Primary Agency Information
Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.
City of Houston -Houston Public Works
Maureen Crocker
Assistant Director
832-395-3222
611 Walker
Houston
TX
77002
Additional Agency Information
301 Jackson St., 4th Floor, Richmond, TX 77469
Richmond
TX
77469
Project Information
West Fuqua Street
Harris County
West Fuqua Street
City Limits to Chimney Rock Road
Summary of Problems: • Need for intersection improvements and turn lane storage • Need for safe pedestrian crossings and wider sidewalks • Need for signalized intersection The existing concrete pavement is in fair condition; however there are damaged curbs and failing panels throughout the corridor. The pedestrian facilities, including ramps, sidewalks, and bus shelters, are generally in poor condition. Sidewalks are cracked, broken, and uneven creating a safety issue. The need for safe pedestrian crossings and wider sidewalks for neighboring schools (Briargate Elementary, Southern Preparatory Academy, and Hunter Glen Elementary) and public library (Stimley Blue Ridge library) that feed into the corridor. Street and Traffic needs identification was evaluated based on the physical condition and capacity of the roadway. The pavement is over 40 years old and shows wide cracks, failure at joints, and numerous asphalt patches. Pedestrian mobility and safety are lacking with sidewalks in poor condition and lack of wheelchair ramps at cross streets and ADA compliance.
Proposed Improvements include: • New traffic signal at Ridgecreek and stop sign at Ridgerock. • Turning bays at median openings and turn lanes at new signalized intersections • Relocate and improve Metro Bus Stops along the corridor to optimize traffic operations. • Implement access management/driveway spacing to minimize conflicts and improve access to various developments along the corridor. • Reconstruction of roadway with new pavement and lane width standard
-Improve pedestrian safety with wider sidewalks and ADA compliant ramps/crosswalks. -Improve intersection safety and throughput with turn lanes, new signals and median turn lanes. -Improve pavement condition and ride quality Improve water and wastewater utilities. -Improve storm drainage to convey design and extreme event. Project will replace the street that is beyond repair and normal maintenance and also bring to current lane width standard. The project will also upgrade existing underground water, wastewater, and storm utilities.
No
No
Less than $100 million
(Maintain) Roadway/Freight Rehabilitation/Reconstruction
13806000
Project Development/Readiness
30% PS&E
Categorical Exclusion (CE)
03/27/2020
No
No
No
Yes
No
No
No
City of Houston conducted a pre-engineering study on this corridor. The project is currently in design. See attached report.
Map/Location
Benefit/Cost Analysis
Roadway-Safety-Benefits- Fuqua.xlsx
Roadway-Emissions-Benefits- Fuqua.xlsx
Fuqua Road is being submitted under the Rehab/Reconstruction category. The project improvement will provide benefit by install pedestrian crosswalks, turn lanes at intersections and turn bays in medians, new traffic signal, and stop sign.
Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings
Yes
901 - 1000
No
Planning Factors - Environmental Justice
Yes
Yes
Planning Factors - Resiliency/Flood Mitigation Strategies
Yes
The reconstruction of W. Fuqua will included upgraded storm sewer system that will reduce street ponding during heavy storm events; maintaining mobility for transit, and area residents. Fuqua also is a direct connector to Beltway 8 and Fort Bend Toll Road which is an evacution connector, and major roadway on the freight system network.
Planning Factors - Improves Multimodal LOS
No
Yes
Yes
Project will improve pedestrian LOS with wider and safer sidewalks by replacing broken/uneven sidewalks and installing ADA compliant ramps and crosswalks. Transit LOS will be improved with new roadway surface and improved drainage system to reduce street ponding.
Planning Factors - Planning Coordination
Yes
City of Houston Major Thoroughfare and Freeway Plan
https://www.houstontx.gov/planning/transportation/MTFP.html
Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route
Collector
No
No
No
Yes