Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Megan Campbell

Planner

713-802-5325

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

Texas Department of Transportation - Houston

Quincy Allen

District Engineer

713-802-5000

[email protected]

7600 Washington Avenue

Houston

TX

77007

Additional Agency Information

Project Information

SH 35 Direct Connectors

Harris County

SH 35

AT IH 610

The project is needed because SH 35 from IH 45 to Bellfort is inadequate to meet current and future traffic volumes, resulting in congestion, reduced mobility, undesirable operational Level of Mobility, and is inadequate to provide emergency access and a safe hurricane evacuation route. Six existing travel lanes have been previously constructed from Spur 5 to US 90 (A)/Old Spanish Trail.

Construct 2 direct connectors between IH 610 and SH 35

Accommodate regional population growth within the region projected between the years 2010 and 2035. Reduce traffic congestion within the project area. Increase north/south mobility within the region by controlling access, reducing signalization, and reducing at-grade railroad crossings within the SH 35 study area. Improve community and economic viability within the study area by linking the communities with a viable transportation system with improved mobility and reduced traffic congestion. Improve safety within the study area. Increase hurricane evacuation capacity through the study area.

No

Yes

0271-16-111

Less than $100 million

(Expand) Roadway Added Capacity/New Construction/Complete Streets

45232000

TXDOT_HOU_HGAC2018CFP.PDF

Project Development/Readiness

30% PS&E

Environmental Assessment (EA)

10/01/2019

Yes

No

Yes

No

Yes

01/01/2021

01/01/2021

01/01/2021

30

0

No

No

Anticipated US Army Corps of Engineers Permits: Nation Wide Permit (NWP) and potential 408

Map/Location

Map_HOU_56_HW_IH610.pdf

Project Budget

HOU_56_HW_IH610 Project Budget Worksheet.xlsx

No

Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings

Yes

901 - 1000

Yes

Planning Factors - Environmental Justice

Yes

Yes

Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)

0.01 – 0.10

HOU_56_HW_IH610 Level of Time Travel Reliability LOTTR Estimation Template - Editable.xlsx

Planning Factors - Improves Multimodal LOS

Yes

Yes

No

This project adds capacity and is within METRO service area.

Planning Factors - Planning Coordination

Yes

Harris County Thoroughfare Plan

https://www.houstontx.gov/planning/transportation/MTFPMap/MTFP_Map16.pdf

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Principal Arterial

Yes

No

No

No