminal Container Yard 7 Upgrade
Facility/Street/Highway BARBOURS CUT CONTAINER YARD
Limits AT BARBOURS CUT
Description RECONSTRUCT CONTAINER YARD 7 AT BAYPORT TO INCLUDE STRENGTHEN INFRASTRUCTURE.
Timeframe Short Term (0-5 Years)
Estimated Cost $53,300,000.00
Regional Goods Movement Questionnaire View Questionnaire
PORT OF HOUSTON AUTHORITY - Barbours Cut Container Terminal Wharf Rehabilitation
down-arrow
Project ID 944
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Barbours Cut Container Terminal Wharf Rehabilitation
Facility/Street/Highway BARBOURS CUT WHARF
Limits AT BARBOURS CUT
Description RECONSTRUCT 1,337 LF OF WHARF AT BAYPORT TO INCLUDE STRENGTHEN INFRASTRUCTURE.
Timeframe Short Term (0-5 Years)
Estimated Cost $69,342,000.00
Regional Goods Movement Questionnaire View Questionnaire
PORT OF HOUSTON AUTHORITY - Keep the Supply Chain Moving with the Bayport Terminal Yard Expansion
down-arrow
Project ID 945
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Keep the Supply Chain Moving with the Bayport Terminal Yard Expansion
Facility/Street/Highway BAYPORT CONTAINER YARD
Limits AT BAYPORT
Description CONSTRUCT 46 ACRES OF CONTAINER YARD AT BAYPORT TERMINAL.
Timeframe Short Term (0-5 Years)
Estimated Cost $95,018,093.00
Regional Goods Movement Questionnaire View Questionnaire
PORT OF HOUSTON AUTHORITY/other - Freight Shuttle
down-arrow
Project ID 946
Agency Name PORT OF HOUSTON AUTHORITY/other
Project Title Freight Shuttle
Facility/Street/Highway Off-network
Limits Harris County to Chambers County
Description Build an alternative freight movement system connecting Port Houston's container terminals and distribution and warehousing in Chambers County
Timeframe Medium Term (6-10 Years)
Estimated Cost $700,000,000.00
PORT OF HOUSTON AUTHORITY/HCTRA - BW-8 connectivity
down-arrow
Project ID 947
Agency Name PORT OF HOUSTON AUTHORITY/HCTRA
Project Title BW-8 connectivity
Facility/Street/Highway Intersection of SH-225 and Jacintoport Blvd
Limits Jacintoport Blvd and BW-8 intersection
Description Design and construct connectivity between PH BW-8 property and BW-8
Timeframe Medium Term (6-10 Years)
Estimated Cost $0.00
PORT OF HOUSTON AUTHORITY/Harris County - Old SH-146 widening
down-arrow
Project ID 948
Agency Name PORT OF HOUSTON AUTHORITY/Harris County
Project Title Old SH-146 widening
Facility/Street/Highway Old SH-146
Limits Red Bluff Road and Port Road
Description WIDEN TO 4-LANE ROAD
Timeframe Short Term (0-5 Years)
Estimated Cost $0.00
PORT OF HOUSTON AUTHORITY/TxDOT - SH-225 PEL Projects (BCT connectivity)
down-arrow
Project ID 949
Agency Name PORT OF HOUSTON AUTHORITY/TxDOT
Project Title SH-225 PEL Projects (BCT connectivity)
Facility/Street/Highway Barbours Cut Blvd and SH-146 connectivity
Limits Barbours Cut Blvd and SH-146
Description Design and construct improved connectivity between SH-146, SH-225 and Barbours Cut Blvd
Timeframe Short Term (0-5 Years)
Estimated Cost $0.00
PORT OF HOUSTON AUTHORITY/TxDOT - 610 Bridge replacement and associated connectivity
down-arrow
Project ID 950
Agency Name PORT OF HOUSTON AUTHORITY/TxDOT
Project Title 610 Bridge replacement and associated connectivity
Facility/Street/Highway 610 East Ship Channel Bridge
Limits I-10 to the north and I-45 to the south and all associated connectivity inbetween
Description Design and construct a taller and wider replacement bridge over the HSC
Timeframe Medium Term (6-10 Years)
Estimated Cost $2,400,000,000.00
PORT OF HOUSTON AUTHORITY/Harris County - Barbours Cut Blvd widening
down-arrow
Project ID 951
Agency Name PORT OF HOUSTON AUTHORITY/Harris County
Project Title Barbours Cut Blvd widening
Facility/Street/Highway Barbours Cut Blvd
Limits SH-146 and termination at Barbours Cut Terminal
Description Widen to 6-lane road and coordinated with Barbours Cut Blvd connectivity to SH-146
Timeframe Short Term (0-5 Years)
Estimated Cost $0.00
PORT OF HOUSTON AUTHORITY/Harris County - Sheldon Road widening
down-arrow
Project ID 952
Agency Name PORT OF HOUSTON AUTHORITY/Harris County
Project Title Sheldon Road widening
Facility/Street/Highway Sheldon Road
Limits Market Street to Jacintoport Blvd
Description Widen and rehab Sheldon Road
Timeframe Short Term (0-5 Years)
Estimated Cost $14,000,000.00
PORT OF HOUSTON AUTHORITY/Harris County - Jacintoport Blvd widening and connection to Penn City Road (from Peninsula Blvd to Penn City)
down-arrow
Project ID 953
Agency Name PORT OF HOUSTON AUTHORITY/Harris County
Project Title Jacintoport Blvd widening and connection to Penn City Road (from Peninsula Blvd to Penn City)
Facility/Street/Highway Jacintoport Blvd
Limits Peninsula Blvd and Penn City Road
Description Widen and rehab Jacontoport Blvd
Timeframe Medium Term (6-10 Years)
Estimated Cost $0.00
PORT OF HOUSTON AUTHORITY/Harris County - Penn City Road widening
down-arrow
Project ID 954
Agency Name PORT OF HOUSTON AUTHORITY/Harris County
Project Title Penn City Road widening
Facility/Street/Highway Penn City Road
Limits Jacintoport Blvd and I-10 frontage road
Description Widen and rehab Penn City Road
Timeframe Medium Term (6-10 Years)
Estimated Cost $0.00
PORT OF HOUSTON AUTHORITY/other - Alternative fuels fueling stations
down-arrow
Project ID 955
Agency Name PORT OF HOUSTON AUTHORITY/other
Project Title Alternative fuels fueling stations
Facility/Street/Highway Varies
Limits Varies
Description Install eight alternative fuels fueing stations.
Timeframe Medium Term (6-10 Years)
Estimated Cost $70,000,000.00
PORT OF HOUSTON AUTHORITY - u-shaped property connectivity
down-arrow
Project ID 956
Agency Name PORT OF HOUSTON AUTHORITY
Project Title u-shaped property connectivity
Facility/Street/Highway Port Road Connectivity to PH u-shaped property
Limits Port Road
Description Build connectivity between PH's u-shaped property and Port Road at the NW corner of Port Road and SH-146
Timeframe Short Term (0-5 Years)
Estimated Cost $0.00
PORT OF HOUSTON AUTHORITY - Terminal 3 connectivity
down-arrow
Project ID 957
Agency Name PORT OF HOUSTON AUTHORITY
Project Title Terminal 3 connectivity
Facility/Street/Highway Port Houston Temrinal 3.
Limits Unknown
Description Construct the connecting roads to Port Houston's Terminal 3
Timeframe Medium Term (6-10 Years)
Estimated Cost $0.00
The Woodlands Township - Commuter Bus Purchase
down-arrow
Project ID 958
Agency Name The Woodlands Township
Project Title Commuter Bus Purchase
Facility/Street/Highway N/A
Limits N/A
Description Purchase 32 commuter bus vehicles.
Timeframe Medium Term (6-10 Years)
Estimated Cost $31,280,000.00
The Woodlands Township - Transit Maintenance Facility
down-arrow
Project ID 959
Agency Name The Woodlands Township
Project Title Transit Maintenance Facility
Facility/Street/Highway N/A
Limits N/A
Description Design and construct new transit maintenance facility
Timeframe Short Term (0-5 Years)
Estimated Cost $10,000,000.00
The Woodlands Township - Safe School Access Shared Use Paths
down-arrow
Project ID 960
Agency Name The Woodlands Township
Project Title Safe School Access Shared Use Paths
Facility/Street/Highway Kuykendahl Road Kuykendahl Road Kuykendahl Road Panther Creek Drive Research Forest Dr
Limits HEB (3601 FM 1488) to FM 1488 Lake Woodlands Drive to Research Forest Drive Creekside Green Drive to Timarron Drive McCullough JHS (East of Coralberry Road) to Spiral Vine Circle Woodlands High School (Cats Cradle Drive) to Bear Branch Sports Fields (East of East Trillium Circle)
Description Fill bicycle/pedestrian gaps via 12-FT wide concrete paths
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
The Woodlands Township - Harpers Landing / SH 242 Connection
down-arrow
Project ID 961
Agency Name The Woodlands Township
Project Title Harpers Landing / SH 242 Connection
Facility/Street/Highway SH 242 Trade Center Parkway
Limits FM 1488 to Trade Center Pkwy SH 242 to Harpers Landing
Description Construct 5.5 mile 12-FT wide shared use path to include intersection safety improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $8,350,000.00
TxDOT Beaumont District - IH-10 Ramp Relocations
down-arrow
Project ID 962
Agency Name TxDOT Beaumont District
Project Title IH-10 Ramp Relocations
Facility/Street/Highway IH-10
Limits From SH 146 to FM 565
Description Relocate entrance / exit ramps
Timeframe Short Term (0-5 Years)
Estimated Cost $35,000,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - FM 1405 Widening
down-arrow
Project ID 963
Agency Name TxDOT Beaumont District
Project Title FM 1405 Widening
Facility/Street/Highway FM 1405
Limits From SH 99 south to FM 2354
Description Widen from 2 to 4 lanes with center turn lane
Timeframe Short Term (0-5 Years)
Estimated Cost $16,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - FM 1405 Widening
down-arrow
Project ID 964
Agency Name TxDOT Beaumont District
Project Title FM 1405 Widening
Facility/Street/Highway FM 1405
Limits From FM 565 south to SH 99
Description Widen from 2 to 4 lanes with center turn lane
Timeframe Short Term (0-5 Years)
Estimated Cost $16,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - FM 565 Widening
down-arrow
Project ID 965
Agency Name TxDOT Beaumont District
Project Title FM 565 Widening
Facility/Street/Highway FM 565
Limits From FM 1409 to FM 3180
Description Add center turn lane and 10 foot shoulders
Timeframe Short Term (0-5 Years)
Estimated Cost $15,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Beaumont District - SH 105 Widening
down-arrow
Project ID 966
Agency Name TxDOT Beaumont District
Project Title SH 105 Widening
Facility/Street/Highway SH 105
Limits From Montgomery County Line to BS 105T
Description Widen from 2 to 4 lanes divided
Timeframe Short Term (0-5 Years)
Estimated Cost $20,000,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - FM 2025 Widening
down-arrow
Project ID 967
Agency Name TxDOT Beaumont District
Project Title FM 2025 Widening
Facility/Street/Highway FM 2025
Limits From US 59 to SL 573
Description Widen roadway and bridge to include turn lanes.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Beaumont District - FM 1960 Widening
down-arrow
Project ID 968
Agency Name TxDOT Beaumont District
Project Title FM 1960 Widening
Facility/Street/Highway FM 1960
Limits From SH 321 to SH 99
Description Widen from 2 to 4 lanes
Timeframe Short Term (0-5 Years)
Estimated Cost $27,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - SH 146 TURN LANES
down-arrow
Project ID 969
Agency Name TxDOT Beaumont District
Project Title SH 146 TURN LANES
Facility/Street/Highway SH 146
Limits AT IH10
Description DUAL TURN LANES FOR NB
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - SH 146 Widening
down-arrow
Project ID 970
Agency Name TxDOT Beaumont District
Project Title SH 146 Widening
Facility/Street/Highway SH 146
Limits From IH-10 south to Cedar Bayou
Description Widen from 4 to 6 lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $100,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Major Projects Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - US 90 - Klemp Rd Interchange
down-arrow
Project ID 971
Agency Name TxDOT Beaumont District
Project Title US 90 - Klemp Rd Interchange
Facility/Street/Highway US 90
Limits At Klemp Rd
Description Construct new interchange on US 90 with RR overpass on Klemp Rd
Timeframe Medium Term (6-10 Years)
Estimated Cost $70,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Beaumont District - FM 787 Trinity River Bridge
down-arrow
Project ID 972
Agency Name TxDOT Beaumont District
Project Title FM 787 Trinity River Bridge
Facility/Street/Highway FM 787
Limits At the Trinity River
Description Realign crossing of FM 787 at the Trinity River to address river migration threat.
Timeframe Medium Term (6-10 Years)
Estimated Cost $27,000,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Beaumont District - Dayton Relief Route
down-arrow
Project ID 973
Agency Name TxDOT Beaumont District
Project Title Dayton Relief Route
Facility/Street/Highway US 90
Limits TBD
Description Construct relief route around Dayton
Timeframe Medium Term (6-10 Years)
Estimated Cost $75,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - 36A Planning Studies
down-arrow
Project ID 974
Agency Name TxDOT Houston District
Project Title 36A Planning Studies
Facility/Street/Highway 36A
Limits From South of Needville to IH 10 W
Description Preliminary engineering study in preparation for a possible DEIS (CONSTRUCT FOUR-LANE DIVIDED ON NEW LOCATION)
Timeframe Medium Term (6-10 Years)
Estimated Cost $8,194,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - 36A Planning Studies
down-arrow
Project ID 975
Agency Name TxDOT Houston District
Project Title 36A Planning Studies
Facility/Street/Highway 36A
Limits From IH 10 W to US 290 /SH 6 near Hempstead
Description Preliminary engineering study in preparation for a possible DEIS
Timeframe Medium Term (6-10 Years)
Estimated Cost $7,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 1093 Pedestrian and Bike Improvements
down-arrow
Project ID 976
Agency Name TxDOT Houston District
Project Title FM 1093 Pedestrian and Bike Improvements
Facility/Street/Highway FM 1093
Limits From FM 1464 (S Barker Cypress Rd) to SH 6
Description The project includes a 5- to 6- foot wide sidewalks NB and a 10ft shared use path SB, high visibility crossing striping, ADA ramps, pavement markings, median refuge and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
TxDOT Houston District - FM 1093 Widening
down-arrow
Project ID 977
Agency Name TxDOT Houston District
Project Title FM 1093 Widening
Facility/Street/Highway FM 1093
Limits From FM 1489 to FM 359 in Fulshear
Description Reconstruct and widen existing roadway from 2 to 4 lanes divided. This configuration would match the section of FM 1093 in Fulshear. The space between the divided facilities would create an opportunity for future mainlanes (Westpark Tollway).
Timeframe Medium Term (6-10 Years)
Estimated Cost $110,680,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1097 Drainage Improvements
down-arrow
Project ID 978
Agency Name TxDOT Houston District
Project Title FM 1097 Drainage Improvements
Facility/Street/Highway FM 1097
Limits At Akins Creek
Description Construct drainage improvements including culvert replacements and limited channel work.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,800,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - FM 1097 at IH 45 N Construct New Interchange
down-arrow
Project ID 979
Agency Name TxDOT Houston District
Project Title FM 1097 at IH 45 N Construct New Interchange
Facility/Street/Highway FM 1097
Limits At IH 45 N
Description This project proposes interchange improvements based on the results of the feasibility study.
Timeframe Long Term (More than 10 Years)
Estimated Cost $25,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1128 Widening
down-arrow
Project ID 980
Agency Name TxDOT Houston District
Project Title FM 1128 Widening
Facility/Street/Highway FM 1128
Limits From FM 518 to Bailey Ave
Description Widen from a 2-lane to a 4-lane divided roadway
Timeframe Long Term (More than 10 Years)
Estimated Cost $23,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1314 Widening
down-arrow
Project ID 981
Agency Name TxDOT Houston District
Project Title FM 1314 Widening
Facility/Street/Highway FM 1314
Limits From SH 105 to SH 242
Description Widen from a 2-lane to a 4-lane divided roadway
Timeframe Medium Term (6-10 Years)
Estimated Cost $140,600,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1458 Bike Tourism Trail
down-arrow
Project ID 982
Agency Name TxDOT Houston District
Project Title FM 1458 Bike Tourism Trail
Facility/Street/Highway FM 1458
Limits From 359 to Park Rd 38
Description The project includes a 8- to 10- foot shoulders, high visibility crossing striping, ADA ramps, pavement markings, resting area pads and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $5,400,000.00
Transit Questionnaire View Questionnaire
TxDOT Houston District - FM 1458 Reconstruct/Realign and Widen
down-arrow
Project ID 983
Agency Name TxDOT Houston District
Project Title FM 1458 Reconstruct/Realign and Widen
Facility/Street/Highway FM 1458
Limits From FM 359 to Austin C/L
Description Widen from 2-lane to 4-lanes and implement access management treatments including turn lanes, intersection improvements, and realigning existing roadway curves to improve safety and mobility.
Timeframe Long Term (More than 10 Years)
Estimated Cost $70,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1485 Widening
down-arrow
Project ID 984
Agency Name TxDOT Houston District
Project Title FM 1485 Widening
Facility/Street/Highway FM 1485
Limits From SH 242 to Kidd Cemetery Road
Description Widen from 2-lane to 4-lanes and implement access management treatments including raised medians, realignment of curves, and bike/pedestrian accommodations.
Timeframe Medium Term (6-10 Years)
Estimated Cost $103,600,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Magnolia Bypass (currently given an FM 1488 control number)
down-arrow
Project ID 985
Agency Name TxDOT Houston District
Project Title Magnolia Bypass (currently given an FM 1488 control number)
Facility/Street/Highway FM 1488
Limits From Business FM 1488-P to SH 249
Description Construct 4-Lane on New Location Roadway (Magnolia Bypass)
Timeframe Short Term (0-5 Years)
Estimated Cost $70,650,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1488 Widening and Realignment
down-arrow
Project ID 986
Agency Name TxDOT Houston District
Project Title FM 1488 Widening and Realignment
Facility/Street/Highway FM 1488
Limits From BU 290 to FM 1098
Description Widen from 2-lane to 4-lanes and implement access management treatments including a raised median, realignment of curve, and bike/ped facilities.
Timeframe Medium Term (6-10 Years)
Estimated Cost $44,650,000.00
High Growth Area Needs Questionnaire View Questionnaire
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1488 Widening/Other Improvements
down-arrow
Project ID 987
Agency Name TxDOT Houston District
Project Title FM 1488 Widening/Other Improvements
Facility/Street/Highway FM 1488
Limits From FM 1098 to Harris C/L
Description Widen from 2-lane to 4-lanes and implement access management treatments including a raised median, realignment of curve, and bike/ped facilities.
Timeframe Medium Term (6-10 Years)
Estimated Cost $71,640,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1488 Widening/Other Improvements
down-arrow
Project ID 988
Agency Name TxDOT Houston District
Project Title FM 1488 Widening/Other Improvements
Facility/Street/Highway FM 1488
Limits From Waller C/L West to Waller C/L East
Description Widen from 2-lane to 4-lanes and implement access management treatments including a raised median, realignment of curve, and bike/ped facilities.
Timeframe Medium Term (6-10 Years)
Estimated Cost $8,950,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1488 Widening/Other Improvements
down-arrow
Project ID 989
Agency Name TxDOT Houston District
Project Title FM 1488 Widening/Other Improvements
Facility/Street/Highway FM 1488
Limits From Harris C/L to Joseph Road
Description Widen from 2-lane to 4-lanes and implement access management treatments including a raised median, realignment of curve, and bike/ped facilities.
Timeframe Medium Term (6-10 Years)
Estimated Cost $140,350,000.00
High Growth Area Needs Questionnaire View Questionnaire
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1488 Widening and Access Management
down-arrow
Project ID 990
Agency Name TxDOT Houston District
Project Title FM 1488 Widening and Access Management
Facility/Street/Highway FM 1488
Limits From FM 2978 to IH 45 N
Description Widen from 4 to 6 Lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $67,800,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 1489 Widening
down-arrow
Project ID 991
Agency Name TxDOT Houston District
Project Title FM 1489 Widening
Facility/Street/Highway FM 1489
Limits From south of IH 10 W to FM 359
Description Widen the existing FM 1489 from 2 to 4 lanes and extend it north on new location to FM 359 (Durkin Road) and includes intersection improvements at FM 359.
Timeframe Medium Term (6-10 Years)
Estimated Cost $20,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1489 Widening
down-arrow
Project ID 992
Agency Name TxDOT Houston District
Project Title FM 1489 Widening
Facility/Street/Highway FM 1489
Limits From SH 36 to IH 10 W
Description Reconstruct and widen from 2 to 4 lanes.
Timeframe Long Term (More than 10 Years)
Estimated Cost $225,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 1489 Widening
down-arrow
Project ID 993
Agency Name TxDOT Houston District
Project Title FM 1489 Widening
Facility/Street/Highway FM 1489
Limits From SH 36 to FM 1093
Description Reconstruct and widen from 2 to 4 lanes.
