Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Megan Campbell

Planner

713-802-5325

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

Texas Department of Transportation - Houston

Quincy Allen

District Engineer

713-802-5000

[email protected]

7600 Washington Avenue

Houston

TX

77007

Additional Agency Information

Project Information

SH 332 Widening

Brazoria County

SH 332

E of FM 521, SH 288

The demand exceeds or approaches capacity during both of the daily commute periods. Congestion develops due to competing uses (i.e., local traffic use and through traffic use). The truck volume on the facility is roughly 3,535 trucks per day and this represents 11.0% percent of the facility's AADT. The facility had 286 crashes, 9 serious injuries and 1 fatality during the period from 2015 to 2017. The lack of an adequate drainage system has contributed to poor drainage conditions along the roadway and adjacent roadside ditches.

TxDOT proposes to reconstruct and widen SH 332 in Brazoria County, Texas from FM 521 to SH 288. Roadway improvements would include the reconstruction or replacement of bridges over Buffalo Camp Bayou. The project would include sidewalks on both sides of the roadway for the entire length of the project. In addition to roadway improvements, improved drainage ditches would be constructed along the north and south sides of the project.

The purpose of the proposed project is to reduce traffic congestion, accommodate population growth, enhance mobility and improve safety and drainage along SH 332. The proposed project would accomplish this purpose by adding capacity, dividing the undivided section of the roadway and updating drainage within the project area.

Yes

525

Yes

1524-01-047, 1524-01-075

Less than $100 million

(Expand) Roadway Added Capacity/New Construction/Complete Streets

41624000

TXDOT_HOU_HGAC2018CFP.PDF

Project Development/Readiness

30% PS&E

Environmental Assessment (EA)

12/01/2019

Yes

No

No

No

Yes

06/01/2020

06/01/2020

06/01/2022

100

0

No

No

US Army Corps would be an Individual Permit (IP)

Map/Location

Map_HOU_98_HW_SH332.pdf

Project Budget

HOU_98_HW_SH332 Project Budget Worksheet.xlsx

No

Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings

Yes

901 - 1000

No

Planning Factors - Environmental Justice

Yes

Yes

Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)

0.11 - 0.20

HOU_98_HW_SH332 Level of Time Travel Reliability LOTTR Estimation Template - Editable.xlsx

Planning Factors - Improves Multimodal LOS

Yes

No

Yes

This project adds one lane of capacity in each direction. This project will construct sidewalks, as well as a 15-foot-wide shared-use lane that can accommodate bicyclists.

Planning Factors - Planning Coordination

Yes

H-GAC RTP 2040 (Under MPO ID 525)

http://www.h-gac.com/taq/plan/2040/default.aspx

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Minor Arterial

No

Yes

No

No

route_support.pdf