Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Tina Liu

Project Manager

713-274-3650

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

Harris County

Tina Liu

Project Manager

713-274-3650

[email protected]

1001 Preston St.

Houston

TX

77002

Additional Agency Information

TxDOT

Quincy Allen

District Engineer

713-802-5000

[email protected]

7600 Washington Avenue

Houston

TX

77007

Project Information

Fry Road/Cypress Rose Hill Road ITS Infrastructure Project

Harris County

Fry Road/Cypress Rose Hill Road

Clay Road to Louetta Road/Huffmeister Road

Northwest/West Harris County is experience increased development and population growth due to the region's vibrant economy. Increasing traffic as a result of this growth is causing degradation to the traffic operations on Harris County roadways. Harris County has identified Fry Road (from Clay Road to Huffmeister Road) as a heavily traveled arterial that would substantially benefit from a combination of traffic signal modernization, fiber optic interconnect network and real time traffic monitoring.

The proposed improvement will be the installation of ITS infrastructure along the Fry Road/Cypress Rose Hill Road Corridor, from Clay Road to Louetta Road/Huffmeister Road.

The proposed improvements along the corridor will enhance efforts to reduce motorist delay, congestion and improve air quality. The installation of ITS infrastructure along the corridor provide intersection capacity improvements, remote monitoring and adjustment of signal operation and synchornization. Real time monitoring system will provide the public with average speed and travel time of vehicles along roadway sections. Also, collected data will be instrumental in the ability to develop ongoing transportation performance measures.

No

No

Less than $100 million

(Manage) ITS Infrastructure

4000000

Authorization for 2018 TIP.pdf

Project Development/Readiness

Not Started

None of the Above

01/01/2021

No

No

No

Yes

No

No

Yes

TxDOT Letter of Support.PDF

Project is for the installation of ITS infrastructure along a major arterial where ROW acquisition and Environmental Assessment/ Categorical Exclusion is not anticipated. Therefore, the project is anticipated to be ready for let once design is completed, approximately 10 months from HGAC approval of the the project.

Map/Location

FryRd_TraffisSignals_181024 (2).zip

Project Budget

HGAC Budget_Fry Road.xlsx

No

Benefit/Cost Analysis

Roadway-Safety-Benefits-Template.xlsx

1031201891129AM.xlsx

Roadway-Emissions-Benefits-Template.xlsx

Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)

0.01 – 0.10

lottr-estimation-template.xlsx

Planning Factors - Incident/Event Management

Yes

CCTV cameras will be installed at major intersections. With the addition of the fiber optic communications network, the cameras will be integrated into TranStar's CTMS and be utilized by TranStar operators for incident management and surveillance.

Yes

The project crosses US 290.

Yes

Intersections will be equipped with a real time monitoring device. With the addition of the fiber optic communications network, the real time monitoring device will be integrated into TranStar's CTMS and be able to provide extensive information of value to motorists (e.g. speed maps, travel times, etc.) and traffic management operators.

Yes

While no plans are currently in place to implement EVP systems, Harris County has allowed Emergency Service Districts to implement a GPS-based EVP system on County maintained roadways with adherence to Harris County system requirements.

No

Planning Factors - Includes Life Cycle Maintenance Plan

Yes

Life Cycle Maintenance Plan.docx

Planning Factors - Interagency Coordination/Continuity of Operations

Yes

CCTV cameras will be installed at major intersections. With the addition of the fiber optic communications network, the cameras can be interconnected into TranStar's CTMS to provide real time monitoring.

Yes

CCTV cameras will be installed at major intersections. With the addition of the fiber optic communications network and advance transportation management system, operators will be able to identify and respond to outages or signal malfunction quicker, minimizing disruption.

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Principal Arterial

No

No

No

Yes