Timeframe Long Term (More than 10 Years)
Estimated Cost $75,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 149
down-arrow
Project ID 994
Agency Name TxDOT Houston District
Project Title FM 149
Facility/Street/Highway FM 149
Limits From FM 1791 to Grimes County Line
Description Add 5 -foot shoulders, 1.5 inch mill and overlay.
Timeframe Short Term (0-5 Years)
Estimated Cost $9,500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - FM 149 Extension to SH 249 on new location
down-arrow
Project ID 995
Agency Name TxDOT Houston District
Project Title FM 149 Extension to SH 249 on new location
Facility/Street/Highway FM 149
Limits From SH 249 to E of Stillwater Blvd
Description Construct new location four-lane roadway with raised medians and bridge over BNSF RR / Jackson Road.
Timeframe Medium Term (6-10 Years)
Estimated Cost $75,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 1495 Widening
down-arrow
Project ID 996
Agency Name TxDOT Houston District
Project Title FM 1495 Widening
Facility/Street/Highway FM 1495
Limits From FM 523 to North of Brazos River Bridge
Description Widen from 2-lane to 4 -lane roadway
Timeframe Medium Term (6-10 Years)
Estimated Cost $17,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 1960 Access Management Improvements (Phase 1)
down-arrow
Project ID 997
Agency Name TxDOT Houston District
Project Title FM 1960 Access Management Improvements (Phase 1)
Facility/Street/Highway FM 1960
Limits From IH 45 N to BF 1960 (East of Humble)
Description Phase 1 implementation of short-term recommendations (remainder of raised medians not constructed by 1685-02-056, sidewalks, ITS, etc.)
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - FM 1960 Access Management Improvements (Phase 2)
down-arrow
Project ID 998
Agency Name TxDOT Houston District
Project Title FM 1960 Access Management Improvements (Phase 2)
Facility/Street/Highway FM 1960
Limits From IH 45 N to IH 69 N
Description Phase 2 implementation of short-term recommendations
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - FM 1960 Grade Separation at Jones Rd Intersection
down-arrow
Project ID 999
Agency Name TxDOT Houston District
Project Title FM 1960 Grade Separation at Jones Rd Intersection
Facility/Street/Highway FM 1960
Limits AT JONES RD
Description CONSTRUCT GRADE SEPARATION
Timeframe Long Term (More than 10 Years)
Estimated Cost $44,400,000.00
TxDOT Houston District - FM 2004 Bridge Replacement
down-arrow
Project ID 1000
Agency Name TxDOT Houston District
Project Title FM 2004 Bridge Replacement
Facility/Street/Highway FM 2004
Limits At Chocolate Bayou
Description Replace existing bridge and approaches (NBI No. 12-020-0-2523-02-011) - Demolish the existing bridge and roadway approaches and replace with a new, 2-lane bridge and new bridge approaches and bring the bridge and approaches up to current standards.
Timeframe Short Term (0-5 Years)
Estimated Cost $75,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - FM 2094 Pedestrian Improvements
down-arrow
Project ID 1001
Agency Name TxDOT Houston District
Project Title FM 2094 Pedestrian Improvements
Facility/Street/Highway FM 2094
Limits Twin Oaks Blvd to Lawrence
Description Construct 5-foot wide Pedestrian Path and a 10-foot wide Shared Use Path with intersection improvements and pedestrian crossings between Twin Oaks Blvd and Lawrence Road
Timeframe Long Term (More than 10 Years)
Estimated Cost $10,000,000.00
TxDOT Houston District - FM 2234 Intersection Improvements
down-arrow
Project ID 1002
Agency Name TxDOT Houston District
Project Title FM 2234 Intersection Improvements
Facility/Street/Highway FM 2234
Limits From North of US 90A to South of US 90A
Description Construct intersection improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $30,900,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 270 Widening
down-arrow
Project ID 1003
Agency Name TxDOT Houston District
Project Title FM 270 Widening
Facility/Street/Highway FM 270
Limits From FM 518 to FM 646
Description Reconstruct and widen from 2-lane to 4-lane roadway and implement access management treatments including raised median and bike/ped facilities.
Timeframe Medium Term (6-10 Years)
Estimated Cost $40,800,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 2759 Reconstruction and Widen
down-arrow
Project ID 1004
Agency Name TxDOT Houston District
Project Title FM 2759 Reconstruction and Widen
Facility/Street/Highway FM 2759
Limits From FM 762 to Thompson Road
Description Reconstruct and widen from 2 to 4 lane concrete curb and gutter road.
Timeframe Medium Term (6-10 Years)
Estimated Cost $70,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 2855 Extension to IH 10 W
down-arrow
Project ID 1005
Agency Name TxDOT Houston District
Project Title FM 2855 Extension to IH 10 W
Facility/Street/Highway FM 2855
Limits From US 90 to IH 10 W
Description Reconstruct and Widen from 2 to 4 lanes and extend FM 2855 (currently known as Brookline Rd) to IH 10 W
Timeframe Medium Term (6-10 Years)
Estimated Cost $35,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 2920 Widening
down-arrow
Project ID 1006
Agency Name TxDOT Houston District
Project Title FM 2920 Widening
Facility/Street/Highway FM 2920
Limits From BU 290-H to Becker Rd.
Description Reconstruct and widen from 2 to 4 lanes - The project proposes to address congestion along the roadway between Cypress-Rosehill and US 290 by reconstructing and widening the existing two-lane portion of FM 2920 between Becker Road and US 290. This roadway section will resemble the four-lane section that exists from Cypress-Rosehill eastward. The project will include sidewalks and cyclists can ride on the wide shoulders.
Timeframe Medium Term (6-10 Years)
Estimated Cost $73,710,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 2920 Widening
down-arrow
Project ID 1007
Agency Name TxDOT Houston District
Project Title FM 2920 Widening
Facility/Street/Highway FM 2920
Limits From Cypress-Rosehill Road to SH 249
Description Widen from 4 to 6 lanes - The project proposes to address congestion along the roadway between Cypress-Rosehill and SH 249 by widening the existing four-lane portion of FM 2920 between Cypress Rosehill and SH 249. The project will include sidewalks and cyclists can ride on the wide shoulders.
Timeframe Medium Term (6-10 Years)
Estimated Cost $116,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 2920 Widening
down-arrow
Project ID 1008
Agency Name TxDOT Houston District
Project Title FM 2920 Widening
Facility/Street/Highway FM 2920
Limits From Becker Rd to Cypress-Rosehill Rd
Description Reconstruct and widen from 2 to 4 lanes - The project proposes to address congestion along the roadway between Cypress-Rosehill and US 290 by reconstructing and widening the existing two-lane portion of FM 2920 between Becker Road and Cypress Rosehill Road. The project will include sidewalks and cyclists can ride on the wide shoulders.
Timeframe Medium Term (6-10 Years)
Estimated Cost $57,200,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 2977 Widening
down-arrow
Project ID 1009
Agency Name TxDOT Houston District
Project Title FM 2977 Widening
Facility/Street/Highway FM 2977
Limits From FM 762 to FM 361
Description Widen from 2-lane to 4-lane. This project proposes to add two new lanes, raised medians, and bicycle/pedestrian facilities.
Timeframe Medium Term (6-10 Years)
Estimated Cost $86,900,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 3083 Widening
down-arrow
Project ID 1010
Agency Name TxDOT Houston District
Project Title FM 3083 Widening
Facility/Street/Highway FM 3083
Limits From SH 105 W to IH 45
Description Widen from 2-lane to a 4-lane divided roadway.
Timeframe Medium Term (6-10 Years)
Estimated Cost $33,750,000.00
High Growth Area Needs Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 359 Bike Tourism Trail
down-arrow
Project ID 1011
Agency Name TxDOT Houston District
Project Title FM 359 Bike Tourism Trail
Facility/Street/Highway FM 359
Limits From 1458 to Gessner Rd
Description The project includes a 8- to 10- foot shoulders, high visibility crossing striping, ADA ramps, pavement markings, resting area pads and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $5,400,000.00
Transit Questionnaire View Questionnaire
TxDOT Houston District - FM 359 Widening
down-arrow
Project ID 1012
Agency Name TxDOT Houston District
Project Title FM 359 Widening
Facility/Street/Highway FM 359
Limits From South IH 10 W to US 90
Description Widen from 2 lanes to 4 lane urban divided roadway
Timeframe Medium Term (6-10 Years)
Estimated Cost $7,750,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 359 Widening
down-arrow
Project ID 1013
Agency Name TxDOT Houston District
Project Title FM 359 Widening
Facility/Street/Highway FM 359
Limits From FM 362 to FM 1458
Description Reconstruct and widening from 2 to 4 lanes and intersection improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $35,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 359 Widening
down-arrow
Project ID 1014
Agency Name TxDOT Houston District
Project Title FM 359 Widening
Facility/Street/Highway FM 359
Limits From FM 1093 to Mason
Description Widen from 2 lanes to a 4 -lane urban divided roadway for approximately 9.5 miles.
Timeframe Long Term (More than 10 Years)
Estimated Cost $137,750,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 359 Reconstruct/Realign and Widen
down-arrow
Project ID 1015
Agency Name TxDOT Houston District
Project Title FM 359 Reconstruct/Realign and Widen
Facility/Street/Highway FM 359
Limits From US 290 to FM 1458
Description Reconstruct and widen from 2 to 4 lanes, realigning existing curves, turn lanes, and intersection improvements.
Timeframe Long Term (More than 10 Years)
Estimated Cost $230,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 359 Widening
down-arrow
Project ID 1016
Agency Name TxDOT Houston District
Project Title FM 359 Widening
Facility/Street/Highway FM 359
Limits From FM 1093 to IH 10 W
Description Reconstruct and widen from 2 to 4 lanes and intersection improvements.
Timeframe Long Term (More than 10 Years)
Estimated Cost $70,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 362 Widening
down-arrow
Project ID 1017
Agency Name TxDOT Houston District
Project Title FM 362 Widening
Facility/Street/Highway FM 362
Limits From FM 359 to FM 529
Description Reconstruct and widen from 2 to 4 lanes and intersection improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $63,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 362 Reconstruct/Realign and widening
down-arrow
Project ID 1018
Agency Name TxDOT Houston District
Project Title FM 362 Reconstruct/Realign and widening
Facility/Street/Highway FM 362
Limits From FM 1736 to FM 529
Description Reconstruct and widen from 2 to 4 lanes, realigning existing curves (including intersection at FM 1488 and FM 1736), turn lanes, and intersection improvements.
Timeframe Long Term (More than 10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 517 Widening
down-arrow
Project ID 1019
Agency Name TxDOT Houston District
Project Title FM 517 Widening
Facility/Street/Highway FM 517
Limits From FM 3436 to SH 146
Description WIDEN TO 4-LANE DIVIDED W/ CURB & GUTTER
Timeframe Long Term (More than 10 Years)
Estimated Cost $14,910,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 518 Widening
down-arrow
Project ID 1020
Agency Name TxDOT Houston District
Project Title FM 518 Widening
Facility/Street/Highway FM 518
Limits From FM 865 to SH 35
Description Widen from 4-lanes to 6-lanes. A raised median will be included and may vary between 14 and 18 feet. Convert the existing open ditch drainage system to a curb and gutter drainage system. In addition, outside pedestrian sidewalks and bikeways are proposed.
Timeframe Short Term (0-5 Years)
Estimated Cost $76,380,000.00
High Growth Area Needs Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 518 Bike/Ped Improvements, Landscaping/Streetscaping Improvements.
down-arrow
Project ID 1021
Agency Name TxDOT Houston District
Project Title FM 518 Bike/Ped Improvements, Landscaping/Streetscaping Improvements.
Facility/Street/Highway FM 518 (Main St)
Limits Magnolia to Iowa Ave
Description Landscaping and streetscaping enhancements along Main St including pedestrian improvements, off street parking locations, transferringoverhead utilities to underground, and a visible entrance way into the Downtown (sign to be located along FM 518 near Magnolia Aveintersection).
Timeframe Medium Term (6-10 Years)
Estimated Cost $500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 518 Reconstruction and Bike/Ped improvements
down-arrow
Project ID 1022
Agency Name TxDOT Houston District
Project Title FM 518 Reconstruction and Bike/Ped improvements
Facility/Street/Highway FM 518 (Main St)
Limits From Walker to Webster
Description Reconstruct roadway to include curb and gutter, multiple drainage improvements, and Bike/Ped improvements
Timeframe Long Term (More than 10 Years)
Estimated Cost $10,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 518 Intersection Improvements
down-arrow
Project ID 1023
Agency Name TxDOT Houston District
Project Title FM 518 Intersection Improvements
Facility/Street/Highway FM 518 (Main St)
Limits AT SH 3
Description INTERSECTION IMPROVEMENTS
Timeframe Long Term (More than 10 Years)
Estimated Cost $5,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 521
down-arrow
Project ID 1024
Agency Name TxDOT Houston District
Project Title FM 521
Facility/Street/Highway FM 521
Limits SH 6 to Brazoria C/L (CR 56)
Description WIDEN FROM 2 LANES TO 4 LANES DIVIDED
Timeframe Short Term (0-5 Years)
Estimated Cost $70,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 521 Sidewalks
down-arrow
Project ID 1025
Agency Name TxDOT Houston District
Project Title FM 521 Sidewalks
Facility/Street/Highway FM 521
Limits From West Airport Blvd. to South SL 8
Description The project includes a 5- to 6- foot wide sidewalks, high visibility crossing striping, ADA ramps, pavement markings, bus stop pads, and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,700,000.00
Transit Questionnaire View Questionnaire
TxDOT Houston District - FM 521 Widening and Railroad grade separation
down-arrow
Project ID 1026
Agency Name TxDOT Houston District
Project Title FM 521 Widening and Railroad grade separation
Facility/Street/Highway FM 521
Limits From CR 56 to SH 6
Description Widen from 4-lanes to 6-lanes divided. The FM 521 project extends from State Highway 6 to County Road 56 in Fort Bend County. The project includes a railroad grade separation. The area is rapidly developing with new subdivisions and a new high school adjacent to the road.
Timeframe Medium Term (6-10 Years)
Estimated Cost $53,600,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 521 Widening and Bike/Ped improvements
down-arrow
Project ID 1027
Agency Name TxDOT Houston District
Project Title FM 521 Widening and Bike/Ped improvements
Facility/Street/Highway FM 521
Limits From FM 1462 to CR 56
Description Widen from 2-lanes to 4-lanes. This project proposes to add two new lanes, raised medians, and bicycle/pedestrian facilities.
Timeframe Long Term (More than 10 Years)
Estimated Cost $81,480,000.00
TxDOT Houston District - FM 528 Widening
down-arrow
Project ID 1028
Agency Name TxDOT Houston District
Project Title FM 528 Widening
Facility/Street/Highway FM 528
Limits From BS 35 to SH 35 BYPASS
Description Widen from 2-lanes to 4-lanes. This project proposes to add two new lanes, raised medians, curb and gutter, and bicycle/pedestrian facilities.
Timeframe Medium Term (6-10 Years)
Estimated Cost $8,450,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - FM 528 New Roadway
down-arrow
Project ID 1029
Agency Name TxDOT Houston District
Project Title FM 528 New Roadway
Facility/Street/Highway FM 528
Limits From BS 35 (N Gordon St) to SH 6
Description Construct new location (On existing portions of Midtown Pkwy and Brazos St), 2-lane roadway with railroad grade separation.
Timeframe Medium Term (6-10 Years)
Estimated Cost $21,200,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 529 Widening
down-arrow
Project ID 1030
Agency Name TxDOT Houston District
Project Title FM 529 Widening
Facility/Street/Highway FM 529
Limits From Waller County Line to Katy Hockley Cutoff
Description Widen from 2-lanes to 4-lanes. This rural section will include widening FM 529 to a four-lane roadway, with a raised median between Katy Hockley Cut Off Road and the Waller County Line. The roadway will include an 18-foot median with openings, 12-foot outside shoulders, and 10-foot wide shared use path on each side of the roadway.
Timeframe Short Term (0-5 Years)
Estimated Cost $50,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 529 Widening
down-arrow
Project ID 1031
Agency Name TxDOT Houston District
Project Title FM 529 Widening
Facility/Street/Highway FM 529
Limits From Katy Hockley Cutoff to SH 99
Description Widen from 2-lanes to 6-lanes divided. The proposed improvements will include an urban roadway section with 6-travel lanes, 3 in each direction, with curb and gutter. The roadway would include an 18-foot median with openings and 10-foot shared-use paths for cyclists and pedestrians. The proposed new right-of-way width would be 150 feet, which is 30 feet wider than the existing right-of-way.
Timeframe Short Term (0-5 Years)
Estimated Cost $53,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 529 Widening
down-arrow
Project ID 1032
Agency Name TxDOT Houston District
Project Title FM 529 Widening
Facility/Street/Highway FM 529
Limits From FM 362 to Harris County Line
Description Widen from 2-lanes to 4-lanes. This rural section will include widening FM 529 to a four-lane roadway, with a raised median between Katy Hockley Cut Off Road and the Waller County Line. The roadway will include an 18-foot median with openings, 12-foot outside shoulders, and 10-foot wide shared use paths on each of side of the roadway.
Timeframe Short Term (0-5 Years)
Estimated Cost $78,100,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - FM 529 Reconstruct/Realign on new location
down-arrow
Project ID 1033
Agency Name TxDOT Houston District
Project Title FM 529 Reconstruct/Realign on new location
Facility/Street/Highway FM 529
Limits From FM 362 to FM 359
Description Remove/Realign the dog-leg on FM 529 along FM 362 and move FM 529 to new location including intersection improvements at FM 362.
Timeframe Medium Term (6-10 Years)
Estimated Cost $45,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 529 Widening
down-arrow
Project ID 1034
Agency Name TxDOT Houston District
Project Title FM 529 Widening
Facility/Street/Highway FM 529
Limits From FM 359 to Austin C/L
Description Reconstruct and widen from 2 to 4 lanes and intersection improvements.
Timeframe Long Term (More than 10 Years)
Estimated Cost $70,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 723 Widening
down-arrow
Project ID 1035
Agency Name TxDOT Houston District
Project Title FM 723 Widening
Facility/Street/Highway FM 723
Limits From Avenue D to US 90A/ Avenue H
Description Widen from 2-lanes to 4-lanes.
Timeframe Medium Term (6-10 Years)
Estimated Cost $8,400,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 762 Extension
down-arrow
Project ID 1036
Agency Name TxDOT Houston District
Project Title FM 762 Extension
Facility/Street/Highway FM 762 (10th St)
Limits From Clay Street to McCrary/Peek
Description Extend FM 762 on new location (and on 10th Street) north over the Brazos River to connect with McCrary Road.
Timeframe Long Term (More than 10 Years)
Estimated Cost $120,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - FM 830 Widening
down-arrow
Project ID 1037
Agency Name TxDOT Houston District
Project Title FM 830 Widening
Facility/Street/Highway FM 830
Limits From Old Montgomery Road to SH 75
Description Widen roadway from 2 to 4 lanes.
Timeframe Medium Term (6-10 Years)
Estimated Cost $34,100,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1038
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From Mangum Road to 43rd/Clay Road
Description Reconstruct Hempstead Road and add one transit lane in each direction at grade and construct 4 elevated managed lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $314,563,107.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1039
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From 43rd/Clay Road to Gessner Road
Description Reconstruct Hempstead Road and add one transit lane in each direction at grade and construct 4 elevated managed lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $262,135,922.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1040
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From west of Huffmeister Road to Jones Road
Description Construct 4 managed lanes (non-toll)
Timeframe Medium Term (6-10 Years)
Estimated Cost $91,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1041
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From Gessner Road to Jones Road
Description Reconstruct Hempstead Road and add one transit lane in each direction at grade and construct 4 elevated managed lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $270,873,786.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1042
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From SH 99 to west of Huffmeister Road
Description Construct 4 managed lanes (non-toll)
Timeframe Medium Term (6-10 Years)
Estimated Cost $260,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1043
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From IH 610 to Mangum Road
Description Reconstruct Hempstead Road and add one transit lane in each direction at grade and construct 4 elevated managed lanes
Timeframe Medium Term (6-10 Years)
Estimated Cost $52,427,185.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1044
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From 43rd St/Clay Rd to W of SL 8
Description RECONSTRUCT AS DIVIDED 4 LANE ROADWAY (FUTURE HEMPSTEAD HIGHWAY FRONTAGE ROADS)
Timeframe Medium Term (6-10 Years)
Estimated Cost $275,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1045
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From IH 610 W to Mangum Road
Description RECONSTRUCT AS DIVIDED 4 LANE ROADWAY (FUTURE HEMPSTEAD HIGHWAY FRONTAGE ROADS)
Timeframe Medium Term (6-10 Years)
Estimated Cost $120,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road
down-arrow
Project ID 1046
Agency Name TxDOT Houston District
Project Title Hempstead Road
Facility/Street/Highway Hempstead Road
Limits From Mangum Road to 43rd St/ Clay Rd
Description RECONSTRUCT AS DIVIDED 4 LANE ROADWAY (FUTURE HEMPSTEAD HIGHWAY FRONTAGE ROADS)
Timeframe Medium Term (6-10 Years)
Estimated Cost $215,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - Hempstead Road DCs at IH 610 W
down-arrow
Project ID 1047
Agency Name TxDOT Houston District
Project Title Hempstead Road DCs at IH 610 W
Facility/Street/Highway Hempstead Road
Limits From W of Mangum/18th St to S of Old Katy Rd on IH 610 W
Description CONSTRUCT INTERCHANGE WITH MANAGED LANES AND 2 DIRECT CONNECTORS (EB - SB, WB - NB)
Timeframe Medium Term (6-10 Years)
Estimated Cost $352,140,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 10 Resiliency
down-arrow
Project ID 1048
Agency Name TxDOT Houston District
Project Title IH 10 Resiliency
Facility/Street/Highway IH 10
Limits From Studemont Street to Houston Avenue
Description Reconstruct the existing IH-10 W mainlanes and HOV lanes to raise the roadway out of the White Oak Bayou floodway and Construct a new shared use path along White Oak Bayou.
