Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Matthew Johnson

Traffic Engineer

281-420-7119

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

City of Baytown

Jose Pastrana

Director of Engineering

281-420-6545

[email protected]

2123 Market Street

Baytown

TX

77522

Additional Agency Information

Project Information

Texas/Market/Lee/Decker Intersection Improvements

Harris County

Market/Decker

Lee Drive to Sterling Avenue

This project will address the traffic congestion, poor configuration and unsafe conditions of three closely spaced traffic signals as well as multiple cut-through access points within a 1,000-foot section of a heavily traveled corridor. The traffic signal at the intersection of Lee Drive and Market Street (signal 1) is located less than 300' from the traffic signal at the intersection of Texas Ave and Market Street/Decker Drive (signal 2) which is located 600' from the traffic signal at the intersection of Sterling Avenue and Decker Drive (signal 3). Signal 2 is operating as a pre-timed signal because the detection technology is no longer operable while the detection at signal 1 and signal 3 does operate. This situation creates undue congestion and delay. Sterling Avenue and Defee Street are used as cut-through for many drivers in order to bypass signal 2 which causes unsafe conditions at their respective intersections and the traffic on the local streets.

This project proposes to address the congestion, poor configuration and unsafe conditions of the three signals described in 5, above, by -replacing signal 1 with a single-lane roundabout with full slip lanes, -replacing signal 2 with a dual-lane roundabout with dual-lane entrances and exits for all four legs, -removing the access to Decker Drive from Defee Street, -removing the access of Hemphill Street from Texas Avenue and, -removing the signal 3 from operation completely after removing the access to Decker Drive from Sterling Avenue.

This project will facilitate the flow of and provide for the safe progress of traffic through a once congested and unsafe traffic signal corridor. The sections of roadways which will have their access removed will be turned into linear parks and trails and connect to the existing City of Baytown trail system.

No

No

Less than $100 million

(Manage) Access Management/Safety/Grade Separations

1100000

agMemo_16367.pdf

Project Development/Readiness

Not Started

None of the Above

01/01/2021

No

No

No

Yes

No

No

No

Map/Location

Project Map.pdf

Project Budget

project-budget-worksheet-template.xlsx

No

Benefit/Cost Analysis

Roadway-Safety-Benefits-Template (1).xlsx

1031201833536PM.xlsx

Roadway-Emissions-Benefits-Template.xlsx

Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings

Yes

1 - 500 Jobs

No

Planning Factors - Environmental Justice

Yes

Yes

Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)

0.01 – 0.10

lottr-estimation-template.xlsx

Planning Factors - Improves Multimodal LOS

No

No

No

This project is not expected to improve multimodal LOS.

Planning Factors - Planning Coordination

No

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Principal Arterial

No

No

No

Yes