Who is Completing the Application?
Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.
David Gornet
Program Manager
713-542-8524
Primary Agency Information
Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.
301 Jackson Street, Suite 401
Richmond
TX
77469
Additional Agency Information
Project Information
Roesner Road Extension and Widening
Fort Bend County
Roesner Road
from north of Gaston Road to the Fort Bend/Harris County Line, 2.38 miles
Roesner Road exists as a 4-lane thoroughfare for more than 2 miles south and west of Gaston Road to approximately 2000’ north of Gaston Road. The road does not exist over Willow Fork Buffalo Bayou, a geographic barrier to travel. North of Willow Fork, Roesner Road exists from Westheimer Parkway, north past Bay Hill Blvd to Katy Gap Road as a 2-lane road with open ditch drainage. Existing and ongoing development in the area and the gap (lack of a crossing) at Willow Fork cause traffic delays and safety issues that impacts parallel roads in the area.
Construct a 4-lane Roesner Road Extension from its current terminus north of Gaston Road, across Willow Fork Bayou to Westheimer Parkway. Widen existing Roesner Road from a 2-lane open ditch road to a 4-lane thoroughfare from Westheimer Parkway to Bay Hill Blvd, to the Fort Bend/Harris County Line.
The project will complete gaps in the existing Fort Bend roadway system, thereby improving mobility, improving safety, reducing delays and emissions while being responsive to continuing growth in the project area.
No
No
Less than $100 million
(Expand) Roadway Added Capacity/New Construction/Complete Streets
32500000
Project Development/Readiness
Not Started
Environmental Assessment (EA)
05/01/2021
Yes
No
No
No
Yes
01/01/2022
01/01/2022
05/01/2023
22
0
No
No
Map/Location
Benefit/Cost Analysis
Roesner Road Ext-Wide Roadway-Safety-Benefits-Estimate.pdf
Roesner Road Ext-Wide Emissions-Benefits-Estimate.pdf
the Roesner Road project is challenging to ID a type of project. the completion of a much needed link is similar to the active transportation link or to a grade separation in benefit and life span though there is not a way to keep the project as one while providing separate B/C estimates for the widening project and the extension project. we ask that you allow discussion of how to submit a single project with two methodologies for the two projects.
Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings
Yes
901 - 1000
No
Planning Factors - Environmental Justice
No
Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)
0.11 - 0.20
Planning Factors - Improves Multimodal LOS
No
No
Yes
the inclusion of a barrier crossing and the inclusion of bike/ped facilities for the entire project should earn additional points. not available under a single category for two projects.
Planning Factors - Planning Coordination
Yes
Fort Bend County Major Thoroughfare Plan
https://www.fortbendcountytx.gov/home/showdocument?id=1337
Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route
Minor Arterial
No
No
No
Yes