Timeframe Short Term (0-5 Years)
Estimated Cost $347,000,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 Inner Katy Drainage Improvements (Polo Fields)
down-arrow
Project ID 1049
Agency Name TxDOT Houston District
Project Title IH 10 Inner Katy Drainage Improvements (Polo Fields)
Facility/Street/Highway IH 10
Limits From IH 10 south through Memorial Park (Adjacent to Polo Fields)
Description Construct detention pond upgrades, construct outfall channel adjacent to polo fields and provide pump station upgrades.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,200,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - IH 10 Inner Katy Reconstruction and Managed Lanes
down-arrow
Project ID 1050
Agency Name TxDOT Houston District
Project Title IH 10 Inner Katy Reconstruction and Managed Lanes
Facility/Street/Highway IH 10
Limits From IH 610 W to Washington Ave
Description INNER KATY SEG 3: Reconstruct 10 mainlanes and two 3-lane frontage roads. Construct 4 new non-tolled managed lanes and drainage improvements
Timeframe Long Term (More than 10 Years)
Estimated Cost $275,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 Inner Katy Reconstruction and Managed Lanes
down-arrow
Project ID 1051
Agency Name TxDOT Houston District
Project Title IH 10 Inner Katy Reconstruction and Managed Lanes
Facility/Street/Highway IH 10
Limits From Washington Ave to E of Patterson St
Description INNER KATY SEG 2: Reconstruct 10 mainlanes and two 3-lane frontage roads. Construct 4 new non-tolled managed lanes and drainage improvements
Timeframe Long Term (More than 10 Years)
Estimated Cost $465,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 Inner Katy Reconstruction and Managed Lanes
down-arrow
Project ID 1052
Agency Name TxDOT Houston District
Project Title IH 10 Inner Katy Reconstruction and Managed Lanes
Facility/Street/Highway IH 10
Limits From E of Patterson St to E of Studemont
Description INNER KATY SEG 1: Reconstruct 10 mainlanes and two 3-lane frontage roads. Construct 4 new non-tolled managed lanes and drainage improvements
Timeframe Long Term (More than 10 Years)
Estimated Cost $275,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 E SAN JACINTO RIVER BRIDGE AND SS 330 INTERCHANGE RECONSTRUCTION
down-arrow
Project ID 1053
Agency Name TxDOT Houston District
Project Title IH 10 E SAN JACINTO RIVER BRIDGE AND SS 330 INTERCHANGE RECONSTRUCTION
Facility/Street/Highway IH 10 E
Limits W OF MAGNOLIA ST TO W OF THOMPSON RD/SS 330 INTERCHANGE
Description RECONSTRUCT SAN JACINTO RIVER BRIDGE AND WIDEN FROM 6 TO 11 MAIN LANES AND CONSTRUCT 4 NON-TOLLED MANAGED LANES AND SS 330 INTERCHANGE RECONSTRUCTION
Timeframe Medium Term (6-10 Years)
Estimated Cost $555,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 E Widening/Operational Improvements
down-arrow
Project ID 1054
Agency Name TxDOT Houston District
Project Title IH 10 E Widening/Operational Improvements
Facility/Street/Highway IH 10 E
Limits From IH 69 to SL 8
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 10 mainlanes and frontage roads, based on results of the IH 10 East PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $362,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 E Widening/Operational Improvements
down-arrow
Project ID 1055
Agency Name TxDOT Houston District
Project Title IH 10 E Widening/Operational Improvements
Facility/Street/Highway IH 10 E
Limits From SL 8 to SS 330
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 10 mainlanes and frontage roads, based on results of the IH 10 East PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $313,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 E Widening
down-arrow
Project ID 1056
Agency Name TxDOT Houston District
Project Title IH 10 E Widening
Facility/Street/Highway IH 10 E
Limits From SPUR 330 to CHAMBERS C/L
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 10 E mainlanes and frontage roads, based on results of the IH 10 East PEL study
Timeframe Long Term (More than 10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Beaumont District - IH 10 E Widening
down-arrow
Project ID 1057
Agency Name TxDOT Beaumont District
Project Title IH 10 E Widening
Facility/Street/Highway IH 10 E
Limits HARRIS C/L TO SH 99
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 10 E mainlanes and frontage roads, based on results of the IH 10 East PEL study
Timeframe Long Term (More than 10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 W Frontage Roads
down-arrow
Project ID 1058
Agency Name TxDOT Houston District
Project Title IH 10 W Frontage Roads
Facility/Street/Highway IH 10 W
Limits From FM 359 to Fort Bend County Line
Description CONSTRUCT 2 TWO LANE FRONTAGE ROADS ON NEW LOCATION (EASTBOUND AND WESTBOUND). This project fills in the gap of the frontage road system in Fort Bend County on IH 10.
Timeframe Short Term (0-5 Years)
Estimated Cost $50,750,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 W Frontage Roads
down-arrow
Project ID 1059
Agency Name TxDOT Houston District
Project Title IH 10 W Frontage Roads
Facility/Street/Highway IH 10 W
Limits From Waller County Line to Cane Island Parkway
Description CONSTRUCT 2 TWO LANE FRONTAGE ROADS ON NEW LOCATION (EASTBOUND AND WESTBOUND). This project fills in the gap of the frontage road system in Fort Bend County on IH 10.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,700,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 10 W Frontage Road Pedestrian Improvements
down-arrow
Project ID 1060
Agency Name TxDOT Houston District
Project Title IH 10 W Frontage Road Pedestrian Improvements
Facility/Street/Highway IH 10 W
Limits At Snake Creek north of Willow Fork
Description Construct a pedestrian/bicycle underpass for newly constructed frontage roads
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
TxDOT Houston District - IH 10 W Frontage Road Pedestrian Improvements
down-arrow
Project ID 1061
Agency Name TxDOT Houston District
Project Title IH 10 W Frontage Road Pedestrian Improvements
Facility/Street/Highway IH 10 W
Limits At Cane Island Branch
Description Construct a pedestrian/bicycle underpass for newly constructed frontage roads
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
TxDOT Houston District - IH 10 W Frontage Road Pedestrian Improvements
down-arrow
Project ID 1062
Agency Name TxDOT Houston District
Project Title IH 10 W Frontage Road Pedestrian Improvements
Facility/Street/Highway IH 10 W
Limits At Pederson Road
Description Construct 10-foot wide sidewalk and bridge structure from the existing north frontage to the existing south frontage road
Timeframe Short Term (0-5 Years)
Estimated Cost $2,000,000.00
TxDOT Houston District - IH 10 W Frontage Road Pedestrian Improvements
down-arrow
Project ID 1063
Agency Name TxDOT Houston District
Project Title IH 10 W Frontage Road Pedestrian Improvements
Facility/Street/Highway IH 10 W
Limits From Cane Island Branch to Danover Road
Description Construct 10-foot sidewalks along north and south frontage roads
Timeframe Short Term (0-5 Years)
Estimated Cost $2,500,000.00
TxDOT Houston District - IH 10 W Sidepath
down-arrow
Project ID 1064
Agency Name TxDOT Houston District
Project Title IH 10 W Sidepath
Facility/Street/Highway IH 10 W
Limits From Mason Road to Mason Creek
Description The project includes a 10-foot wide sidepath, high visibility crossing striping, ADA ramps, pavement markings, and signage as well as other associated intersection improvements. The project also includes a underpass at IH 10 W.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,300,000.00
TxDOT Houston District - IH 10 W (Inner Katy) Reconstruction and Managed Lanes
down-arrow
Project ID 1065
Agency Name TxDOT Houston District
Project Title IH 10 W (Inner Katy) Reconstruction and Managed Lanes
Facility/Street/Highway IH 10 W
Limits From Voss Rd to IH 610 W
Description INNER KATY SEG 4: Reconstruct 10 mainlanes and two 3-lane frontage roads. Construct 4 new non-tolled managed lanes and drainage improvements
Timeframe Long Term (More than 10 Years)
Estimated Cost $25,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 45 NHHIP, Segment 3A
down-arrow
Project ID 1066
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 3A
Facility/Street/Highway IH 45
Limits from SH 288 to SP 527
Description RECONSTRUCT AND WIDEN FROM 6 TO 10 MAIN LANES (NHHIP SEG 3A)
Timeframe Short Term (0-5 Years)
Estimated Cost $639,360,000.00
TxDOT Houston District - IH 45 N HOV Extension
down-arrow
Project ID 1067
Agency Name TxDOT Houston District
Project Title IH 45 N HOV Extension
Facility/Street/Highway IH 45
Limits From North of FM 1488 to SL 336
Description Restripe existing northbound wide shoulder to extend HOV Lane beyond its current end point north of FM 1488.
Timeframe Short Term (0-5 Years)
Estimated Cost $251,973.00
TxDOT Houston District - IH 45 NHHIP, Segment 3D
down-arrow
Project ID 1068
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 3D
Facility/Street/Highway IH 45
Limits from IH 69 to IH 10
Description CONSTRUCT PARKWAY CONNECTORS INTO DOWNTOWN HOUSTON AND REMOVE EXISTING PIERCE ELEVATED (NHHIP SEG 3D)
Timeframe Medium Term (6-10 Years)
Estimated Cost $241,462,070.00
TxDOT Houston District - IH 45 NHHIP, Segment 3C-1
down-arrow
Project ID 1069
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 3C-1
Facility/Street/Highway IH 45
Limits at IH 10
Description RECONSTRUCT IH45/IH10 INTERCHANGE. IH10 REALIGN/WIDEN FROM 6 TO 8 MAINLANES (ML) FROM WEST OF HOUSTON STREET TO WEST OF MAIN STREET; CONSTRUCT 4 IH10 EXPRESS LANES FROM WEST OF HOUSTON STREET TO WEST OF MAIN STREET; IH45 REALIGN FROM 6 TO 6 ML INCLUDING 3 LANES NB AND 3 LANES SB (3 ML AND 1 AUX LANE) FROM QUITMAN STREET TO WEST OF MAIN STREET; IH-45 WIDENING FROM 1 TO 4 MANAGED LANES FROM QUITMAN STREET TO MILAM/TRAVIS STREETS (NHHIP SEG 3C-1)
Timeframe Medium Term (6-10 Years)
Estimated Cost $1,078,560,000.00
TxDOT Houston District - IH 45 NHHIP, Segment 3D
down-arrow
Project ID 1070
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 3D
Facility/Street/Highway IH 45
Limits at IH 69 S
Description RECONSTRUCT IH45/IH69 INTERCHANGE. IH45 REALIGN/WIDEN FROM 6 TO 7 MAINLANES (ML) INCLUDING 3 ML NB AND 4 ML SB FROM SAUER ST. TO RUNNELS ST.; IH69 RECONSTRUCT FROM 8 TO 8 ML FROM W. OF PIERCE ST. TO S. OF RUNNEL ST. W/ 2, 3-LANE CONTINUOUS FRONTAGE ROADS. (NHHIP SEG 3D)
Timeframe Medium Term (6-10 Years)
Estimated Cost $1,336,721,392.00
TxDOT Houston District - IH 45 Resiliency
down-arrow
Project ID 1071
Agency Name TxDOT Houston District
Project Title IH 45 Resiliency
Facility/Street/Highway IH 45
Limits At Cullen Blvd.
Description Rehabilitate pump station and construct new detention pond
Timeframe Medium Term (6-10 Years)
Estimated Cost $1,891,235.00
TxDOT Houston District - IH 45 NHHIP, Segment 3C-2
down-arrow
Project ID 1072
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 3C-2
Facility/Street/Highway IH 45
Limits at IH 69/IH 10
Description RECONSTRUCT IH45/IH10/IH69 INTERCHANGES. IH10 REALIGN/RECONSTRUCT 8 MAINLANES (ML) FROM W. OF MAIN ST. TO WACO ST.; CONSTRUCT 4 IH10 EXPRESS LANES FROM W. OF MAIN ST. TO W. OF WACO ST.; REALIGN/WIDEN IH45 FROM 6 TO 7 ML INCLUDING 3 LANES EB AND 4 LANES WB FROM S. OF RUNNELS ST. TO W. OF MAIN ST.; RECONSTRUCT IH-69 FROM 8 TO 8 ML FROM S. OF RUNNELS ST. TO N. OF LYONS AVE. (NHHIP SEG 3C-2)
Timeframe Medium Term (6-10 Years)
Estimated Cost $1,216,320,000.00
TxDOT Houston District - IH 45 NHHIP, Segment 1D
down-arrow
Project ID 1073
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 1D
Facility/Street/Highway IH 45
Limits From South of West Rd to SL 8
Description RECONSTRUCT 8 MAIN LANES, RECONSTRUCT AND WIDEN FROM 1 TO 4 MANAGED LANES TRANSITIONING INTO TWO ENTERING AND EXITING LANES AT REVERSIBLE HOV LANE NORTH OF SL8, AND RECONSTRUCT AND WIDEN FROM TWO 2 AND 3-LANES FRONTAGE ROADS TO TWO 2- AND 3- LANES FRONTAGE ROADS (NHHIP SEG 1D)
Timeframe Long Term (More than 10 Years)
Estimated Cost $325,700,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 45 NHHIP, Segment 1C
down-arrow
Project ID 1074
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 1C
Facility/Street/Highway IH 45
Limits From South of Shepherd Drive to South of West Road
Description RECONSTRUCT/WIDEN FROM 8 TO 10 MAINLANES, RECONSTRUCT/WIDEN FROM 1 TO 4 MANAGED LANES; RECONSTRUCT/WIDEN FROM TWO, 2- AND 3-LANE FRONTAGE ROADS TO TWO, 2- AND 3-LANE FRONTAGE ROADS. (NHHIP SEG 1C)
Timeframe Long Term (More than 10 Years)
Estimated Cost $480,500,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 45 N Improvements based on IH 45 N PEL Study
down-arrow
Project ID 1075
Agency Name TxDOT Houston District
Project Title IH 45 N Improvements based on IH 45 N PEL Study
Facility/Street/Highway IH 45 N
Limits From SL 8 to SH 99
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 45 N mainlanes and frontage roads, based on results of the IH 45 North Freeway PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 45 N Improvements based on IH 45 N PEL Study
down-arrow
Project ID 1076
Agency Name TxDOT Houston District
Project Title IH 45 N Improvements based on IH 45 N PEL Study
Facility/Street/Highway IH 45 N
Limits From SH 99 to SH 242
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 45 N mainlanes and frontage roads, based on results of the IH 45 North Freeway PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 45 N Improvements based on IH 45 N PEL Study
down-arrow
Project ID 1077
Agency Name TxDOT Houston District
Project Title IH 45 N Improvements based on IH 45 N PEL Study
Facility/Street/Highway IH 45 N
Limits From SH 242 to LP 336
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 45 N mainlanes and frontage roads, based on results of the IH 45 North Freeway PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $70,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 45 NHHIP, Segment 1B
down-arrow
Project ID 1078
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 1B
Facility/Street/Highway IH 45 N
Limits From Airline Dr to South of Shepherd Dr
Description RECONSTRUCT MAIN LNS, CONSTRUCT 4 MANAGED LNS, AND RECONSTRUCT AND WIDEN FROM TWO 2-LN FRONTAGE RDS TO TWO 3-LN FRONTAGE RDS (NHHIP SEG 1B)
Timeframe Long Term (More than 10 Years)
Estimated Cost $393,500,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 45 NHHIP, Segment 2
down-arrow
Project ID 1079
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 2
Facility/Street/Highway IH 45 N
Limits From IH 10 to IH 610
Description RECONSTRUCT AND WIDEN FROM 4 TO 5 MAIN LANES, CONSTRUCT 4 MANAGED LANES AND RECONSTRUCT AND WIDEN FROM TWO 2- AND 3-LN FRS TO TWO 3-LN FRS (NHHIP SEG 2)
Timeframe Long Term (More than 10 Years)
Estimated Cost $489,135,576.00
TxDOT Houston District - IH 45 NHHIP, Segment 1A
down-arrow
Project ID 1080
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 1A
Facility/Street/Highway IH 45 N
Limits From IH 610 to Airline Drive
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 MAIN LANES, RECONSTRUCT AND WIDEN FROM 1 TO 4 MANAGED LANES AND RECONSTRUCT AND WIDEN FROM TWO 2- AND 3-LANES FRONTAGE ROADS TO TWO 2- AND 3-LANES FRONTAGE ROADS (NHHIP SEG 1A)
Timeframe Long Term (More than 10 Years)
Estimated Cost $675,400,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 45 NHHIP, Segment 2
down-arrow
Project ID 1081
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 2
Facility/Street/Highway IH 45 N
Limits At IH 610 N
Description RECONSTRUCT INTERCHANGE (NHHIP SEG 2)
Timeframe Long Term (More than 10 Years)
Estimated Cost $670,472,971.00
TxDOT Houston District - IH 45 S Improvements based on IH 45 S PEL Study
down-arrow
Project ID 1082
Agency Name TxDOT Houston District
Project Title IH 45 S Improvements based on IH 45 S PEL Study
Facility/Street/Highway IH 45 S
Limits From IH 69 to SPUR 5
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational, and mobility improvements to IH 45 S mainlanes and frontage roads, based on results of the IH 45 South Gulf Freeway PEL study
Timeframe Long Term (More than 10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 45 S Improvements based on IH 45 S PEL Study
down-arrow
Project ID 1083
Agency Name TxDOT Houston District
Project Title IH 45 S Improvements based on IH 45 S PEL Study
Facility/Street/Highway IH 45 S
Limits From SPUR 5 to IH 610 S
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational, and mobility improvements to IH 45 S mainlanes and frontage roads, based on results of the IH 45 South Gulf Freeway PEL study
Timeframe Long Term (More than 10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 45 S Improvements based on IH 45 S PEL Study
down-arrow
Project ID 1084
Agency Name TxDOT Houston District
Project Title IH 45 S Improvements based on IH 45 S PEL Study
Facility/Street/Highway IH 45 S
Limits From IH 610 S to SL 8
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational, and mobility improvements to IH 45 S mainlanes and frontage roads, based on results of the IH 45 South Gulf Freeway PEL study
Timeframe Long Term (More than 10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 610 E Ship Channel Bridge
down-arrow
Project ID 1085
Agency Name TxDOT Houston District
Project Title IH 610 E Ship Channel Bridge
Facility/Street/Highway IH 610 E
Limits From N of Mississippi St to S of SH 225
Description RECONSTRUCT AND WIDEN FROM 8 TO 14 LANE (ADD 2 GENERAL PURPOSE LANES AND 4 MANAGED LANES) AND RAISE SHIP CHANNEL BRIDGE
Timeframe Medium Term (6-10 Years)
Estimated Cost $2,400,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 610 E Reconstruction and Widening to add Managed lanes
down-arrow
Project ID 1086
Agency Name TxDOT Houston District
Project Title IH 610 E Reconstruction and Widening to add Managed lanes
Facility/Street/Highway IH 610 E
Limits From IH 10 E to SH 225
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to the IH 610 E mainlanes and frontage roads, based on results of the SH 225 PEL/IH 610 East PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $150,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 610 E Reconstruction and Widening to add Managed lanes
down-arrow
Project ID 1087
Agency Name TxDOT Houston District
Project Title IH 610 E Reconstruction and Widening to add Managed lanes
Facility/Street/Highway IH 610 E
Limits From SH 225 to IH 45 S
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to the IH 610 E mainlanes and frontage roads, based on results of the SH 225 PEL/IH 610 East PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $50,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 610 N Reconstruction
down-arrow
Project ID 1088
Agency Name TxDOT Houston District
Project Title IH 610 N Reconstruction
Facility/Street/Highway IH 610 N
Limits From US 290 to IH 45 N
Description Safety, operational and mobility improvements to IH 610 N mainlanes and frontage roads, based on results of IH 610 North Feasibility Study
Timeframe Long Term (More than 10 Years)
Estimated Cost $250,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 610 N Reconstruction
down-arrow
Project ID 1089
Agency Name TxDOT Houston District
Project Title IH 610 N Reconstruction
Facility/Street/Highway IH 610 N
Limits From IH 45 N to IH 69 N
Description Safety, operational and mobility improvements to IH 610 N mainlanes and frontage roads, based on results of IH 610 North Feasibility Study
Timeframe Long Term (More than 10 Years)
Estimated Cost $100,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 610 S Reconstruction and Widening
down-arrow
Project ID 1090
Agency Name TxDOT Houston District
Project Title IH 610 S Reconstruction and Widening
Facility/Street/Highway IH 610 S
Limits From IH 45 S to SH 35 (SS 5/Mykawa)
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES)
Timeframe Medium Term (6-10 Years)
Estimated Cost $129,950,000.00
Major Projects Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - IH 610 S Reconstruction and Widening
down-arrow
Project ID 1091
Agency Name TxDOT Houston District
Project Title IH 610 S Reconstruction and Widening
Facility/Street/Highway IH 610 S
Limits From SH 35 (SS 5 /Mykawa) to FM 521
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES)
Timeframe Medium Term (6-10 Years)
Estimated Cost $180,100,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - IH 610 West Express Lanes
down-arrow
Project ID 1092
Agency Name TxDOT Houston District
Project Title IH 610 West Express Lanes
Facility/Street/Highway IH 610 W
Limits From IH 69 S to IH 10 W
Description This project proposes to construct four express lanes from IH 10 W to IH 69 S and connect to existing and proposed managed lanes along IH 10 W and US 290.
