Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Megan Campbell

Planner

713-802-5325

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

Texas Department of Transportation - Houston

Quincy Allen

District Engineer

713-802-5000

[email protected]

7600 Washington Avenue

Houston

TX

77007

Additional Agency Information

Project Information

IH 10/SS 330 Ramp Reversal

Harris County

IH 10

SS 330 to Thompson Rd

The need for the proposed I-10 from Spur 330 to Thompson Road Roadway Improvement Project is to limit heavy truck traffic on Thompson Road by offering I-10 eastbound access from northbound Spur 330.

The proposed I-10 from Spur 330 to Thompson Road Roadway Improvement Project includes the following: removal of the existing entrance ramp to I-10 eastbound, removal of existing I-10 eastbound frontage road pavement (to remove the two curves in the frontage road), construction of a new entrance ramp approximately 0.40 mile east of the existing Spur 330 southbound entrance ramp to I-10 eastbound, reconstructing and straightening of the I-10 eastbound frontage road to accommodate a new entrance ramp to I-10 eastbound, and construction of an auxiliary lane on the I-10 eastbound mainlanes between Spur 330 and Thompson Road to provide easy access to the I-10 eastbound mainlanes for traffic entering I-10 from the proposed entrance ramp as well as for traffic exiting the I-10 eastbound mainlanes to Thompson Road.

The purpose of the proposed project is to provide vehicular traffic easy access to I-10 eastbound while traveling on Spur 330 northbound or southbound by relocating the I-10 eastbound entrance ramp within the project limits. Traffic entering the I-10 mainlanes and exiting the mainlanes for Thompson Road would be accommodated by an auxiliary lane constructed along the I-10 mainlanes within the project limits. The removal of the two curves along the I-10 frontage road would promote improved safety while still providing access to the wastewater treatment facility located along the eastbound frontage road within the project limits. The proposed project would be constructed within the existing ROW; no additional ROW is required for the implementation of this proposed roadway improvement project.

Yes

16324

Yes

0508-01-345

Less than $100 million

(Maintain) Roadway/Freight Rehabilitation/Reconstruction

6248000

TXDOT_HOU_HGAC2018CFP.PDF

Project Development/Readiness

60% PS&E

Categorical Exclusion (CE)

08/01/2020

C-22

No

No

No

Yes

No

Yes

60%

No

08/01/2022

No

Interstate Access Justification (IAJ) completed

Map/Location

Map_HOU_43_HW_IH10.pdf

Project Budget

HOU_43_HW_IH10 Project Budget Worksheet.xlsx

No

Benefit/Cost Analysis

HOU_43_HW_IH10 Roadway Safety Benefits Template - Editable.xlsx

10312018124951PM.xlsx

HOU_43_HW_IH10 Roadway Emissions Benefits Template - Editable.xlsx

HOU_43_HW_IH10_Support.pdf

Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings

Yes

901 - 1000

No

Planning Factors - Environmental Justice

Yes

Yes

Planning Factors - Resiliency/Flood Mitigation Strategies

Yes

This ramp improves access to a state designated evacuation route. 

Planning Factors - Improves Multimodal LOS

Yes

Yes

Yes

This project creates an improved connection between north bound SS 330 and IH 10.  This project benefits Harris County Transit Baytown Route 4 (https://transit.harriscountytx.gov/Route%20Maps/Baytown_4_Schedule.pdf). This project adds a 15' outside lane to accommodate bicyclists.

Planning Factors - Planning Coordination

Yes

H-GAC RTP 2040 (Under MPO ID 16324)

http://www.h-gac.com/taq/plan/2040/default.aspx

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Principal Arterial

No

No

Yes

No