Regional Goods Movement Questionnaire

Project Information

Agency Name City of Dickinson
Project Title Dickinson Ave./FM 1266 Safety Improvements
Facility/Street/Highway Dickinson Avenue / FM 1266
Limits FM 646 to FM 517
Description The improvement will be a full reconstruction of the roadway including the addition of street lighting, sidewalk facilities, and upgrades to signalized intersection at Deats Road. To accommodate the addition of sidewalks, the existing open ditches will be replaced with culverts.
Timeframe Short Term (0-5 Years)
Estimated Cost $15,000,000.00

Investment Category-Focused Criteria

Yes

The northern extent of the project boundary intersects with FM 646 which is on the Texas Highway Freight Network (TxDOT). There is no ranking or priority in the freight plan.

https://gis-txdot.opendata.arcgis.com/datasets/b07d8609500c470eb1418543cb8dbcc2_0/explore?location=29.726014%2C-96.314006%2C8.00

Medium

No

5.3%

5.3%

Yes

No

Dickinson Avenue (FM 1266) provides critical connectivity between FM 517 and FM 646 in the communities of Dickinson and League City respectively. The corridor serves as an alternate route to IH 45 and SH 3, both of which are often congested with daily and commuter traffic. With an average daily truck traffic volume of 5.3%, Dickinson Avenue (FM 1266) serves as a designated Hazardous Materials Route. The corridor serves as a north/south connection option for the Calumet Special Products Partners manufacturing facility, located just south of FM 517.

Yes

The City of Dickinson desires to work with TxDOT and local industrial property owners to coordinate freight deliveries to off-peak or overnight times. This would allow for a significant reduction in truck traffic during normal commute times and avoid potential conflicts with student pick-up/drop-off times at Jake Silbernagel Elementary School, located on Dickinson Avenue (FM 1266). This would improve safety for schoolchildren and all users of the corridor.

No

No

Yes

Dickinson Avenue (FM 1266) serves as a vital alternative evacuation route as the only north/south connection between SH 3 and SH 146. The corridor stretches from FM 517 and SH 96 (League City Parkway) on the northern end. It also connects to FM 646 in League City.

Other Investment Category Focused Criteria

Traffic operations will be greatly improved for all transportation modes as a result of this project. The operational improvements will be achieved through the addition of a continuous center turn lane along the entire length of the project. The center turn lane will allow any vehicles turning left to enter the center turn lane to wait until a safe left turn movement can be made. This will remove the vehicles making left turn movements from the through travel lanes, allowing for more safe and efficient traffic flows in both directions. Additionally, the addition of 8-foot pedestrian and bicycle facilities on both sides of the roadway will provide safe, buffered spaces for pedestrians and bicyclists to traverse the corridor while completely removed from the travel lanes. Currently, there are no dedicated sidewalks or bicycle facilities on the corridor, forcing autos, truck, bicycles, and pedestrians to all utilize the substandard 11' travel lanes. Additionally, the project proposes to completely reconstruct and update the 3 existing signalized intersections along the corridor. On the northern end of the project at FM 646, improvements will be considered such as the addition of a dedicated right turn lane for traffic headed toward SH 146 to the east. The traffic signals will be upgraded by installing mast arms with high visibility signal heads, increasing safety of the intersection. In the middle of the corridor, the existing signalized intersection at Deats Road will be reviewed for potential geometric changes to remove the existing skewed alignment of Deats as it intersects with Dickinson Avenue (FM1266). The goal will be to create as close to a 90-degree intersection as possible. Additionally, operational improvements such as a dedicated left turn lane (northbound to westbound) and a dedicated right turn lane (southbound to westbound) will be considered. Lastly, at the southern end of the corridor, the signalized intersection at FM 517 will be reconstructed as well. The traffic signals will be upgraded by placing on mast arms with high visibility signal heads. The timing of all 3 signals along the project length will be be analyzed and optimized to meet current traffic conditions.

There are currently several developable parcels of significant size that remain undeveloped along Dickinson Avenue (FM 1266) between FM 646 and FM 517. These undeveloped parcels include large tract lots (7+ acres) as well as high visibility corner lots at FM 646 and also at Deats Road. Per the H-GAC Regional Land Use Information System, the currently undeveloped large tracts are projected to become single family residential development and the corner lots are projected to become mixed use or commercial developments. Utilizing H-GAC's Activity-Connectivity Explorer (ACE) Tool, an analysis of the population and job growth for TAZs 4697, 4698, 4703, 4704, 4727, 4726, 4731, 4705, and 4707 (all within 1/4 mile of Dickinson Avenue - FM 1266) projects that the area will experience an increase of 5,571 residents and 619 jobs between 2018 and 2045. This translates to a population growth of 38.9% and jobs increase of 28.6% between 2018 and 2045.