Timeframe Long Term (More than 10 Years)
Estimated Cost $350,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - IH 45 NHHIP, Segment 3B
down-arrow
Project ID 1093
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 3B
Facility/Street/Highway IH 69
Limits from SH 288 to IH 45
Description RECONSTRUCT AND WIDEN FROM 8 TO 10 MAIN LANES AND RECONSTRUCT IH 69/SH 288 INTERCHANGE (NHHIP SEG 3B)
Timeframe Short Term (0-5 Years)
Estimated Cost $515,846,188.00
TxDOT Houston District - IH 69 Rehab Pump Station at Hazard Street
down-arrow
Project ID 1094
Agency Name TxDOT Houston District
Project Title IH 69 Rehab Pump Station at Hazard Street
Facility/Street/Highway IH 69
Limits At Hazard Street
Description Rehabilitate pump station including baffles, trash collection system and control system and address concrete flatwork settling
Timeframe Short Term (0-5 Years)
Estimated Cost $3,342,003.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - IH 69 Rehab Pump Station at Mandell Street
down-arrow
Project ID 1095
Agency Name TxDOT Houston District
Project Title IH 69 Rehab Pump Station at Mandell Street
Facility/Street/Highway IH 69
Limits At Mandell Street
Description Rehabilitate pump station, improve trash collection system and upgrade control system
Timeframe Short Term (0-5 Years)
Estimated Cost $150,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - NHHIP SEG 3B - Drainage Improvements
down-arrow
Project ID 1096
Agency Name TxDOT Houston District
Project Title NHHIP SEG 3B - Drainage Improvements
Facility/Street/Highway IH 69
Limits From N of IH 45 to Buffalo Bayou
Description INSTALL PUMP STATION OUTFALL, STORM SEWER, AND CONSTRUCT NEW DETENTION POND (NHHIP SEG 3B)
Timeframe Short Term (0-5 Years)
Estimated Cost $86,184,270.00
TxDOT Houston District - IH 69 S Bridge Resiliency at Brazos River
down-arrow
Project ID 1097
Agency Name TxDOT Houston District
Project Title IH 69 S Bridge Resiliency at Brazos River
Facility/Street/Highway IH 69 S
Limits At Brazos River
Description EROSION CONTROL AND LENGTHEN BRIDGE - The project consists of removing part of the bridge structure along the east bank of the Brazos River and lengthening the bridge section to 1,085 feet to counteract the erosion on the north side of the bridge. Also included are erosion control infrastructure to protect the bridge structure and turnaround lanes from damage.
Timeframe Short Term (0-5 Years)
Estimated Cost $50,961,538.00
TxDOT Houston District - IH 69 S Frontage Road replacement (Local Connection to Brazos River Park)
down-arrow
Project ID 1098
Agency Name TxDOT Houston District
Project Title IH 69 S Frontage Road replacement (Local Connection to Brazos River Park)
Facility/Street/Highway IH 69 S
Limits From East University Drive to IH 69 S
Description Provide for a new east-west road through the U of H Sugarland campus to provide connectivity to the University and to Brazos River Park. Compensates for removal of U turn on IH 69 S which has been destroyed by erosion.
Timeframe Short Term (0-5 Years)
Estimated Cost $20,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - IH 69S RECONSTRUCT AND WIDEN
down-arrow
Project ID 1099
Agency Name TxDOT Houston District
Project Title IH 69S RECONSTRUCT AND WIDEN
Facility/Street/Highway IH 69 S
Limits From SS 527 to SL 8 S
Description RECONSTRUCT AND WIDEN FROM 8 LANES TO 10 LANES
Timeframe Long Term (More than 10 Years)
Estimated Cost $1,267,500,000.00
TxDOT Houston District - IH 45 NHHIP, Segment 3B
down-arrow
Project ID 1100
Agency Name TxDOT Houston District
Project Title IH 45 NHHIP, Segment 3B
Facility/Street/Highway MCGOWEN, TUAM, AND ELGIN ST
Limits AT IH 69
Description RECONSTRUCT 3 BRIDGES (NHHIP SEG 3B)
Timeframe Short Term (0-5 Years)
Estimated Cost $59,701,585.00
TxDOT Houston District - SH 146 DC Ramps to Barbours Cut Port Terminal
down-arrow
Project ID 1101
Agency Name TxDOT Houston District
Project Title SH 146 DC Ramps to Barbours Cut Port Terminal
Facility/Street/Highway SH 146
Limits AT BARBOURS CUT BLVD
Description CONSTRUCT 3 DCs (SB-EB, WB-NB [SH 146], WB-NB [SH 225])
Timeframe Short Term (0-5 Years)
Estimated Cost $50,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 146 Widening and other improvements
down-arrow
Project ID 1102
Agency Name TxDOT Houston District
Project Title SH 146 Widening and other improvements
Facility/Street/Highway SH 146
Limits From Ferry Road to Chambers C/L (Cedar Bayou)
Description Reconstruct and widen from 4 to 6 lanes, median, bicycle/pedestrian facilities and intersection improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $90,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 225 at SL 8 Three Remaining DC ramps
down-arrow
Project ID 1103
Agency Name TxDOT Houston District
Project Title SH 225 at SL 8 Three Remaining DC ramps
Facility/Street/Highway SH 225
Limits AT SL 8
Description CONSTRUCT 3 DIRECT CONNECTOR RAMPS (EB-NB, EB-SB, WB-SB)
Timeframe Short Term (0-5 Years)
Estimated Cost $95,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 225 Widening/Operational Improvements
down-arrow
Project ID 1104
Agency Name TxDOT Houston District
Project Title SH 225 Widening/Operational Improvements
Facility/Street/Highway SH 225
Limits From IH 610 to RED BLUFF RD
Description RECONSTRUCT AND WIDEN FROM 6 TO 12 LANE (ADD 2 GENERAL PURPOSE LANES AND 4 MANAGED LANES), INCLUDING SH 225/IH 610 INTERCHANGE - Safety, operational and mobility improvements to SH 225 mainlanes and frontage roads, based on results of the SH 225 PEL/IH 610 East PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $351,960,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 225 Widening/Operational Improvements
down-arrow
Project ID 1105
Agency Name TxDOT Houston District
Project Title SH 225 Widening/Operational Improvements
Facility/Street/Highway SH 225
Limits From RED BLUFF RD to SL 8
Description RECONSTRUCT AND WIDEN FROM 6 TO 12 LANE (ADD 2 GENERAL PURPOSE LANES AND 4 MANAGED LANES) - Safety, operational and mobility improvements to SH 225 mainlanes and frontage roads, based on results of the SH 225 PEL/IH 610 East PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $146,400,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 225 Widening/Operational Improvements
down-arrow
Project ID 1106
Agency Name TxDOT Houston District
Project Title SH 225 Widening/Operational Improvements
Facility/Street/Highway SH 225
Limits From SL 8 to SH 146
Description RECONSTRUCT AND WIDEN FROM 6 TO 12 LANE (ADD 2 GENERAL PURPOSE LANES AND 4 MANAGED LANES) - Safety, operational and mobility improvements to SH 225 mainlanes and frontage roads, based on results of the SH 225 PEL/IH 610 East PEL study
Timeframe Medium Term (6-10 Years)
Estimated Cost $200,000,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 249 Widening
down-arrow
Project ID 1107
Agency Name TxDOT Houston District
Project Title SH 249 Widening
Facility/Street/Highway SH 249
Limits From BW 8 to IH 45
Description Reconstruct and widen from 6 to 8 lanes. Remove existing flush median, replace with raised median to increase safety, provide bike and ped accommodation, interconnect signals, provide for METRO boost bus stops and improve drainage to reduce flooding.
Timeframe Medium Term (6-10 Years)
Estimated Cost $150,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 288 Widening
down-arrow
Project ID 1108
Agency Name TxDOT Houston District
Project Title SH 288 Widening
Facility/Street/Highway SH 288
Limits From SH 99 (CR 60) to FM 1462
Description Reconstruct and widen from 4-lanes to 6-lanes. The proposed project will widen to the inside, adding two additional lanes (one in each direction), along with turn lanes at select locations. It will provide drainage for stormwater to accommodate the additional pavement. Frontage roads are not included in this project.
Timeframe Medium Term (6-10 Years)
Estimated Cost $56,300,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 288 Widening
down-arrow
Project ID 1109
Agency Name TxDOT Houston District
Project Title SH 288 Widening
Facility/Street/Highway SH 288
Limits From SH 35 to SH 332
Description Reconstruct and widen from 4-lane to 6-lanes. The proposed project will widen to the inside, adding two additional lanes (one in each direction), along with turn lanes at select locations. It will provide drainage for stormwater to accommodate the additional pavement. Frontage roads are not included in this project.
Timeframe Medium Term (6-10 Years)
Estimated Cost $209,300,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 288 Widening
down-arrow
Project ID 1110
Agency Name TxDOT Houston District
Project Title SH 288 Widening
Facility/Street/Highway SH 288
Limits From FM 1462 to SH 35
Description Reconstruct and widen from 4-lanes to 6-lanes. The proposed project will widen to the inside, adding two additional lanes (one in each direction), along with turn lanes at select locations. It will provide drainage for stormwater to accommodate the additional pavement. Frontage roads are not included in this project.
Timeframe Medium Term (6-10 Years)
Estimated Cost $351,100,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 288 Submittals for RTP/Conformity model purposes only
down-arrow
Project ID 1111
Agency Name TxDOT Houston District
Project Title SH 288 Submittals for RTP/Conformity model purposes only
Facility/Street/Highway SH 288
Limits From SH 332 to BS 288 SOUTH
Description WIDEN FROM 4 TO 6 LANES
Timeframe Long Term (More than 10 Years)
Estimated Cost $153,900,000.00
TxDOT Houston District - SH 288 Submittals for RTP/Conformity model purposes only
down-arrow
Project ID 1112
Agency Name TxDOT Houston District
Project Title SH 288 Submittals for RTP/Conformity model purposes only
Facility/Street/Highway SH 288
Limits From BS 288/SH 332 to SH 36
Description WIDEN FROM 6 TO 8 MAIN LANES
Timeframe Long Term (More than 10 Years)
Estimated Cost $118,700,000.00
TxDOT Houston District - SH 288 Submittals for RTP/Conformity model purposes only
down-arrow
Project ID 1113
Agency Name TxDOT Houston District
Project Title SH 288 Submittals for RTP/Conformity model purposes only
Facility/Street/Highway SH 288
Limits From IH 610 S to BRAZORIA C/L
Description CONSTRUCT 6 ULTIMATE TOLL LANES WITH ULTIMATE IH 610 DCs INTERCHANGE
Timeframe Long Term (More than 10 Years)
Estimated Cost $327,600,000.00
TxDOT Houston District - SH 288 B (Velasco St.) Sidewalks
down-arrow
Project ID 1114
Agency Name TxDOT Houston District
Project Title SH 288 B (Velasco St.) Sidewalks
Facility/Street/Highway SH 288 B
Limits From East Ceder St. to E Orange St.
Description The project includes a 5 to 6-foot sidewalks, high visibility crossing striping, ADA ramps, pavement markings, and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,000,000.00
TxDOT Houston District - SH 3 Multiple Intersection Improvements
down-arrow
Project ID 1115
Agency Name TxDOT Houston District
Project Title SH 3 Multiple Intersection Improvements
Facility/Street/Highway SH 3
Limits At South Richey, Edgebrook Dr, El Dorado Blvd, and Bay Area Blvd
Description Change signals to mast arms, replace RR arms, and gates, and lengthen railroad planking. The purpose of the project is to extend sidewalks across the RR tracks parallel to SH 3.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,840,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 3 Sidepath
down-arrow
Project ID 1116
Agency Name TxDOT Houston District
Project Title SH 3 Sidepath
Facility/Street/Highway SH 3
Limits From FM 1765 to FM 519
Description The project includes a 10-foot wide sidepath on SH 3 SB, high visibility crossing striping, ADA ramps, pavement markings, and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,300,000.00
TxDOT Houston District - SH 332 Grade Separation at FM 523
down-arrow
Project ID 1117
Agency Name TxDOT Houston District
Project Title SH 332 Grade Separation at FM 523
Facility/Street/Highway SH 332
Limits From N of FM 523 to S of FM 523
Description Construct grade separation at FM 523.
Timeframe Medium Term (6-10 Years)
Estimated Cost $24,710,000.00
High Growth Area Needs Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 332 Widening
down-arrow
Project ID 1118
Agency Name TxDOT Houston District
Project Title SH 332 Widening
Facility/Street/Highway SH 332
Limits From East of FM 521 to SH 288
Description WIDEN FROM 2 TO 4 LANES (FM 521 TO FM 2004) AND FROM 4 TO 6 LANES (FM 2004 TO SH 288)
Timeframe Medium Term (6-10 Years)
Estimated Cost $114,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 35 Feasibility Study
down-arrow
Project ID 1119
Agency Name TxDOT Houston District
Project Title SH 35 Feasibility Study
Facility/Street/Highway SH 35
Limits From DIXIE DR to BS 35 S (N GORDON ST)
Description Conduct a mobility study to identify mobility and safety improvements on SH 35. Previously MPOIDs 309, 310, 18717, and 18718
Timeframe Short Term (0-5 Years)
Estimated Cost $3,500,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 35 New Location Roadway in Alvin
down-arrow
Project ID 1120
Agency Name TxDOT Houston District
Project Title SH 35 New Location Roadway in Alvin
Facility/Street/Highway SH 35
Limits from BS 35C N to SH 99
Description Construct new location, 4-lane roadway
Timeframe Medium Term (6-10 Years)
Estimated Cost $70,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 35 Widen to 4 Lane Divided Rural
down-arrow
Project ID 1121
Agency Name TxDOT Houston District
Project Title SH 35 Widen to 4 Lane Divided Rural
Facility/Street/Highway SH 35
Limits From BS 35-C (South) to FM 2403
Description Extend the 4-lane divided rural section roadway from where BS 35 connects at SH 35 down to FM 2403
Timeframe Medium Term (6-10 Years)
Estimated Cost $14,240,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 35 Widening
down-arrow
Project ID 1122
Agency Name TxDOT Houston District
Project Title SH 35 Widening
Facility/Street/Highway SH 35
Limits From FM 2403 to FM 523
Description WIDEN FROM 2 TO 4 LANES - This project proposes to add two new lanes, raised medians, and bicycle/pedestrian facilities.
Timeframe Long Term (More than 10 Years)
Estimated Cost $192,300,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 35 New Location
down-arrow
Project ID 1123
Agency Name TxDOT Houston District
Project Title SH 35 New Location
Facility/Street/Highway SH 35
Limits From SH 99 to BS 35C South
Description CONSTRUCT 4 LANE FREEWAY ON NEW LOCATION - The proposed project will add four mainlanes on new location.
Timeframe Long Term (More than 10 Years)
Estimated Cost $80,920,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 35 Construct frontage roads
down-arrow
Project ID 1124
Agency Name TxDOT Houston District
Project Title SH 35 Construct frontage roads
Facility/Street/Highway SH 35
Limits From S OF SH 6 to BS 35C S
Description CONSTRUCT TWO 2-LANE FRONTAGE ROADS
Timeframe Long Term (More than 10 Years)
Estimated Cost $28,100,000.00
TxDOT Houston District - SH 35 Widening
down-arrow
Project ID 1125
Agency Name TxDOT Houston District
Project Title SH 35 Widening
Facility/Street/Highway SH 35
Limits From FM 518 to S OF SH 6
Description Widen roadway from 4 to 6 lanes
Timeframe Long Term (More than 10 Years)
Estimated Cost $175,700,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 6 Pump Station Rehab and Detention Pond
down-arrow
Project ID 1126
Agency Name TxDOT Houston District
Project Title SH 6 Pump Station Rehab and Detention Pond
Facility/Street/Highway SH 6
Limits At BNSF RR near Avenue C/Perry Lane
Description Reconstruct Pump Station and Install New Detention Pond.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,931,283.00
TxDOT Houston District - SH 6 Pedestrian Improvements
down-arrow
Project ID 1127
Agency Name TxDOT Houston District
Project Title SH 6 Pedestrian Improvements
Facility/Street/Highway SH 6
Limits From FM 1093 (Westheimer Road) to Piping Rock Lane
Description The project includes a 5- to 6- foot wide sidewalks NB and a 10ft shared use path SB, high visibility crossing striping, ADA ramps, pavement markings, median refuge and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
TxDOT Houston District - SH 6 Intersection Improvements at FM 529
down-arrow
Project ID 1128
Agency Name TxDOT Houston District
Project Title SH 6 Intersection Improvements at FM 529
Facility/Street/Highway SH 6
Limits At FM 529
Description INTERSECTION IMPROVEMENTS
Timeframe Medium Term (6-10 Years)
Estimated Cost $15,500,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SH 6 Construct Grade Separation
down-arrow
Project ID 1129
Agency Name TxDOT Houston District
Project Title SH 6 Construct Grade Separation
Facility/Street/Highway SH 6
Limits From Pine Forest Road to Royal Mile Lane
Description Construct Grade Separation and Intersection Improvements
Timeframe Medium Term (6-10 Years)
Estimated Cost $32,500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - SH 6 Safety and Operational Improvements
down-arrow
Project ID 1130
Agency Name TxDOT Houston District
Project Title SH 6 Safety and Operational Improvements
Facility/Street/Highway SH 6
Limits From Westheimer (FM 1093) to IH 10 W
Description This project proposes safety and operational improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $40,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - SH 6 Resiliency at Addicks Reservoir
down-arrow
Project ID 1131
Agency Name TxDOT Houston District
Project Title SH 6 Resiliency at Addicks Reservoir
Facility/Street/Highway SH 6
Limits From IH 10 W to Clay Road
Description Raise roadway to eliminate flooding from Addicks Reservoir.
Timeframe Long Term (More than 10 Years)
Estimated Cost $250,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 75 Widening, Drainage Improvements, and Bike/Ped Improvements
down-arrow
Project ID 1132
Agency Name TxDOT Houston District
Project Title SH 75 Widening, Drainage Improvements, and Bike/Ped Improvements
Facility/Street/Highway SH 75
Limits From FM 3083 (Teas Nursery Road) to League Line Road
Description RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED ROADWAY - The proposed project will widen the existing two-lane roadway to a four-lane divided roadway with curbs and gutters. It will provide drainage for stormwater and add five-foot sidewalks on both sides of the roadway.
Timeframe Medium Term (6-10 Years)
Estimated Cost $17,700,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - SH 75 Widening, Drainage Improvements, and Bike/Ped Improvements
down-arrow
Project ID 1133
Agency Name TxDOT Houston District
Project Title SH 75 Widening, Drainage Improvements, and Bike/Ped Improvements
Facility/Street/Highway SH 75
Limits From League Line Road to FM 830
Description RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED ROADWAY - The proposed project will widen the existing two-lane roadway to a four-lane divided roadway with curbs and gutters. It will provide drainage for stormwater and add five-foot sidewalks on both sides of the roadway.
Timeframe Medium Term (6-10 Years)
Estimated Cost $21,800,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - SH 75 Widening, Drainage Improvements, and Bike/Ped Improvements
down-arrow
Project ID 1134
Agency Name TxDOT Houston District
Project Title SH 75 Widening, Drainage Improvements, and Bike/Ped Improvements
Facility/Street/Highway SH 75
Limits From FM 830 to FM 2432
Description RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED ROADWAY - The proposed project will widen the existing two-lane roadway to a four-lane divided roadway with curbs and gutters. It will provide drainage for stormwater and add five-foot sidewalks on both sides of the roadway.
