Who is Completing the Application?
Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.
Maureen Crocker
Assistant Director
832-395-3222
Primary Agency Information
Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.
City of Houston -Houston Public Works
Maureen Crocker
Assistant Director
832-395-3222
611 Walker
Houston
TX
77002
Additional Agency Information
Project Information
Broadway
Harris County
Broadway
I-45 to SH3
The current roadway is a 4-lane roadway with a mix of continuous left turn lanes and medians. There are no turn lanes in the median area or at signalized intersections. The area has multiple schools along the corridor with community centers and a library. However, there are only 4ft sidewalks, no ADA compliant ramps or crossings, and no bicycle facility. There is also a mix of on-street and head-in parking that is encroaching into the right-of-way and posing safety concerns.
The proposed reconstruction will upgrade the 1.7 mile section with new pavement to current lane width standard, a wide median throughout the corridor with left-turn bays as needed, improved intersections and safety medians at the railroad crossing to prevent going around gates. Intersection safety improvements include ADA compliant ramps and crosswalks. A wider sidewalk will be constructed along the length of the corridor to provide safer and easier accessibility to the schools, library and community center. A buffered bicycle facility will be added back of curb to provide bicycle connections per the Houston Bike Plan. Parking along the corridor will be relocated to adjacent streets to remove safety concerns. Bus stop locations will be analyzed for relocation to improve roadway operations. The overall project will also reconfigure the roadway with a wide median creating a boulevard feel and allowing for future expansion to occur without disruption to adjacent parcels.
- Upgraded intersection with turn bays, median improvement and access management will provide improved LOS and intersection operations. - Improved pedestrian realm, crosswalks, and new bicycle facility providing connectivity to adjacent bicycle routes, will enhance multimodal operations and improve overall safety. Will also provide safer pedestrian mobility for adjacent Milby High School, Deady Middle School, Raul Yzaguirre School, - Bus stop relocation and intersection improvements will provide improved transit service operations and travel time reliability. - Improve storm drainage to convey design and extreme event and upsize drainage to current standards - Reconstruction of roadway will provide new service life to roadway, better pavement condition, and reconfiguration of the roadway will allow for future expansion in the median space.
No
No
Less than $100 million
(Expand) Roadway Added Capacity/New Construction/Complete Streets
14672095
Project Development/Readiness
60% PS&E
Categorical Exclusion (CE)
01/22/2021
No
No
Yes
No
No
No
No
City of Houston conducted a pre-engineering study for the roadway with updated technical report after public comments/inputs. Attachments include pre-engineering report, technical update, and current cross-section from design engineer. Broadway is part of the H-GAC Southeast Mobility Study that is currently underway and connects to improvements recommended in the H-GAC Hobby Area Livable Center Study.
Map/Location
Benefit/Cost Analysis
Roadway-Safety-Benefits-Broadway.xlsx
Roadway-Emissions-Benefits-Broadway.xlsx
Regional_employment_Broadway.JPG
The proposed project is being submitted under the complete street category. Benefit factors considered as part of the improvement include improved traffic signals, adding turn lanes, and safety lighting at intersections. The roadway is also being designed so that additional capacity maybe added with minimal impact to the adjacent properties.
Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings
Yes
901 - 1000
No
Planning Factors - Environmental Justice
Yes
Yes
Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)
0.01 – 0.10
Planning Factors - Improves Multimodal LOS
Yes
Yes
Yes
This segment of Broadway directly connects to the national designated freight portion of Broadway. The proposed project will improve transit mobility with consolidated bus stops, wider sidewalks for pedestrian mobility and safety, and a buffered bicycle facility that connects to adjacent bicycle connections.
Planning Factors - Planning Coordination
Yes
City of Houston Major Thoroughfare and Freeway Plan
https://www.houstontx.gov/planning/transportation/MTFP.html
Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route
Collector
No
No
No
Yes