Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Megan Campbell

Planner

713-802-5325

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

Texas Department of Transportation - Houston

Quincy Allen

District Engineer

713-802-5000

[email protected]

7600 Washington Avenue

Houston

TX

77007

Additional Agency Information

Project Information

FM 528 Extension

Brazoria County

FM 528

SH 35 Business (N Gordon St) to SH 6

The purpose of the proposed project is to improve traffic operations, travel times, increase emergency access, and reduce traffic delay along a congested and developing FM 528 corridor.

Construct 2-lane new location roadway and create grade separation at rail crossing

The proposed project is needed for system connectivity, accommodating growth, providing improved emergency access, and enhancing mobility along FM 528 and the surrounding roadways. The surrounding area has grown in population with small suburban development and is in need of the connection of FM 528 between SH 35B (Gordon Street) and SH 6. In addition, the proposed FM 528 extension is needed for direct connection to SH 6, which is a hurricane evacuation route within the project area. The lack of connection with FM 528 within the proposed project limits does not provide system connectivity for the region. The proposed project would allow motorists additional opportunities for access to a designated hurricane evacuation route (SH 6) and a bypass from flooding at the underpass of SH 6 and the BNSF Railway. Additionally, the proposed project would provide additional direct access to the west side of the City of Alvin and for buses heading north and east. A sidewalk is proposed to accommodate pedestrian traffic. This sidewalk would provide connectivity to the subdivisions located on either side of the BNSF railroad tracks. The FM 528 project area has been growing and is expected to continue to grow. More people are moving into the area because of its accessibility to employment in the City of Houston; less expensive housing and rural surroundings.

Yes

7564

Yes

1414-02-016

Less than $100 million

(Expand) Roadway Added Capacity/New Construction/Complete Streets

7568000

TXDOT_HOU_HGAC2018CFP.PDF

Project Development/Readiness

30% PS&E

Environmental Assessment (EA)

03/14/2017

Yes

No

Yes

No

No

Yes

30%

No

09/01/2023

No

Anticipated US Army Corps of Engineers Permits: Nation Wide Permit (NWP)

Map/Location

Map_HOU_49_HW_FM528.pdf

Project Budget

HOU_49_HW_FM528 Project Budget Worksheet.xlsx

No

Benefit/Cost Analysis

HOU_49_HW_FM528 Roadway Safety Benefits Template - Editable.xlsx

1031201814454PM.xlsx

HOU_49_HW_FM528 Roadway Emissions Benefits Template - Editable.xlsx

Map_HOU_49_HW_FM528_Support.pdf

Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings

Yes

901 - 1000

Yes

Planning Factors - Environmental Justice

Yes

Yes

Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)

More than 0.30

HOU_49_HW_FM528 Level of Time Travel Reliability LOTTR Estimation Template - Editable.xlsx

Planning Factors - Improves Multimodal LOS

Yes

No

Yes

This project adds one lane of capacity in each direction. This project will construct sidewalks, as well as a 15-foot-wide shared-use lane that can accommodate bicyclists.

Planning Factors - Planning Coordination

Yes

H-GAC RTP 2040 (Under MPO ID ID 7564) ; City of Alvin Support Letter

http://www.h-gac.com/taq/plan/2040/default.aspx

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Principal Arterial

No

Yes

No

No

route_support.pdf