Timeframe Medium Term (6-10 Years)
Estimated Cost $33,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - Construct New Ferry Boat
down-arrow
Project ID 1135
Agency Name TxDOT Houston District
Project Title Construct New Ferry Boat
Facility/Street/Highway SH 87
Limits At Galveston Ferry
Description CONSTRUCT NEW FERRY BOAT (ADDITIONAL SHIP TO FLEET - NOT A REPLACEMENT SHIP) at the Galveston-Bolivar Ferry.
Timeframe Short Term (0-5 Years)
Estimated Cost $43,800,000.00
TxDOT Houston District - SH 87 Bolivar Bridge
down-arrow
Project ID 1136
Agency Name TxDOT Houston District
Project Title SH 87 Bolivar Bridge
Facility/Street/Highway SH 87
Limits From Ferry Rd to SH 108
Description Construct 4 lane Bridge on new location to replace ferry operations
Timeframe Long Term (More than 10 Years)
Estimated Cost $1,200,000,000.00
Major Projects Questionnaire View Questionnaire
TxDOT Houston District - SH 96 Widening and Grade separation at SH 3
down-arrow
Project ID 1137
Agency Name TxDOT Houston District
Project Title SH 96 Widening and Grade separation at SH 3
Facility/Street/Highway SH 96
Limits From IH 45 S to Hometown Heroes Dr/ Tuscan Village Dr
Description Widen the freeway from 4 to 6 lanes and provide a grade separation at SH 3 to relieve congestion.
Timeframe Long Term (More than 10 Years)
Estimated Cost $50,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - SH 99 Frontage Road Pedestrian Improvements
down-arrow
Project ID 1138
Agency Name TxDOT Houston District
Project Title SH 99 Frontage Road Pedestrian Improvements
Facility/Street/Highway SH 99
Limits From IH 10 W to Mercantile Pkwy across SH 99 to Mason Road
Description The project includes side path, high visibility crossing striping, ADA ramps, pavement markings, and signage as well as other associated intersection improvements. Construct a pedestrian/bicycle underpass
Timeframe Short Term (0-5 Years)
Estimated Cost $2,000,000.00
TxDOT Houston District - SH 99 Frontage Rd
down-arrow
Project ID 1139
Agency Name TxDOT Houston District
Project Title SH 99 Frontage Rd
Facility/Street/Highway SH 99
Limits From NB Westheimer Pkwy to Cinco Ranch Blvd
Description Construction of a two lane concrete curb and gutter frontage road.
Timeframe Short Term (0-5 Years)
Estimated Cost $12,000,000.00
TxDOT Houston District - SH 99 Frontage Rd
down-arrow
Project ID 1140
Agency Name TxDOT Houston District
Project Title SH 99 Frontage Rd
Facility/Street/Highway SH 99
Limits From NB Fry Rd to Westheimer Pkwy
Description Construction of a two lane concrete curb and gutter frontage road.
Timeframe Short Term (0-5 Years)
Estimated Cost $25,000,000.00
TxDOT Houston District - SH 99 Sidepath
down-arrow
Project ID 1141
Agency Name TxDOT Houston District
Project Title SH 99 Sidepath
Facility/Street/Highway SH 99
Limits From Colonial Pkwy to IH 10 W
Description The project includes a 10-foot wide sidepath, high visibility crossing striping, ADA ramps, pavement markings, and signage as well as other associated intersection improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,000,000.00
TxDOT Houston District - SH 99 Construct 4 lane tollway
down-arrow
Project ID 1142
Agency Name TxDOT Houston District
Project Title SH 99 Construct 4 lane tollway
Facility/Street/Highway SH 99
Limits AT IH 69 S (SUGARLAND)
Description Construct 4-lane toll way 3rd level overpass. (SEG D)
Timeframe Medium Term (6-10 Years)
Estimated Cost $39,800,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1143
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From LANGSTON DR to KILGORE PWKY/IH 10 E OVERPASS
Description WIDEN FROM 2 LANES TO 4 LANES (TOLL ROAD) (SEG I-1 AND I-2)
Timeframe Medium Term (6-10 Years)
Estimated Cost $33,000,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1144
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From SH 288 to FORT BEND C/L
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANES TOLLWAY (SEG C-3)
Timeframe Long Term (More than 10 Years)
Estimated Cost $120,600,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1145
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From LIBERTY C/L to E OF SH 146 (IN MONT BELVIEU)
Description WIDEN FROM 2 LANES TO 4 LANES (TOLL ROAD) (SEG I-1)
Timeframe Long Term (More than 10 Years)
Estimated Cost $40,000,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1146
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From 0.3 MI S OF FM 1093 to 0.3 MI N OF FM 1093
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANE TOLL BRIDGE AND APPROACHES (PHASE 2) (SEG D)
Timeframe Long Term (More than 10 Years)
Estimated Cost $31,500,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1147
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits AT US 90A
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANE BRIDGE AND APPROACHES (TOLL FEASIBLE) (PHASE 2) (SEG D)
Timeframe Long Term (More than 10 Years)
Estimated Cost $19,000,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1148
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From S OF FM 1093 to IH 69 S
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANE TOLLWAY (PHASE 2) (SEG D)
Timeframe Long Term (More than 10 Years)
Estimated Cost $68,200,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1149
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From FM 762 to IH 69 S
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANE TOLLWAY (PHASE 2) (SEG C-1)
Timeframe Long Term (More than 10 Years)
Estimated Cost $41,400,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1150
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From BRAZORIA C/L to FM 762
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANE TOLLWAY (PHASE 2) (SEG C-2)
Timeframe Long Term (More than 10 Years)
Estimated Cost $155,000,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1151
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits AT IH 69 S
Description CONSTRUCT 4 DIRECT CONNECTORS (TOLL) (SEG D) (EB-NB, WB-NB, SB-EB, SB-WB)
Timeframe Long Term (More than 10 Years)
Estimated Cost $104,000,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1152
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From SH 146 to IH 45 S
Description CONSTRUCT 4-LANE TOLLWAY WITH LIMITED TWO 2-LANE FRONTAGE ROADS (SEG A)
Timeframe Long Term (More than 10 Years)
Estimated Cost $138,000,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1153
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From IH 45 S to BRAZORIA C/L
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANES (TOLLWAY) (PHASE 2) (SEG B)
Timeframe Long Term (More than 10 Years)
Estimated Cost $144,500,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1154
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits AT IH 45 S
Description CONSTRUCT 4 DIRECT CONNECTORS (TOLL) (SEG A) (WB-NB, WB-SB, NB-EB, SB-EB)
Timeframe Long Term (More than 10 Years)
Estimated Cost $88,300,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1155
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits AT SH 146
Description CONSTRUCT 4 DIRECT CONNECTORS (TOLL) (SEG A) (EB-NB, EB-SB, SB-WB, NB-WB)
Timeframe Long Term (More than 10 Years)
Estimated Cost $88,300,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1156
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From SH 146E to CHAMBERS C/L
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANES TOLLWAY AND OVERPASSES (PHASE 2) (SEG I-2)
Timeframe Long Term (More than 10 Years)
Estimated Cost $87,000,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1157
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From IH 45 N to MONTGOMERY C/L
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANES TOLLWAY (PHASE 2) (SEG G)
Timeframe Long Term (More than 10 Years)
Estimated Cost $19,800,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1158
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits AT SH 146
Description CONSTRUCT 2 DIRECT CONNECTORS (TOLL) (SEG I-2) (SB-EB, WB-NB)
Timeframe Long Term (More than 10 Years)
Estimated Cost $46,600,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1159
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits AT HARDY TOLL RD
Description CONSTRUCT 4 DIRECT CONNECTORS (TOLL) (WB-NB, EB-NB, SB-WB, SB-EB) (SEG G)
Timeframe Long Term (More than 10 Years)
Estimated Cost $93,200,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1160
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From COMMUNITY DR to US 90
Description WIDEN FROM 2 LANE TOLLWAY TO 4 LANE TOLLWAY (SEG H)
Timeframe Long Term (More than 10 Years)
Estimated Cost $265,700,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1161
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From US 90 to CHAMBERS C/L
Description WIDEN FROM 2 LANE TOLLWAY TO 4 LANE TOLLWAY (SEG I-1)
Timeframe Long Term (More than 10 Years)
Estimated Cost $212,600,000.00
TxDOT Houston District - SH 99 Submittals for RTP/Conformity model Purposes Only
down-arrow
Project ID 1162
Agency Name TxDOT Houston District
Project Title SH 99 Submittals for RTP/Conformity model Purposes Only
Facility/Street/Highway SH 99
Limits From HARRIS C/L to IH 69 N
Description WIDEN EXISTING PAVEMENT FROM 4 TO 6 LANES TOLLWAY (PHASE 2) (SEG G)
Timeframe Long Term (More than 10 Years)
Estimated Cost $82,100,000.00
TxDOT Houston District - SL 8 Frontage Road Pedestrian Improvements
down-arrow
Project ID 1163
Agency Name TxDOT Houston District
Project Title SL 8 Frontage Road Pedestrian Improvements
Facility/Street/Highway SL 8
Limits From Woodforest Blvd to Wallisville Road (SL 8 NB) and from Wallisville Road to Dalton Oaks Drive (SL 8 SB)
Description The project includes a -5 to 6- foot wide sidewalks, high visibility crossing striping, ADA ramps, pavement markings, and signage as well as other associated intersection improvements. The project also includes a pedestrian bridge.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
TxDOT Houston District - SL 8 Pump Station
down-arrow
Project ID 1164
Agency Name TxDOT Houston District
Project Title SL 8 Pump Station
Facility/Street/Highway SL 8
Limits At Hardy Toll Road near Glee Ln.
Description Reconstruct pump station and outfall system to bring the facilities up to current code.
Timeframe Medium Term (6-10 Years)
Estimated Cost $3,518,019.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - SL 8 Pump Station
down-arrow
Project ID 1165
Agency Name TxDOT Houston District
Project Title SL 8 Pump Station
Facility/Street/Highway SL 8
Limits At IH 69 North
Description Rehabilitate existing pump station and upgrade the pump controls and trash collection system.
Timeframe Medium Term (6-10 Years)
Estimated Cost $3,252,770.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - SL 8 Widening
down-arrow
Project ID 1166
Agency Name TxDOT Houston District
Project Title SL 8 Widening
Facility/Street/Highway SL 8
Limits From North of US 90 to Woodforest Blvd
Description Widen From 4 to 8 Lanes - The roadway will be expanded from a four-lane facility to an eight-lane facility.
Timeframe Medium Term (6-10 Years)
Estimated Cost $60,400,000.00
High Growth Area Needs Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - SL 8 Pump Station
down-arrow
Project ID 1167
Agency Name TxDOT Houston District
Project Title SL 8 Pump Station
Facility/Street/Highway SL 8
Limits At UA 90
Description Rehabilitate Pump Station and Install New Detention Pond.
Timeframe Medium Term (6-10 Years)
Estimated Cost $3,081,033.00
TxDOT Houston District - SS 10 Widening
down-arrow
Project ID 1168
Agency Name TxDOT Houston District
Project Title SS 10 Widening
Facility/Street/Highway SS 10
Limits From SH 36 West of Rosenberg to IH 69 S
Description WIDEN TO 4-LANE DIVIDED ROADWAY
Timeframe Medium Term (6-10 Years)
Estimated Cost $53,870,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - ITS Support for Transtar
down-arrow
Project ID 1169
Agency Name TxDOT Houston District
Project Title ITS Support for Transtar
Facility/Street/Highway Transtar
Limits At Transtar
Description Provide ITS support to Transtar as part of annual support to the facility as a partner and to enhance operations.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - ITS Support for Transtar
down-arrow
Project ID 1170
Agency Name TxDOT Houston District
Project Title ITS Support for Transtar
Facility/Street/Highway Transtar
Limits At Transtar
Description Provide ITS support to Transtar as part of annual support to the facility as a partner and to enhance operations.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - ITS Support for Transtar
down-arrow
Project ID 1171
Agency Name TxDOT Houston District
Project Title ITS Support for Transtar
Facility/Street/Highway Transtar
Limits At Transtar
Description Provide ITS support to Transtar as part of annual support to the facility as a partner and to enhance operations.
Timeframe Short Term (0-5 Years)
Estimated Cost $3,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - ITS Support for Transtar
down-arrow
Project ID 1172
Agency Name TxDOT Houston District
Project Title ITS Support for Transtar
Facility/Street/Highway Transtar
Limits At Transtar
Description Provide ITS support to Transtar as part of annual support to the facility as a partner and to enhance operations.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - US 90A Pump Station and drainage improvements
down-arrow
Project ID 1173
Agency Name TxDOT Houston District
Project Title US 90A Pump Station and drainage improvements
Facility/Street/Highway UA 90A
Limits At Griggs Road
Description Reconstruct Pump Station and Install New Detention Pond.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,795,445.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
TxDOT Houston District - US 290 Widening
down-arrow
Project ID 1174
Agency Name TxDOT Houston District
Project Title US 290 Widening
Facility/Street/Highway US 290
Limits From SH 6 to Harris County Line
Description Reconstruct and wide from 4 to 6 lanes. This project will widen the existing highway to the middle adding a third lane in each direction.
Timeframe Short Term (0-5 Years)
Estimated Cost $133,790,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - US 290 Widening
down-arrow
Project ID 1175
Agency Name TxDOT Houston District
Project Title US 290 Widening
Facility/Street/Highway US 290
Limits From Washington County Line to SH 6
Description Reconstruct and wide from 4 to 6 lanes. This project will widen the existing highway to the middle adding a third lane in each direction.
Timeframe Medium Term (6-10 Years)
Estimated Cost $188,640,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - US 90 Greens Bayou Bridge
down-arrow
Project ID 1176
Agency Name TxDOT Houston District
Project Title US 90 Greens Bayou Bridge
Facility/Street/Highway US 90
Limits From W of Greens Bayou to E of Greens Bayou
Description Construct bridge (6 Main Lanes) over Greens Bayou in gap of US 90 mainlanes.
Timeframe Short Term (0-5 Years)
Estimated Cost $29,100,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - US 90 Widening
down-arrow
Project ID 1177
Agency Name TxDOT Houston District
Project Title US 90 Widening
Facility/Street/Highway US 90
Limits From IH 10 W to FM 2855
Description Widen from 2-lanes to 4-lanes divided. Reconstruct highway from 2 to 4 lanes and install medians and left turn bays. Also reconstruct and widen bridges at Kellner Creek, Brookshire Creek, Willow Fork Creek, and Snake Creek. Construct pedestrian and bicycle facilities and convert the existing open-ditch drainage to a closed stormwater system.
Timeframe Medium Term (6-10 Years)
Estimated Cost $78,200,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - US 90 Widening
down-arrow
Project ID 1178
Agency Name TxDOT Houston District
Project Title US 90 Widening
Facility/Street/Highway US 90
Limits From FM 2855 to Fort Bend County Line
Description Widen from 2-lane to 4-lane divided
Timeframe Medium Term (6-10 Years)
Estimated Cost $57,790,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - US 90 Reconstruct and Operational Improvements
down-arrow
Project ID 1179
Agency Name TxDOT Houston District
Project Title US 90 Reconstruct and Operational Improvements
Facility/Street/Highway US 90
Limits From Waller County Line to FM 1463
Description Reconstruct 4 lanes and operational improvements
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,460,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - US 90 Grade Separation at Purple Sage
down-arrow
Project ID 1180
Agency Name TxDOT Houston District
Project Title US 90 Grade Separation at Purple Sage
Facility/Street/Highway US 90
Limits From West of Purple Sage to East of Purple Sage
Description Construct grade separation (6 Main Lanes) in gap of US 90 mainlanes at Purple Sage intersection.
Timeframe Short Term (0-5 Years)
Estimated Cost $34,300,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - US 90 A Widening
down-arrow
Project ID 1181
Agency Name TxDOT Houston District
Project Title US 90 A Widening
Facility/Street/Highway US 90 A
Limits From FM 359 to SH 99
Description RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES DIVIDED
Timeframe Short Term (0-5 Years)
Estimated Cost $48,200,000.00
Major Projects Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - Widen US 90 A
down-arrow
Project ID 1182
Agency Name TxDOT Houston District
Project Title Widen US 90 A
Facility/Street/Highway US 90 A
Limits From WHARTON C/L to MARICK RD
Description WIDEN FROM 2 TO 4 LANES
Timeframe Long Term (More than 10 Years)
Estimated Cost $76,100,000.00
TxDOT Houston District - Widen US 90 A
down-arrow
Project ID 1183
Agency Name TxDOT Houston District
Project Title Widen US 90 A
Facility/Street/Highway US 90 A
Limits From MARICK RD to W OF SH 36
Description WIDEN FROM 2 TO 4 LANES
Timeframe Long Term (More than 10 Years)
Estimated Cost $90,100,000.00
TxDOT Houston District - US 90A Widening
down-arrow
Project ID 1184
Agency Name TxDOT Houston District
Project Title US 90A Widening
Facility/Street/Highway US 90A
Limits From FM 762 to FM 359
Description Widen from 4-lanes to 6-lanes divided (phase 3 of 3)
Timeframe Medium Term (6-10 Years)
Estimated Cost $28,570,000.00
Regional Goods Movement Questionnaire View Questionnaire
TxDOT Houston District - ITS Equipment Support
down-arrow
Project ID 1185
Agency Name TxDOT Houston District
Project Title ITS Equipment Support
Facility/Street/Highway VA
Limits Various locations district-wide
Description Install new ITS equipment at various locations
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
TxDOT Houston District - CCTV Replacement
down-arrow
Project ID 1186
Agency Name TxDOT Houston District
Project Title CCTV Replacement
Facility/Street/Highway VA
Limits Various locations district-wide
Description Replace CCTV equipment with new upgraded equipment
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
TxDOT Houston District - ITS Equipment Support
down-arrow
Project ID 1187
Agency Name TxDOT Houston District
Project Title ITS Equipment Support
Facility/Street/Highway VA
Limits Various locations district-wide
Description Install new ITS equipment at various locations
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
TxDOT Houston District - DMS Upgrades
down-arrow
Project ID 1188
Agency Name TxDOT Houston District
Project Title DMS Upgrades
Facility/Street/Highway VA
Limits Various locations district-wide
Description Upgrade dynamic message sign boards
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
TxDOT Houston District - ITS Equipment Support
down-arrow
Project ID 1189
Agency Name TxDOT Houston District
Project Title ITS Equipment Support
Facility/Street/Highway VA
Limits Various locations district-wide
Description Provide ITS support
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - CCTV Replacement
down-arrow
Project ID 1190
Agency Name TxDOT Houston District
Project Title CCTV Replacement
Facility/Street/Highway VA
Limits Various locations district-wide
Description Replace CCTV equipment with new upgraded equipment
Timeframe Short Term (0-5 Years)
Estimated Cost $2,000,000.00
TxDOT Houston District - ITS Equipment Support
down-arrow
Project ID 1191
Agency Name TxDOT Houston District
Project Title ITS Equipment Support
Facility/Street/Highway VA
Limits Various locations district-wide
Description Provide ITS support
Timeframe Short Term (0-5 Years)
Estimated Cost $3,500,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - DMS Upgrades
down-arrow
Project ID 1192
Agency Name TxDOT Houston District
Project Title DMS Upgrades
Facility/Street/Highway VA
Limits Various locations district-wide
Description Upgrade dynamic message sign boards
Timeframe Short Term (0-5 Years)
Estimated Cost $1,000,000.00
TxDOT Houston District - Communication Upgrades
down-arrow
Project ID 1193
Agency Name TxDOT Houston District
Project Title Communication Upgrades
Facility/Street/Highway VA
Limits Various locations district-wide
Description Upgrade communications system
Timeframe Short Term (0-5 Years)
Estimated Cost $2,000,000.00
TxDOT Houston District - Connect Smart Phase 2 (FY 23, 24, 25) - Marketing and Outreach
down-arrow
Project ID 1194
Agency Name TxDOT Houston District
Project Title Connect Smart Phase 2 (FY 23, 24, 25) - Marketing and Outreach
Facility/Street/Highway VA
Limits Various locations district-wide
Description ConnectSmart Phase 2 – Marketing and Outreach
Timeframe Short Term (0-5 Years)
Estimated Cost $3,000,000.00
TxDOT Houston District - Connect Smart Phase 2 (FY 23, 24, 25) - Features Expansion
down-arrow
Project ID 1195
Agency Name TxDOT Houston District
Project Title Connect Smart Phase 2 (FY 23, 24, 25) - Features Expansion
Facility/Street/Highway VA
Limits Various locations district-wide
Description ConnectSmart Phase 2 – Features Expansion
Timeframe Short Term (0-5 Years)
Estimated Cost $12,000,000.00
TxDOT Houston District - Connect Smart Phase 2 (FY 23, 24, 25) - Operations and Maintenance
down-arrow
Project ID 1196
Agency Name TxDOT Houston District
Project Title Connect Smart Phase 2 (FY 23, 24, 25) - Operations and Maintenance
Facility/Street/Highway VA
Limits Various locations district-wide
Description ConnectSmart Phase 2 – Operations and Maintenance
Timeframe Short Term (0-5 Years)
Estimated Cost $900,000.00
Waller County - Woods Rd North Expansion
down-arrow
Project ID 1197
Agency Name Waller County
Project Title Woods Rd North Expansion
Facility/Street/Highway Woods Rd
Limits US-90 to IH-10
Description Expans existing 2 lane road to 4 Lanes road with CLTL
Timeframe Short Term (0-5 Years)
Estimated Cost $4,700,000.00
City of Bunker Hill Village - Memorial Drive Phase 2
down-arrow
Project ID 1198
Agency Name City of Bunker Hill Village
Project Title Memorial Drive Phase 2
Facility/Street/Highway Memorial Drive Gessner Lane
Limits Tallowood Road to Warrenton Drive Just north of Memorial Drive to Vanderpool Lane
Description Reconstruction of Memorial Drive and a components of Gessner (reconstruct northbound travel lanes; construct 6-FT sidewalks on southbound side) to improve access management, multimodal safety, transit access, and drainage. Includes pedestrian and bicycle facilities.
Timeframe Short Term (0-5 Years)
Estimated Cost $29,200,000.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Houston - Dairy Ashford
down-arrow
Project ID 1199
Agency Name City of Houston
Project Title Dairy Ashford
Facility/Street/Highway Dairy Ashford Rd.
Limits From Briar Forest Dr. to Memorial Dr. Intersection improvements at Briar Patch Dr. & Briar Forest Dr.
Description Improvements include Reconstruction of the roadway while maintaining existing number of lanes along Dairy Ashford and with 6-foot sidewalks, new bridges over Buffalo Bayou, and drainage improvements to convey the runoff from the project area and meet COH design requirements. Improvements also include intersection improvements as well as installation of new pedestrian crosswalks at 3 locations.
Timeframe Short Term (0-5 Years)
Estimated Cost $36,336,900.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Houston - Lower Westheimer
down-arrow
Project ID 1200
Agency Name City of Houston
Project Title Lower Westheimer
Facility/Street/Highway Westheimer Rd.
Limits From Montrose Blvd to Main St
Description Improvements include reconstruction of Westheimer Road and all intersections within the project limits to facilitate safe transportation options for all roadway users, including those walking, biking, taking transit, and driving. The proposed 3-lane cross section will accommodate safe and efficient traffic operations, support Metro BOOST transit improvements, and prioritize space for wide sidewalk areas and pedestrian amenities. Safe crossings for people walking, biking, and taking transit will be provided at regular intervals along the corridor.
Timeframe Short Term (0-5 Years)
Estimated Cost $25,000,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Houston - Oates Rd
down-arrow
Project ID 1201
Agency Name City of Houston
Project Title Oates Rd
Facility/Street/Highway Oates Rd.
Limits From Wallisville to Beaumont Highway
Description Improvements include full concrete reconstruction of the corridor to include two 11-ft lanes (with 1-ft offsets) with a 12-ft center turn lane in the middle, as well as pedestrian improvements which include two 10-ft shared use paths on both sides of the road.
Timeframe Short Term (0-5 Years)
Estimated Cost $29,500,000.00
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Houston - Parker Road
down-arrow
Project ID 1202
Agency Name City of Houston
Project Title Parker Road
Facility/Street/Highway Parker Rd.
Limits W. Little York & Jensen
Description Improvements include reducing vehicle lanes to meet capacity and improving intersections for all road users including pedestrian enhancements and bikeways on either side of the roadway
Timeframe Short Term (0-5 Years)
Estimated Cost $4,000,000.00
City of Houston - Aldine-Westfield
down-arrow
Project ID 1203
Agency Name City of Houston
Project Title Aldine-Westfield
Facility/Street/Highway Aldine-Westfield
Limits From BW 8 to S of Little York Rd.
Description The proposed project would improve the roadway from the existing 2-way road to a 4-lane divided corridor with a median, improved intersections and turning lanes, upgraded signals, and pedestrian facilities. Improvements to the drainage along the corridor include replacing the open ditch drainage system with a curb and gutter system. Improvement include pedestrian enhancements such as a sidewalk and bikeway on either side of the roadway.
Timeframe Medium Term (6-10 Years)
Estimated Cost $155,000,000.00
Major Projects Questionnaire View Questionnaire
City of Houston - Gellhorn Dr.
down-arrow
Project ID 1204
Agency Name City of Houston
Project Title Gellhorn Dr.
Facility/Street/Highway Gellhorn Dr.
Limits Between I-10 on the south and I-610 on the north
Description Project includes improvement of freight connectivity between IH-610 & IH-10 as well as intersection operations. Improvements will also create safer pedestrian & bicycle facilities and mitigate storm sewer deficiencies.
Timeframe Short Term (0-5 Years)
Estimated Cost $17,786,415.00
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Houston - City of Houston - Safety Package
down-arrow
Project ID 1205
Agency Name City of Houston
Project Title City of Houston - Safety Package
Facility/Street/Highway W 43rd St. Bailey St. Beauchamp St. Bissonnet St. Campbell Rd. Cook Rd. Newhouse St. TC Jester Blvd. Westpark Dr. Cavalcade @ Hirsch Yale @ 6th Fannin @ Pease Memorial @ Pierce 75th/Garland @ Griggs Fannin @ Pierce Aldine Westfield @ Aldine Mail Route
Limits W 43rd St. & Curtin St. From 2034 Bailey St. to 100 McGowen St. From 2614 Beauchamp St. to 1602 White Oak Dr. Bissonnet St. & Court Glen Dr. Intersection Campbell Rd. and Peppermill Rd. 6900 Cook Rd. From 1112 S Shepherd Dr. to 1200 S. Shepherd Dr. From 500' South of W 18th St. to 50' North of W 18th St. From Newcastle Dr. to Weslayan St. Cavalcade St. Cavalcade @ Hirsch Yale @ 6th Fannin @ Pease Memorial @ Pierce 75th/Garland @ Griggs Fannin @ Pierce Aldine Westfield @ Aldine Mail Route
Description The Safety Package project includes the installation of high visibility crosswalks with Pedestrian Hybrid Beacons, traffic signal, pavement markings, curb extensions, curb ramps at intersections, crosswalk improvements, median reconstruction, road diet, roundabouts, etc. at specified locations.
Timeframe Short Term (0-5 Years)
Estimated Cost $9,202,531.00
City of Houston - City of Houston - Railroad Quiet Zones
down-arrow
Project ID 1206
Agency Name City of Houston
Project Title City of Houston - Railroad Quiet Zones
Facility/Street/Highway Alabonson Rd North Houston-Rosslyn Lyons Ave Holcombe Blvd Old Spanish Trail Yale Courtland North Main Cornell Binkman Alba Golf Ella Blvd Oak Forest East TC Jester West TC Jester S. 75th Lawndale Redwood Bobby Lee 66th St Cesar Chavez Blvd / 67th 70th Street Golf Course 65th 66th S Cesar Chavez Blvd / 67th S Sergeant Macario Garcia Dr Wayside 70th St Golf Course N 71st N 72nd Cullen Leeland Milby McKinney York Sampson Laurentide Pleasantville Portwall St Erath St E Hedrick (UP STRANG SUB) 75th (PTRA SOUTHSHORE) 76th (PTRA SOUTHSHORE) 75th (UP BOOTH YARD) 75th (PTRA NONE)
Limits Alabonson Rd North Houston-Rosslyn Lyons Ave Holcombe Blvd Old Spanish Trail Yale Courtland North Main Cornell Binkman Alba Golf Ella Blvd Oak Forest East TC Jester West TC Jester S. 75th Lawndale Redwood Bobby Lee 66th St Cesar Chavez Blvd / 67th 70th Street Golf Course 65th 66th S Cesar Chavez Blvd / 67th S Sergeant Macario Garcia Dr Wayside 70th St Golf Course N 71st N 72nd Cullen Leeland Milby McKinney York Sampson Laurentide Pleasantville Portwall St Erath St E Hedrick (UP STRANG SUB) 75th (PTRA SOUTHSHORE) 76th (PTRA SOUTHSHORE) 75th (UP BOOTH YARD) 75th (PTRA NONE)
Description Quiet Zone project includes installation of Constant Warning( CW) technology, Supplemental Saftey Measures (SMM) and Alternative Safety Measures (ASM) at specified locations.
Timeframe Short Term (0-5 Years)
Estimated Cost $11,275,000.00
City of Houston - Waugh Dr. - Package 1
down-arrow
Project ID 1207
Agency Name City of Houston
Project Title Waugh Dr. - Package 1
Facility/Street/Highway Waugh Dr.
Limits Pedestrian & bicycle connections over Memorial Dr. & Buffalo Bayou
Description This project package includes all short-term pedestrian and bicycle connections over Memorial Drive and Buffalo Bayou. This package was developed to be a short-term series of projects to provide needed access as soon as possible. Project includes construction of multiple pedestrian bridges and intersection connections.
Timeframe Short Term (0-5 Years)
Estimated Cost $24,980,000.00
City of Houston - Waugh Dr. - Package 2 - 4
down-arrow
Project ID 1208
Agency Name City of Houston
Project Title Waugh Dr. - Package 2 - 4
Facility/Street/Highway Waugh Dr.
Limits From Washington St. on the north through the cloverleaf intersection to Allen Parkway
Description Project includes replacement of cloverleaf interchange with SPUI at Memorial Dr., Realignment & rebuild of Bat Bridge over Buffalo Bayou, Realignment and rebuild of Allen Parkway bridge, rebuild of roadway from Washington to Allen Parkway including Waugh & S. Heights, drainage improvements & detention, water line improvements, regional trail connectivity, enhancements of Spotts park & remedial landscape enhancements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $120,780,000.00
Major Projects Questionnaire View Questionnaire
City of Houston / Memorial Heights Redevelopment Authority - Shepherd-Durham Infrastructure Improvements
down-arrow
Project ID 1209
Agency Name City of Houston / Memorial Heights Redevelopment Authority
Project Title Shepherd-Durham Infrastructure Improvements
Facility/Street/Highway Shepherd and Durham Drives and Various Cross Streets (11th, 12th, 14th)
Limits W. 15th Street to IH 10 WB FR
Description Roadway reconstruction to include re-configuration of travel lanes from 4 to 3, addition of bike facilities, and pedestrian infrastrucure
Timeframe Short Term (0-5 Years)
Estimated Cost $65,000,000.00
City of Houston/Hermann Park Conservancy - Hermann Park Connectivity & Safety Improvements
down-arrow
Project ID 1210
Agency Name City of Houston/Hermann Park Conservancy
Project Title Hermann Park Connectivity & Safety Improvements
Facility/Street/Highway Hermann Park Drive Improvements Hermann Park Drive, Caroline Street, Cambridge Street Bayou Connector Trail
Limits Hermann Park Drive Improvements - Hermann Park Drive (Fannin Street to Cambridge Street) - Caroline Street (Hermann Drive to Hermann Park Drive) - Cambridge Street (Hermann Park Drive to MacGregor Way) Bayou Connector Trail Hermann Park Drive to Brays Bayou Trail including new connection underneath MacGregor Way
Description The Hermann Park Drive project will reconfigure Hermann Park Drive with safer intersections and crossings, a dedicated high-comfort bikeway through Hermann Park, more efficient allocation of vehicle travel lanes through the length of the corridor, and better pedestrian and bicycle connections to the City's street, trail, and transit networks. The project requires a mix of reconstruction, repaving, and/or restriping depending on the existing condition of the roadway segment. The Bayou Connector Trail project will also create a new east-west connection from the heart of the park to Brays Bayou trails with a new safe crossing at MacGregor Way. Hermann Park Drive $13.0 million Bayou Connector Trail $13.9 million Total $26.9 million
Timeframe Short Term (0-5 Years)
Estimated Cost $26,900,000.00
East End District in Coordination with Buffalo Bayou Partnership and Harris County Precinct 2 - Navigation Boulevard Reconfiguration
down-arrow
Project ID 1211
Agency Name East End District in Coordination with Buffalo Bayou Partnership and Harris County Precinct 2
Project Title Navigation Boulevard Reconfiguration
Facility/Street/Highway Navigation Boulevard
Limits Lockwood Drive to Mack Street
Description Reconfigure multimodal mobility corridor by converting unused lane capacity into a new dedicated commuter bike route, pedestrian amenities and additional greenspace. Project scope includes necessary work on public utilities. Project is a major component of the Buffalo Bayou East Master Plan.
Timeframe Short Term (0-5 Years)
Estimated Cost $17,250,000.00
Regional Goods Movement Questionnaire View Questionnaire
Greater Northside Management District - Berry Road Reconstruction
down-arrow
Project ID 1212
Agency Name Greater Northside Management District
Project Title Berry Road Reconstruction
Facility/Street/Highway Berry Road
Limits Airline Drive to Jensen Drive
Description Improve safety and multimodal access on corridor, particularly for students and nearby businesses. Improvements will install new sidewalks or shared use paths, improve lighting and signage, address drainage concerns as needed, and rehabilitate roadway where needed.
Timeframe Medium Term (6-10 Years)
Estimated Cost $17,300,000.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Greater Northside Management District - Jensen Drive Reconstruction
down-arrow
Project ID 1213
Agency Name Greater Northside Management District
Project Title Jensen Drive Reconstruction
Facility/Street/Highway Jensen Drive
Limits Parker Road to Kelley Street
Description Reconstruct and reconfigure Jensen Drive from Parker Road to Kelley Street to include modifying the existing cross-section to include continuous bicycle and pedestrian facilities and access to transit facilities. Include stormwater, wastewater, and water improvements.
Timeframe Long Term (More than 10 Years)
Estimated Cost $95,000,000.00
Greater Northside Management District - Tidwell Road Reconstruction
down-arrow
Project ID 1214
Agency Name Greater Northside Management District
Project Title Tidwell Road Reconstruction
Facility/Street/Highway Tidwell Road
Limits Nordling Street to Irvington Boulevard
Description Reconstruct and reconfigure Tidwell Road from Nordling Street to Irvington Blvd to include modifying the existing cross-section to include sidewalks on both sides of the roadway, center median to provide pedestrian refuge, and dedicated left turn lanes throughout the corridor. Includes stormwater, wastewater, and water improvements.
Timeframe Long Term (More than 10 Years)
Estimated Cost $73,000,000.00
Greater Northside Management District - Airline Drive Intersection Improvements and Road Diet
down-arrow
Project ID 1215
Agency Name Greater Northside Management District
Project Title Airline Drive Intersection Improvements and Road Diet
Facility/Street/Highway Airline Drive
Limits Parker Road to North Main Street (Intersection Improvements @ Berry Road and @ Gibbs St/Service St/Link Rd. Repurpose travel lane from E 28th Street to North Main Street)
Description Improve safety and access and several intersections on corridor. Repurpose travel lane and install shared use paths between E 28th Street and North Main Street to enhance pedestrian and cyclist realm.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,000,000.00
Greater Northside Management District - Combined Short Term Improvement Projects
down-arrow
Project ID 1216
Agency Name Greater Northside Management District
Project Title Combined Short Term Improvement Projects
Facility/Street/Highway Airline Drive, Jensen Drive, Tidwell Road
Limits - Airline Drive & Witcher Lane - Airline Drive & Burress Street - Airline Drive & Parker Road - Jensen Drive & Aldine Westfield Road - Jensen Drive south of Tidwell Road at McDonald's entrance - Tidwell Road between Nordling St and Irvington Blvd
Description Improve safety and access at intersections on Airline Drive and Jensen Drive, including upgrading pavement markings, crosswalks, ADA-compliant ramps, install rectangular rapid flashing beacons; mitigate turning movement conflicts on Jensen Drive near McDonald's; spot improvements on Tidwell Road to improve sections of inadequate sidewalks, ADA ramps, crosswalks, and pavement markings.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,500,000.00
Greater Northside Management District - Back-of-Curb Short Term Improvement Projects
down-arrow
Project ID 1217
Agency Name Greater Northside Management District
Project Title Back-of-Curb Short Term Improvement Projects
Facility/Street/Highway Fulton, North Main, Boundary, Brooks, and Freeman
Limits Various locations
Description Install pedestrian lighting, trash receptacles, and bike racks
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
Greater Northside Management District - Safe Access to Transit Improvements
down-arrow
Project ID 1218
Agency Name Greater Northside Management District
Project Title Safe Access to Transit Improvements
Facility/Street/Highway Airline Dr Berry Rd Crosstimbers St Fulton Dr Irvington Blvd Jensen St Parker Rd Tidwell Rd
Limits Tidwell Rd to Lyerly St Airline Dr to Irvington Blvd Fulton St to Jensen Dr Berry Rd to Quitman St Cavalcade to Collingsworth St Tidwell Rd to Vance St East of IH-45 to Aldine Westfield Rd Airline Dr to Irvington Blvd
Description Comprises of the installation of intersection/crosswalk improvements, medians, access management improvements, multimodal signalization improvements, sidewalks, bicycle improvements, ADA ramps, universal accessibility improvements, pedestrian lighting, and functional landscaping, and will enable associated utility/hardscape modifications to improve access to METRO rail and bus corridors in the Greater Northside Management District boundaries
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
Greater Southeast Management District - Greater Third Ward Neighborhood Improvement Project
down-arrow
Project ID 1219
Agency Name Greater Southeast Management District
Project Title Greater Third Ward Neighborhood Improvement Project
Facility/Street/Highway Tuam St Anita St Rosalie St Stuart St Francis St Division St Bastron St St Charles St Gray St Webster St Mcllhenny St McGowen St Nagle St Nagle St Sauer St Hadley St Dennis St Drew St Bastrop St St Charles St
Limits Chartres St to Sauer St Emancipation to Sauer St Emancipation to Sauer St St Emanuel St to Live Oak St St Emanuel St to Ennis St St Charles St to Live Oak St Elgin St to Alabama St Division St to Alabama St Hutchins St to Sauer St Hutchins St to Nagle St Bastrop St to Live Oak St Hutchins St to Live Oak St Hadley St to Webster St Chaco St to Pierce St Gray St to Pierce St Hutchins St to Nagle St Chartres St to Sauer St Chartres St to Sauer St Pierce St to Dennis St Tuam St to Pierce St
Description Project consists of total roadway rehabilitation inclusive of pavement, curb, gutter, sidewalks, drainage, ADA-ramps, and transit pads and access. The project includes a high comfort bicycle facility along Tuam St. Project seeks funding for the FTA-eligible components which are focused on bicycle/pedestrian/transit connectivity. Total Eligible Cost: $10,000,000
Timeframe Short Term (0-5 Years)
Estimated Cost $10,000,000.00
Greater Southeast Management District - MLK Blvd and Old Spanish Trail Improvements
down-arrow
Project ID 1220
Agency Name Greater Southeast Management District
Project Title MLK Blvd and Old Spanish Trail Improvements
Facility/Street/Highway MLK Blvd and Old Spanish Trail
Limits MLK Blvd and Old Spanish Trail
Description Reconfigure intersection to reduce crossing distances and improve safety.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,500,000.00
Greater Southeast Management District - Long, Griggs, Mykawa Rail Safety Improvement Project
down-arrow
Project ID 1221
Agency Name Greater Southeast Management District
Project Title Long, Griggs, Mykawa Rail Safety Improvement Project
Facility/Street/Highway Long Drive Griggs Road Mykawa Road
Limits Intersection @ UPRR and BNSF
Description Construct grade separation to accommodate motorists, bicyclists, pedestrians, and future METRO Light Rail over the BNSF and UPRR railroad tracks. Grade separation will be separate from overhead TxDOT SH-35 project.
Timeframe Short Term (0-5 Years)
Estimated Cost $55,000,000.00
Gulfgate Redevelopment Authority - Telephone Rd Reconstruction
down-arrow
Project ID 1222
Agency Name Gulfgate Redevelopment Authority
Project Title Telephone Rd Reconstruction
Facility/Street/Highway Telephone Rd
Limits IH 610 Frontage - Reveille St
Description Replace all public infrastructure and reconfigure roadway to enhance multimodal access and safety (roadway, utilities, access management, pedestrian realm, bike lane)
Timeframe Short Term (0-5 Years)
Estimated Cost $45,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
International Management District - Safe Streets and Roads for All Program
down-arrow
Project ID 1223
Agency Name International Management District
Project Title Safe Streets and Roads for All Program
Facility/Street/Highway Various segments and intersections throughout the International District on the following facilities: Beechnut Street, Howell Sugar Land Road, Boone Loop, Leawood Blvd, D-118 Conveyance Channel, Cook Road
Limits •Howell Sugar Land Road from Bellaire Blvd to Alief Clodine Road • Beechnut Street from Boone Road to W Sam Houston Parkway • Boone Loop from Boone Road to Wilcrest Drive • Leawood Blvd at Evesborough Drive • D-118 Conveyance Channel from Leawood Blvd to Landsbury Drive • Intersection at Cook Road and Beechnut Street
Description The program will close sidewalk gaps across the District, providing safer connections and enhanced accessibility and connectivity for students, pedestrians, and cyclists. Improvements included as part of the project scope are: installing new and upgrade existing sidewalks and shared use paths; upgrading existing and installing new traffic signals; installing a hooded left turn to eliminate conflicts at turning movements; and installing a new high intensity crosswalk signal near E.A. Olle Middle School.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,900,000.00
International Management District - Bissonnet Street Safe Routes to School
down-arrow
Project ID 1224
Agency Name International Management District
Project Title Bissonnet Street Safe Routes to School
Facility/Street/Highway Bissonnet Street
Limits Eldridge Parkway to Dairy Ashford
Description This project will provide safe routes to school enabling and encouraging children to walk, roll, and bicycle to school in a safer and more appealing environment within the IMD region, particularly for the seven schools adjacent to the project corridor. Improvements include upgrading existing and installing new sidewalks on both sides of Bissonnet Street, installing a new stop sign, installing street lights, upgrading intersections, upgrading bus shelters and bus pads, upgrading existing drainage, and landscaping and beautification to coincide with the District's Landscape Plan.
Timeframe Short Term (0-5 Years)
Estimated Cost $10,200,000.00
International Management District - Bellaire Blvd Signature Reconstruction
down-arrow
Project ID 1225
Agency Name International Management District
Project Title Bellaire Blvd Signature Reconstruction
Facility/Street/Highway Bellaire Blvd
Limits SH 6 to W Sam Houston Parkway
Description This project aims to reduce fatalities and injuries along the corridor, as well as improve streets to encourage economic development, increase property values, and provide for greater mobility. Improvements include upgrading existing and installing new sidewalks; upgrading existing and installing new traffic signals; installing a hooded left turn to eliminate conflicts at turning movements; upgrading pedestrian crossing signals, pavement markings, and ADA accessibility at intersections; addressing access management based on City requirements; upgrading and improving storm water drainage, as well as sanitary sewer and water pipes; upgrading bus shelters; and landscaping and beautification to coincide with the District's Landscape Plan.
Timeframe Long Term (More than 10 Years)
Estimated Cost $148,000,000.00
Memorial Heights Redevelopment Authority - 20th Street Reconstruction & Safety Improvements
down-arrow
Project ID 1226
Agency Name Memorial Heights Redevelopment Authority
Project Title 20th Street Reconstruction & Safety Improvements
Facility/Street/Highway 20th Street (becomes 18th at western limits)
Limits 20th / 18th & West TC Jester to 20th and just west of Durham Drive
Description Reconstruct and reconfigure 20th to include access management, safety, and pedestrian improvements. Project would endeavor to leverage existing rights-of-way to extent possible but may add in a complete or partial center turn lane. Project includes significant drainage improvements to mitigate area flood events.
Timeframe Medium Term (6-10 Years)
Estimated Cost $39,000,000.00
Memorial Heights Redevelopment Authority - 11th Street Shared Use Path
down-arrow
Project ID 1227
Agency Name Memorial Heights Redevelopment Authority
Project Title 11th Street Shared Use Path
Facility/Street/Highway 11th Street
Limits Nashua St. to Ella Boulevard
Description Construct 12-FT shared use path on the north side of W. 11th to include ADA ramps, high visibility cross-walks and traffic signal improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,274,000.00
Memorial Heights Redevelopment Authority - Washington and Center Reconfiguration
down-arrow
Project ID 1228
Agency Name Memorial Heights Redevelopment Authority
Project Title Washington and Center Reconfiguration
Facility/Street/Highway Washington Avenue, Westcott Street, and Center Street
Limits Washington Avenue from IH-10 to Bagby Street to include Wescott Street and Center Street to include connecting streets and adjacent intersections.
Description Reconstruct and reconfigure Washington, Wescott, and Center to include access management, safety, and bicycle/pedestrian improvements. Improvements to be driven by UPWP-funded planning effort, underway in 2022.
Timeframe Medium Term (6-10 Years)
Estimated Cost $202,500,000.00
Memorial Heights Redevelopment Authority - MHRA Bridge Investment Program
down-arrow
Project ID 1229
Agency Name Memorial Heights Redevelopment Authority
Project Title MHRA Bridge Investment Program
Facility/Street/Highway Ella @ White Oak Bayou 18th/20th @ White Oak Bayou Shepherd Dr @ White Oak Bayou Durham Dr @ White Oak Bayou TC Jester @ White Oak Bayou (adjacent Cranston Ct) TC Jester and White Oak Bayou (adjacent Bryce) 11th @ White Oak Bayou
Limits Bridge structure plus approaches
Description Replace existing bridges to enable appropriate White Oak Bayou stormwater conveyance, enable pedestrian/bicycle access, and improve state of good repair.
Timeframe Long Term (More than 10 Years)
Estimated Cost $63,000,000.00
Midtown Management District - Webster Street Reconfiguration
down-arrow
Project ID 1230
Agency Name Midtown Management District
Project Title Webster Street Reconfiguration
Facility/Street/Highway Webster Street
Limits Matthews Street to Chenevert
Description Reconstruction and reconfiguration of street to accommodate multimodal users and enhance safety and access. Include water, wastewater, and stormwater improvements.
Timeframe Short Term (0-5 Years)
Estimated Cost $25,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Midtown Management District - Tuam Street Safety Improvements
down-arrow
Project ID 1231
Agency Name Midtown Management District
Project Title Tuam Street Safety Improvements
Facility/Street/Highway Tuam Street
Limits Genessee St and Milam St
Description Midtown plans to improve existing conditions of Tuam St. between Genessee and Milam. On-street bicycle sharrow markings will be added to the entire segment, as consistent with the Houston Bike Plan. On the western end of the corridor (Genessee to Bagby) Midtown will install landscaping medians, pedestrian refuge islands, and enhanced signage at key locations to reduce crossing distances and improve safety for bicyclists and pedestrians. On the eastern side of the corridor (Bagby to Milam) Midtown will add bicycle phase signals to the existing signalized intersections. The City of Houston will install a traffic signal at Tuam and Smith in 2023; Midtown is performing a signal warrant study at Tuam and Louisiana with the intention of placing a traffic signal as part of this project.  Additionally, Midtown will improve sidewalks, curb ramps, and additional lighting along the entire segment of Tuam.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,500,000.00
Midtown Management District - Travis Street Reconfiguration
down-arrow
Project ID 1232
Agency Name Midtown Management District
Project Title Travis Street Reconfiguration
Facility/Street/Highway Travis Street
Limits IH-69 to Pierce
Description Reconstruction and reconfiguration of street to accommodate multimodal users and enhance safety and access. Include water, wastewater, and stormwater improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $25,000,000.00
Midtown Management District - Fannin Street Reconfiguration
down-arrow
Project ID 1233
Agency Name Midtown Management District
Project Title Fannin Street Reconfiguration
Facility/Street/Highway Fannin Street
Limits IH-69 to Pierce
Description Reconstruction and reconfiguration of street to accommodate multimodal users and enhance safety and access. Include water, wastewater, and stormwater improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $33,750,000.00
Midtown Management District - Caroline and Wheeler NHHIP Impact Mitigation
down-arrow
Project ID 1234
Agency Name Midtown Management District
Project Title Caroline and Wheeler NHHIP Impact Mitigation
Facility/Street/Highway Caroline @ Wheeler @ IH-69
Limits Caroline @ Wheeler @ IH-69
Description Enable implementation of connectivity, green space, and community connections as associated with NHHIP Project.
Timeframe Long Term (More than 10 Years)
Estimated Cost $75,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Montrose TIRZ 27 Redevelopment Authority - Montrose Boulevard Reconstruction
down-arrow
Project ID 1235
Agency Name Montrose TIRZ 27 Redevelopment Authority
Project Title Montrose Boulevard Reconstruction
Facility/Street/Highway Montrose Boulevard
Limits West Clay to US-59/IH-69
Description Replace all public infrastructure (roadway, utilities, access management, pedestrian realm, transit, bike lane)
Timeframe Short Term (0-5 Years)
Estimated Cost $47,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Regional Goods Movement Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Transit Questionnaire View Questionnaire
Montrose TIRZ 27 Redevelopment Authority - Waugh Drive Bike Lane
down-arrow
Project ID 1236
Agency Name Montrose TIRZ 27 Redevelopment Authority
Project Title Waugh Drive Bike Lane
Facility/Street/Highway Waugh Drive
Limits Allen Parkway to West Dallas Street
Description Remove one travel lane in each direction to install protected on-street bicycle lanes on both side of the roadway. Replace undersized sidewalks on both sides of the roadway where feasible. This project will tie into existing bicycle lanes on Waugh Drive south of West Dallas Street.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,335,000.00
Montrose TIRZ 27 Redevelopment Authority - Montrose Safe Routes to School Connections
down-arrow
Project ID 1237
Agency Name Montrose TIRZ 27 Redevelopment Authority
Project Title Montrose Safe Routes to School Connections
Facility/Street/Highway Various streets near the Wharton Dual Language Academy, Carnegie Vangard High School, and Gregory-Lincoln Education Center
Limits - West Clay Street (Eberhard St to Stanford St) - Columbus Street (West Dallas St to West Gray St) - West Bell Street (Eberhard St to Marconi St) - Marconi Street (W Clay St to W Gray St) - West Pierce Street (Eberhard St to Marconi St) - West Dallas Street (Columbus St to Standford St) - Crocker Street (500-feet north of West Gray St to West Gray St) - Stanford Street (West Dallas St to Fairview St) - West Gray Street (Montrose Blvd to Taft St) - Peden Street (Montrose Blvd to Taft St) - Taft Street (W Gray St to Fairview St) - Bomar Street (Stanford St to Taft St)
Description Improve safety and provide safe routes to neighborhood schools. To include replacing existing sidewalks with six-foot-wide sidewalks to meet current City standards; installation of three regtangular rapid flashing beacons on West Gray Street in crash-prone area.
Timeframe Short Term (0-5 Years)
Estimated Cost $7,000,000.00
Near Northwest Management District - West Little York Phase 2 Project
down-arrow
Project ID 1238
Agency Name Near Northwest Management District
Project Title West Little York Phase 2 Project
Facility/Street/Highway W. Little York Rd / Victory Drive
Limits Chateau Forest Drive to TC Jester Blvd
Description Construct intersection crossing improvements, install six-foot sidewalks, pavement markings, ADA-compliant ramps. Provide universally accessible transit stops and shelters.
Timeframe Short Term (0-5 Years)
Estimated Cost $11,300,000.00
Near Northwest Management District - Alabonson Rd Reconstruction
down-arrow
Project ID 1239
Agency Name Near Northwest Management District
Project Title Alabonson Rd Reconstruction
Facility/Street/Highway Alabonson Rd
Limits Gum Grove Lane to N Houston Rosslyn
Description Reconstruct roadway to include additional capacity for turning movements, full depth rehabilitation of roadway, and provision of shared use path, pavement markings, and ADA-compliant ramps.
Timeframe Short Term (0-5 Years)
Estimated Cost $16,100,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Near Northwest Management District - De Soto Bicycle-Pedestrian Access
down-arrow
Project ID 1240
Agency Name Near Northwest Management District
Project Title De Soto Bicycle-Pedestrian Access
Facility/Street/Highway De Soto St / TC Jester Blvd
Limits Antoine Dr to TC Jester / De Soto St to Holder Forest Dr
Description Construct intersection crossing improvements, install six-foot sidewalks and/or eight-foot wide shared use path improvements, pavement markings, ADA-compliant ramps. Provide universally accessible transit stops and shelters.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,200,000.00
Near Northwest Management District - TC Jester Pinemont Pedestrian-Transit Improvements
down-arrow
Project ID 1241
Agency Name Near Northwest Management District
Project Title TC Jester Pinemont Pedestrian-Transit Improvements
Facility/Street/Highway TC Jester Blvd / Pinemont Dr
Limits W Tidwell to Pinemont / Antoine to TC Jester
Description Construct intersection crossing improvements, install six-foot sidewalks, pavement markings, ADA-compliant ramps. Provide universally accessible transit stops and shelters.
Timeframe Short Term (0-5 Years)
Estimated Cost $2,900,000.00
Near Northwest Management District - Breen Drive Reconstruction
down-arrow
Project ID 1242
Agency Name Near Northwest Management District
Project Title Breen Drive Reconstruction
Facility/Street/Highway Breen Dr
Limits Western District Boundary (Appx. Hollister) to W Montgomery Rd
Description Reconstruct roadway to new section which includes two travel lanes, one continuous center turn later, and six-foot wide sidewalks. Project scope will include stormwater improvements.
Timeframe Medium Term (6-10 Years)
Estimated Cost $23,000,000.00
Southwest Houston Redevelopment Authority (TIRZ 20) - Harwin Dr Reconstruction
down-arrow
Project ID 1243
Agency Name Southwest Houston Redevelopment Authority (TIRZ 20)
Project Title Harwin Dr Reconstruction
Facility/Street/Highway Harwin Dr
Limits S Gessner Rd - Fondren Rd
Description Replace all public infrastructure (road diet, utilities, traffic controls, pedestrian realm)
Timeframe Short Term (0-5 Years)
Estimated Cost $18,200,000.00
Regional Goods Movement Questionnaire View Questionnaire
Upper Kirby Management District (Harris County Improvement District #1) - West Alabama Complete Street
down-arrow
Project ID 1244
Agency Name Upper Kirby Management District (Harris County Improvement District #1)
Project Title West Alabama Complete Street
Facility/Street/Highway West Alabama Street
Limits Buffalo Speedway to Chenevert
Description Reconstruct and reconfigure West Alabama from Buffalo Speedway to Chenevert to include modifying the existing cross-section to include continuous bicycle and pedestrian facilities. Enhance access to transit by connecting to adjacent high capacity routes (University Line & Westheimer). Include stormwater, wastewater, and water improvements. Project is only seeking funding for FTA-eligible infrastructure elements. Total Eligible Cost: $31,000,000
Timeframe Short Term (0-5 Years)
Estimated Cost $31,000,000.00
Uptown Houston District - West Loop Shared Use Path and Bayou Bridge
down-arrow
Project ID 1245
Agency Name Uptown Houston District
Project Title West Loop Shared Use Path and Bayou Bridge
Facility/Street/Highway Woodway Dr / LP 610
Limits Woodway Dr @ LP 610 to Post Oak Boulevard @ LP 610
Description Provide multimodal shared use path connection from Woodway Drive to Post Oak Boulevard. Includes new bridge crossing at Buffalo Bayou.
Timeframe Short Term (0-5 Years)
Estimated Cost $17,000,000.00
Westchase Management District - Meadowglen West Complete Streets
down-arrow
Project ID 1246
Agency Name Westchase Management District
Project Title Meadowglen West Complete Streets
Facility/Street/Highway Meadowglen Ln
Limits Woodland Park Dr to Rogerdale Rd
Description Repurpose road as a complete street through complete rehabilitation. Final product will include pedestrian-transit and bicycle amenities. Safety improvements incorporated through bulbouts and intersection improvements. Only funding for FTA-eligible items is sought. Total eligible project cost: $10,000,000
Timeframe Short Term (0-5 Years)
Estimated Cost $10,000,000.00
North Houston District - Wayforest to Seminar Safety & Access Improvements (Cancelled)
down-arrow
Project ID 1247
Agency Name North Houston District
Project Title Wayforest to Seminar Safety & Access Improvements (Cancelled)
Facility/Street/Highway Wayforest Drive
Limits Regional Park Drive to Seminar Drive
Description Multi-use sidepath to be a minimum of 10’ wide on the east side of the corridor from Regional Park Drive to Seminar Drive and improve intersections to be ADA compliant with curb cuts and crossing signage and striping where appropriate. Improve curb cuts and pedestrian refuges at Wayforest Drive @ Greens Road intersection to be ADA compliant, restripe with high visibility crosswalks, and improve pedestrian signal timing.
Timeframe Short Term (0-5 Years)
Estimated Cost $775,500.00
PORT OF HOUSTON AUTHORITY/TxDOT Beaumont District - IH 10 E Widening
down-arrow
Project ID 1249
Agency Name PORT OF HOUSTON AUTHORITY/TxDOT Beaumont District
Project Title IH 10 E Widening
Facility/Street/Highway IH 10 E
Limits HARRIS C/L TO SH 99
Description RECONSTRUCT AND WIDEN FROM 8 TO 12 LANE (ADD 4 MANAGED LANES) - Safety, operational and mobility improvements to IH 10 E mainlanes and frontage roads, based on results of the IH 10 East PEL study
Timeframe Long Term (More than 10 Years)
Estimated Cost $200,000,000.00
Harris County Engineering - East Richey Rd Improvement Project
down-arrow
Project ID 1252
Agency Name Harris County Engineering
Project Title East Richey Rd Improvement Project
Facility/Street/Highway E Richey Road
Limits I45 NBFR to Grovedale Rd
Description Safety improvements, access management, driveways, sidewalks and improved street geometry.
Timeframe Short Term (0-5 Years)
Estimated Cost $6,100,000.00
Regional Goods Movement Questionnaire View Questionnaire
Montgomery County Precinct 4 - Gene Campbell Boulevard
down-arrow
Project ID 1256
Agency Name Montgomery County Precinct 4
Project Title Gene Campbell Boulevard
Facility/Street/Highway Gene Campbell Boulevard
Limits FM 1314 to FM 1485
Description Reconstruct 2-lane asphalt roadway with open ditches to a 4-lane asphalt roadway with open ditches and a center turn lane.
Timeframe Short Term (0-5 Years)
Estimated Cost $35,712,720.00
Regional Goods Movement Questionnaire View Questionnaire
Greater Southeast Management District - Cleburne Street Cap and NHHIP Impact Mitigation
down-arrow
Project ID 1263
Agency Name Greater Southeast Management District
Project Title Cleburne Street Cap and NHHIP Impact Mitigation
Facility/Street/Highway Cleburne Street at IH-69, Almeda Road at IH-69, Alabama St at IH-45
Limits Cleburne St. at IH-69, Almeda Road at IH-69, Alabama St. at IH-45, Elgin at IH-45, Tuam at IH-45, McGowen at IH-45
Description Enable implementation of connectivity, green space, and community connections as associated with NHHIP Project.
Timeframe Short Term (0-5 Years)
Estimated Cost $50,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Memorial Heights Redevelopment Authority - Waugh Shared Use Path and Jackson Hill Bike/Ped Bridge Replacement
down-arrow
Project ID 1264
Agency Name Memorial Heights Redevelopment Authority
Project Title Waugh Shared Use Path and Jackson Hill Bike/Ped Bridge Replacement
Facility/Street/Highway Memorial/Waugh Cloverleaf and Jackson Hill Street
Limits Feagan Street to Jackson Hill/Cleveland Park to Buffalo Bayou Hike and Bike Trail
Description A 12' shared use path along the Waugh/Memorial cloverleaf to Jackson Hill Street and Cleveland Park. Project includes the replacement of the Jackson Hill bridge over Memorial Drive. In total, the project is slightly more than a half-mile.
Timeframe Short Term (0-5 Years)
Estimated Cost $5,000,000.00
METRO - Test Project
down-arrow
Project ID 1265
Agency Name METRO
Project Title Test Project
Facility/Street/Highway VA
Limits Within defined zone
Description Shuttle service within selected communities that lack convenient access to transit $12 million/annually ($4 million/annually each)
Timeframe Short Term (0-5 Years)
Estimated Cost $60,000,000.00
TxDOT Houston District - Test Project
down-arrow
Project ID 1266
Agency Name TxDOT Houston District
Project Title Test Project
Facility/Street/Highway 36A
Limits From IH 10 W to US 290 /SH 6 near Hempstead
Description Preliminary engineering study in preparation for a possible DEIS
Timeframe Medium Term (6-10 Years)
Estimated Cost $7,500,000.00
Fort Bend County Public Transportation - Test Project
down-arrow
Project ID 1267
Agency Name Fort Bend County Public Transportation
Project Title Test Project
Facility/Street/Highway 3737 Bamore Rd Rosenberg, TX
Limits
Description Bus support equipment and facilities, transit software, hardware and bus wraps FY2020.
Timeframe Short Term (0-5 Years)
Estimated Cost $1,281,000.00
METRO - Replacement Buses FY '23
down-arrow
Project ID 1268
Agency Name METRO
Project Title Replacement Buses FY '23
Facility/Street/Highway METRO Service Area
Limits METRO Service Area
Description Replace 160 2008-2009 Diesel Hybrid Buses with new Diesel Buses
Timeframe 1 - Short Term (0-5 Years)
Estimated Cost $115,080,000.00
City of Sugar Land - Ditch H Trail - Sugar Land Trail Phase 1 and 2
down-arrow
Project ID 1270
Agency Name City of Sugar Land
Project Title Ditch H Trail - Sugar Land Trail Phase 1 and 2
Facility/Street/Highway
Limits
Description
Timeframe
Estimated Cost $0.00
City of Houston - West Belt Railroad Grade Separations
down-arrow
Project ID 1271
Agency Name City of Houston
Project Title West Belt Railroad Grade Separations
Facility/Street/Highway
Limits
Description
Timeframe
Estimated Cost $0.00
City of Missouri City - Installation of new Mast Arm Traffic Signal
down-arrow
Project ID 1272
Agency Name City of Missouri City
Project Title Installation of new Mast Arm Traffic Signal
Facility/Street/Highway
Limits
Description
Timeframe
Estimated Cost $0.00
The Woodlands Township - SH 242 Pathway
down-arrow
Project ID 1273
Agency Name The Woodlands Township
Project Title SH 242 Pathway
Facility/Street/Highway
Limits
Description
Timeframe
Estimated Cost $0.00
City of Houston - Broadway St from IH-45 to SH-225 (Paving & Drainage)
down-arrow
Project ID 1289
Agency Name City of Houston
Project Title Broadway St from IH-45 to SH-225 (Paving & Drainage)
Facility/Street/Highway Broadway St
Limits IH-45 to SH-225
Description Total roadway reconstruction to include shared paths, intersection & accessibility improvements, railroad safety improvements, upgraded Hawk signals for safer schoool crossings, drainage improvements, traffic signal & street lighting upgrades, access management & roadway reconfiguration with wider median to accommodate future Metro LRT
Timeframe Short Term (0-5 Years)
Estimated Cost $45,000,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
Montgomery County - FM 1486 Widening
down-arrow
Project ID 1303
Agency Name Montgomery County
Project Title FM 1486 Widening
Facility/Street/Highway FM 1486
Limits FM 1774 to SH 105
Description Expand FM 1486 from 2-lanes to 4-lane divided
Timeframe Short Term (0-5 Years)
Estimated Cost $240,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - FM 149 Extension
down-arrow
Project ID 1304
Agency Name Montgomery County
Project Title FM 149 Extension
Facility/Street/Highway FM 149-A
Limits FM 149 to SH 249 Toll Road
Description Extend FM 149 from the UPRR (FM 149) to the SH 249 Toll Road. Includes railroad grade separation
Timeframe Short Term (0-5 Years)
Estimated Cost $140,000,000.00
Montgomery County - FM 149 Widening - South
down-arrow
Project ID 1305
Agency Name Montgomery County
Project Title FM 149 Widening - South
Facility/Street/Highway FM 149
Limits FM 1774 to Jackson Rd
Description Expand FM 149 from 2-lanes to 4-lane divided. Includes railroad grade separation
Timeframe Short Term (0-5 Years)
Estimated Cost $150,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - FM 149 Widening - North
down-arrow
Project ID 1306
Agency Name Montgomery County
Project Title FM 149 Widening - North
Facility/Street/Highway FM 149
Limits Jackson Rd to SH 105
Description Expand FM 149 from 2-lanes to 4-lane divided. Includes railroad grade separation
Timeframe Short Term (0-5 Years)
Estimated Cost $160,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - I-45 Ramp Improvements
down-arrow
Project ID 1307
Agency Name Montgomery County
Project Title I-45 Ramp Improvements
Facility/Street/Highway IH 45
Limits SH 99 to Woodlands Parkway
Description Construct braided ramps at the Hardy Toll Interchange. Modify ramps between SH 99 and Woodlands Parkway. Add auxilliary lanes
Timeframe Short Term (0-5 Years)
Estimated Cost $150,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - Keenan Cutoff Extension
down-arrow
Project ID 1308
Agency Name Montgomery County
Project Title Keenan Cutoff Extension
Facility/Street/Highway Keenan Cutoff Rd
Limits SH 249 Toll Road to FM 149
Description Extend Keenan Cutoff Rd from FM 149 to the SH 249 Toll Road. Includes two railroad grade separations and a new crossing of Lake Creek
Timeframe Medium Term (6-10 Years)
Estimated Cost $230,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - SH 99 Eastbound Frontage Road Improvements
down-arrow
Project ID 1309
Agency Name Montgomery County
Project Title SH 99 Eastbound Frontage Road Improvements
Facility/Street/Highway SH 99 Eastbound Frontage Road
Limits Rayford to east of Birnam Woods
Description Add frontage road lanes (one-lane to two-lane) and add right turn lanes
Timeframe
Estimated Cost $3,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Montgomery County - FM 2090 Expansion
down-arrow
Project ID 1310
Agency Name Montgomery County
Project Title FM 2090 Expansion
Facility/Street/Highway FM 2090
Limits FM 3083 to I 69
Description Expand FM 2090 from 2-lanes to 4-lane divided. Re-alignment to meet current criteria
Timeframe Medium Term (6-10 Years)
Estimated Cost $280,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - FM 1097 Realignment
down-arrow
Project ID 1311
Agency Name Montgomery County
Project Title FM 1097 Realignment
Facility/Street/Highway FM 1097
Limits Bentwater to FM 149
Description Expand from 2-lanes to 4-lane divided. Realign roadway to meet FM 1097 west of FM 149
Timeframe Medium Term (6-10 Years)
Estimated Cost $170,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - FM 2854 Expansion
down-arrow
Project ID 1312
Agency Name Montgomery County
Project Title FM 2854 Expansion
Facility/Street/Highway FM 2854
Limits Loop 336 to SH 105
Description Expand from 2-lanes to 4-lane divided.
Timeframe Medium Term (6-10 Years)
Estimated Cost $390,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - FM 2432 Expansion
down-arrow
Project ID 1313
Agency Name Montgomery County
Project Title FM 2432 Expansion
Facility/Street/Highway FM 2432
Limits SH 75 to FM 1484
Description Expand from 2-lanes to 4-lane divided. Includes Railroad grade separation
Timeframe Medium Term (6-10 Years)
Estimated Cost $150,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - FM 1485 Expansion
down-arrow
Project ID 1314
Agency Name Montgomery County
Project Title FM 1485 Expansion
Facility/Street/Highway FM 1485
Limits Lp 494 to SH 99
Description Expand from 2-lanes to 4-lane divided.
Timeframe Medium Term (6-10 Years)
Estimated Cost $95,000,000.00
Major Projects Questionnaire View Questionnaire
Montgomery County - SH 99 Ramp Improvements
down-arrow
Project ID 1315
Agency Name Montgomery County
Project Title SH 99 Ramp Improvements
Facility/Street/Highway SH 99
Limits At Valley Ranch Pkwy
Description Add WB off ramp and an EB on ramp
Timeframe Medium Term (6-10 Years)
Estimated Cost $12,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
TxDOT Houston District - FM 1485 AMS Phase 1 of 3
down-arrow
Project ID 1316
Agency Name TxDOT Houston District
Project Title FM 1485 AMS Phase 1 of 3
Facility/Street/Highway FM 1485
Limits From SL 494 to SH 242
Description FM 1485 Access Management Study Short Term Recommendations Implementation (Phase 1)
Timeframe Short Term (0-5 Years)
Estimated Cost $5,688,003.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1485 AMS Phase 2 of 3
down-arrow
Project ID 1317
Agency Name TxDOT Houston District
Project Title FM 1485 AMS Phase 2 of 3
Facility/Street/Highway FM 1485
Limits From SL 494 to SH 242
Description FM 1485 Access Management Study Medium Term Recommendations Implementation (Phase 2)
Timeframe Medium Term (6-10 Years)
Estimated Cost $6,129,385.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1485 AMS Phase 3 of 3
down-arrow
Project ID 1318
Agency Name TxDOT Houston District
Project Title FM 1485 AMS Phase 3 of 3
Facility/Street/Highway FM 1485
Limits From SL 494 to SH 242
Description FM 1485 Access Management Study Long Term Recommendations Implementation (Phase 3)
Timeframe Long Term (More than 10 Years)
Estimated Cost $24,789,388.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1314 AMS Phase 1 of 3
down-arrow
Project ID 1319
Agency Name TxDOT Houston District
Project Title FM 1314 AMS Phase 1 of 3
Facility/Street/Highway FM 1314
Limits From SL 494 to SH 242
Description FM 1314 Access Management Study Short Term Recommendations Implementation (Phase 1)
Timeframe Short Term (0-5 Years)
Estimated Cost $3,340,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1314 AMS Phase 2 of 3
down-arrow
Project ID 1320
Agency Name TxDOT Houston District
Project Title FM 1314 AMS Phase 2 of 3
Facility/Street/Highway FM 1314
Limits From SL 494 to SH 242
Description FM 1314 Access Management Study Medium Term Recommendations Implementation (Phase 2)
Timeframe Medium Term (6-10 Years)
Estimated Cost $5,700,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
TxDOT Houston District - FM 1314 AMS Phase 3 of 3
down-arrow
Project ID 1321
Agency Name TxDOT Houston District
Project Title FM 1314 AMS Phase 3 of 3
Facility/Street/Highway FM 1314
Limits From SL 494 to SH 242
Description FM 1314 Access Management Study Long Term Recommendations Implementation (Phase 3)
Timeframe Long Term (More than 10 Years)
Estimated Cost $87,560,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Harris County Engineering - Sheldon Road (South) Reconstruction Project
down-arrow
Project ID 1322
Agency Name Harris County Engineering
Project Title Sheldon Road (South) Reconstruction Project
Facility/Street/Highway Sheldon Road - Resilience
Limits Wallisville Rd to Jacintoport Blvd
Description Reconstruct and widen, reconstructing and widening the existing two-lane road with a concrete overlay and asphalt surface to create a four-lane roadway made of reinforced 12-inch concrete. The project encompasses a bridge section, two major thoroughfare intersections, multiple entrances for industrial and commercial businesses, drainage enhancements, sidewalk installation, and landscaping. These improvements will alleviate congestion, enhance safety in the area, improve pedestrian accessibility, address drainage issues, and optimize the transportation system's resilience during severe weather events.
Timeframe Short Term (0-5 Years)
Estimated Cost $50,000,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
Harris County Engineering - Barker Cypress Road Capacity and Safety Improvements
down-arrow
Project ID 1323
Agency Name Harris County Engineering
Project Title Barker Cypress Road Capacity and Safety Improvements
Facility/Street/Highway Barker Cypress Road - HGAN
Limits From: Queenston BlvdTo: North of US 290
Description The proposed project, which is primarily in existing right of way, widens Barker Cypress Road from four to six lanes, converting it from a four-lane asphalt section with open ditch drainage to a six-lane concrete urban section with curb-and-gutter including added sidewalks; the project includes reconstruction of the bridge over the railroad and intersection improvements along Barker Cypress Road at Queenston Boulevard, US 290 eastbound and westbound frontage roads. The improvements will reduce congestion, increase safety in the area, improve pedestrian accommodations, improve drainage due to modernizing the roadway to include curbs and gutters, reduce vehicular emissions attributable to severe traffic congestion, and decrease the travel delays for the Barker Cypress Corridor.
Timeframe Short Term (0-5 Years)
Estimated Cost $60,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Harris County Engineering - Sweetwater Lane Reconstruction Project
down-arrow
Project ID 1324
Agency Name Harris County Engineering
Project Title Sweetwater Lane Reconstruction Project
Facility/Street/Highway Sweetwater Lane
Limits West Mount Houston to West Canino Road
Description Reconstruct Sweetwater Lane into a curb and gutter concrete roadway, including construction of new sidewalks, streetlights, in-line drainage, traffic signals, widen bridge over Halls Bayou, and other access management improvements to improve safety and connectivity.
Timeframe Short Term (0-5 Years)
Estimated Cost $30,000,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
Harris County Engineering - Harris County Precinct 1 Traffic Signal Intersection Improvement Project
down-arrow
Project ID 1325
Agency Name Harris County Engineering
Project Title Harris County Precinct 1 Traffic Signal Intersection Improvement Project
Facility/Street/Highway Various
Limits Nineteen (19) intersection locations (See "PCT1 Traffic Signal Intersectio" Tab)
Description The proposed project focuses on critical traffic signal and intersection improvements in Precinct 1 at 19 intersection locations. The project will improve signal operations, safety and connectivity, and will reduce traffic congestion and vehicular emissions.
Timeframe Short Term (0-5 Years)
Estimated Cost $12,350,000.00
Operational Improvements and Congestion Management Questionnaire View Questionnaire
City of Webster - Flyway Drive Extension
down-arrow
Project ID 1326
Agency Name City of Webster
Project Title Flyway Drive Extension
Facility/Street/Highway Flyway Drive
Limits Project limits extend from the eastern termination of Flyway Drive, eastward, across the CenterPoint corridor and ExxonMobil property, just north of Clear Creek, to terminate at SH3.
Description Approximately 3,400 LF of two-lane concrete pavement provides an alternate east-west route between SH3 and IH45, between FM518 and NASA Parkway. The Flyway Drive extension is instrumental to tourism support and economic competiveness, enhancing accessibility to a major hotel (Great Wolf Lodge), entertainment hub (Flyway), and adjacent commerce (Axiom Space, American Furniture Warehouse, Academy, Top Golf, and other retail and restaurant development).
Timeframe Short Term (0-5 Years)
Estimated Cost $2,500,000.00
Houston Airport System - Ellington Road Extension
down-arrow
Project ID 1327
Agency Name Houston Airport System
Project Title Ellington Road Extension
Facility/Street/Highway State Highway, Enterprise Shuttle Street and Space Center Blvd.
Limits State Highway 3 to Enterprise Shuttle Street and Space Center Blvd.
Description Improved roadway access and utility infrastructure connectivity to the Houston Spaceport
Timeframe Short Term (0-5 Years)
Estimated Cost $45,000,000.00
Fort Bend County - E Dallas St Widening
down-arrow
Project ID 1328
Agency Name Fort Bend County
Project Title E Dallas St Widening
Facility/Street/Highway E Dallas Street
Limits FM 521 to county line
Description Widening of existing 2-lane undivided asphalt roadway to 4-lane divided concrete Blvd. with roadside ditches and storm sewer.
Timeframe Medium Term (6-10 Years)
Estimated Cost $14,200,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Fort Bend County - SH 99 Frontage Rd (20301)
down-arrow
Project ID 1329
Agency Name Fort Bend County
Project Title SH 99 Frontage Rd (20301)
Facility/Street/Highway SH 99
Limits SB Cinco Ranch Blvd to Bay Hill
Description Construction of a two lane concrete curb and gutter frontage road and SH 99 Ram reversal.
Timeframe Short Term (0-5 Years)
Estimated Cost $8,600,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Brazoria County - CR 59 widening
down-arrow
Project ID 1330
Agency Name Brazoria County
Project Title CR 59 widening
Facility/Street/Highway County Road 59
Limits from the Fort Bend County Line to CR 48
Description Widening existing 2-lane asphalt roadway to a 4-lane concrete Blvd. with roadside ditches, storm sewer and a detention pond.
Timeframe Medium Term (6-10 Years)
Estimated Cost $20,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Harris County Transit Services - Sidewalk and Pedestrian Access
down-arrow
Project ID 1331
Agency Name Harris County Transit Services
Project Title Sidewalk and Pedestrian Access
Facility/Street/Highway Unincorporated Harris County
Limits Unincorporated Harris County
Description Harris County Transit Services is will be installing sidewalks in unincorporated Harris County. Particularly, we will be focusing on areas where existing bus routes exist.
Timeframe Short Term (0-5 Years)
Estimated Cost $4,000,000.00
Galveston Wharves - 145 Direct Connect Engineering
down-arrow
Project ID 1332
Agency Name Galveston Wharves
Project Title 145 Direct Connect Engineering
Facility/Street/Highway I45 at Harborside to Harboside at Port
Limits
Description Engineering for I45 Direct Connect, project funded for preengineering already
Timeframe Medium Term (6-10 Years)
Estimated Cost $13,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Major Projects Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Galveston Wharves - OPI 41st-51st Engineering
down-arrow
Project ID 1333
Agency Name Galveston Wharves
Project Title OPI 41st-51st Engineering
Facility/Street/Highway Old Port Industrial Road 41st- 51st
Limits
Description Enginerring for OPI 41st-51st, project funded for preengineering already
Timeframe Medium Term (6-10 Years)
Estimated Cost $3,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Major Projects Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
Galveston Wharves - Wayfinding
down-arrow
Project ID 1334
Agency Name Galveston Wharves
Project Title Wayfinding
Facility/Street/Highway Port wide
Limits
Description Port wide design and construction signage consistent across port
Timeframe Short Term (0-5 Years)
Estimated Cost $1,600,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Galveston Wharves - Parking to Terminal 25 Overhead walkway
down-arrow
Project ID 1335
Agency Name Galveston Wharves
Project Title Parking to Terminal 25 Overhead walkway
Facility/Street/Highway
Limits
Description Construct pedestrian overhead walkway to go fro terminal 25 to parking lots A, B, C, D
Timeframe Medium Term (6-10 Years)
Estimated Cost $4,000,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Galveston Wharves - Intersection Harborside and 37th improvments
down-arrow
Project ID 1336
Agency Name Galveston Wharves
Project Title Intersection Harborside and 37th improvments
Facility/Street/Highway State High275 at 37th street
Limits
Description Intersection Harborside and 37th street traffic light and rail track improvments
Timeframe Short Term (0-5 Years)
Estimated Cost $2,500,000.00
High Growth Area Needs Questionnaire View Questionnaire
Operational Improvements and Congestion Management Questionnaire View Questionnaire
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Bellaire - Reconstruction of Chimney Rock Rd
down-arrow
Project ID 1337
Agency Name City of Bellaire
Project Title Reconstruction of Chimney Rock Rd
Facility/Street/Highway Chimney Rock Road
Limits Evergreen to Maple
Description The Chimney Rock Rd reconstruction project includes roadway and intersection improvements for enhanced mobility as well as storm drainage improvements to provide for increased access before, during, and after major events as well as improve regional flood resilience
Timeframe Medium Term (6-10 Years)
Estimated Cost $9,300,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Bellaire - Reconstruction of Newcastle Drive
down-arrow
Project ID 1338
Agency Name City of Bellaire
Project Title Reconstruction of Newcastle Drive
Facility/Street/Highway Newcastle Drive
Limits Glenmont to Cypress Ditch Bridge
Description The Newcastle Dr reconstruction project includes roadway and intersection improvements for enhanced mobility as well as storm drainage improvements to provide for increased access before, during, and after major events as well as improve regional flood resilience
Timeframe Medium Term (6-10 Years)
Estimated Cost $19,200,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
City of Bellaire - Reconstruction of S. Rice Ave
down-arrow
Project ID 1339
Agency Name City of Bellaire
Project Title Reconstruction of S. Rice Ave
Facility/Street/Highway South Rice Avenue
Limits Elm to Cypress Ditch Bridge
Description The S Rice Ave reconstruction project includes roadway and intersection improvements for enhanced mobility as well as storm drainage improvements to provide for increased access before, during, and after major events as well as improve regional flood resilience
Timeframe Medium Term (6-10 Years)
Estimated Cost $28,800,000.00
Resiliency and State of Good Repair Questionnaire View Questionnaire
Test Agency - Pearland Parkway extension
down-arrow
Project ID 1340
Agency Name Test Agency
Project Title Pearland Parkway extension
Facility/Street/Highway Pearland Parkway
Limits from Dixie Farm to FM 2351
Description Extend Pearland Parkway from Dixie Farm Road to FM 2351 (as a four-lane, median divided roadway) to improve mobility within Brazoria County and provide an additional north/south route parallel to SH 35 to reduce congestion.
Timeframe Medium Term (6-10 Years)
Estimated Cost $35,000,000.00
Test Agency - CR 100 extension
down-arrow
Project ID 1341
Agency Name Test Agency
Project Title CR 100 extension
Facility/Street/Highway County Road 100
Limits from CR 113 to SH 35
Description Construct 2-lane roadway and 2-lane grade separation crossing at existing railroad.
Timeframe Medium Term (6-10 Years)
Estimated Cost $16,600,000.00
Test Agency - CR 64 widening (both east and west – but east is mostly City) - Medium Term
down-arrow
Project ID 1342
Agency Name Test Agency
Project Title CR 64 widening (both east and west – but east is mostly City) - Medium Term
Facility/Street/Highway County Road 64
Limits from SH 288 to CR 65
Description Construct 10-foot shoulders along CR 64 from SH 288 to CR 65 to offset fixed objects from the travel way.
Timeframe Medium Term (6-10 Years)
Estimated Cost $2,976,000.00
H-GAC - Kirby Drive Extension
down-arrow
Project ID 1343
Agency Name H-GAC
Project Title Kirby Drive Extension
Facility/Street/Highway Street
Limits Holmes Rd. to Sam Houston Tollway South
Description Proposed Kirby Dr. is a multimodal thoroughfare consisiting of 3 segments: Segment 1 - construct a 4-lane from Holmes Rd. to Airport Blvd. with grade separation at Almeda Rd., Segment 2 - construct a bridge crossing Sims Bayou connecting to W. Orem Dr., Segment 3 - construct a 4-lane from Nichol Woods Dr. to Sam Houston Tollway South. Kirby Dr. is designated as a transit corridor from Fannin terminus at Feldman St. (west of Almeda Rd) to Airport Blvd.
Timeframe Medium Term (6-10 Years)
Estimated Cost $110,000,000.00