As the corridor currently exists, there are no sidewalks or bicycle facilities anywhere within the project area creating an extremely unsafe situation for pedestrians, bicyclists, and drivers. The proposed improvements include the addition of 8-foot sidewalks to be placed on each side of the roadway creating a safer, dedicated space for multimodal users to access and traverse the corridor. These improvements are critical for the residential and educational facilities along the corridor. The majority of the existing development along both sides of the corridor are single family homes and mobile home parks. Additionally, Jake Silbernagel Elementary School is located on the east side of the corridor, just north of Deats Road. There is currently no bicycle or pedestrian access to the elementary school, resulting in unsafe conditions for the elementary students and parents attempting to access the school by non-automobile modes. Additionally, through a separate project, a sidewalk will be added to 25th Street, on the southern side of the elementary school to improve pedestrian access to the neighborhood east of the school. Together, the bicycle and pedestrian improvements proposed on Dickinson Avenue (FM 1266) and 25th Street will result in safer access to Jake Silbernagel Elementary School.

Currently, the Gulf Coast Transit District (GCTD) operates fixed route transit services in portions of Brazoria and Galveston Counties, including in the cities of Dickinson and League City. The current fixed route alignment travels along southbound along Dickinson Avenue (FM 1266) from Deats Road to 30th Street. The addition of the center turn lane in the proposed improvements will greatly benefit this important local transit service. The ability for buses to utilize the center turn lane will create a safer and more efficient traffic condition for the buses in the main travel lanes, and will allow the buses to maintain a better schedule and on time performance to meet the needs of some of Dickinson's most vulnerable residents who rely on the GCTD bus service as their only means of mobility. Additionally, the proposed sidewalk improvements along Dickinson Avenue (FM1266) will allow for a future expansion of GCTD transit routes in the area that could better connect Dickinson and League City.

The existing conditions of Dickinson Avenue (FM 1266) has 2 narrow travel lanes (one in each direction) with deep, open ditches on both sides of the roadway. Currently a stalled vehicle or crash incident can leave the roadway unusable in one or both directions. When these types of incidents occur, it creates unnecessary delay, congestion, and potential safety issues. Additionally, the absence of a center turn lane makes routine maintenance of the roadway difficult without increasing delay, congestion, and creating potential safety issues. If Dickinson Avenue (FM 1266) becomes impassable in either or both directions, users would need to reroute to either SH 3 (1.65 miles to the west) or to FM 3436 (2.4 miles to the east) to access either FM 517 to the south or FM 646 to the north. Through the addition of the proposed center turn lane along the full length of the project area, many of these issues will be mitigated. Traffic could be temporarily diverted from either the northbound or southbound travel lane into the center turn lane until the incident is cleared or maintenance work is completed. This will result in a safer and more efficient condition for all roadway users.

Though the existing pavement condition of Dickinson Avenue (FM 1266) from FM 517 to FM 646 is currently in fair condition, the proposed reconstruction of the roadway with a concrete surface will reduce long-term maintenance costs in the future. Additionally, the updated stormwater drainage facilities proposed include removing the existing open ditches to replace with a curb and gutter cross section with subterranean drainage, which will mitigate long term maintenance costs associated with mowing, debris removal, and retrenching. Lastly, the replacement of the existing span wire traffic signals at FM 646 and FM 517 will reduce long term maintenance costs of those intersections while improving performance and safety during major wind events.

Planning Factors Criteria

3.05

9.16

From 2017 to 2021, there were a total of 320 crashes occurred on Dickinson Ave/ FM 1266 from FM 517 to SH 646, resulting in one fatal crash and three severe crashes. The fatal crash was a pedestrian crash that occurred in 2021 due to the driver failing to drive in a single lane. To address the safety concerns of this roadway, the project includes the following: • Reconstruct roadway to curb and gutter with concrete pavement • Install a continuous two-way left turn lane • Install 8’ wide shared use paths on both sides of the corridor with 4’ buffer • Install streetlights on both sides of the corridor • Widen the bridge at the West Gum Bayou crossing near the intersection of Dickinson Ave and Deaths Rd • Upgrade traffic signal to mast arm at the intersection of FM 517 and Dickinson Ave, and the intersection of Dickinson Ave and SH 646 • Install new ADA ramps, crosswalks, pavement markings as needed along the entire corridor • Waterline and sanitary sewer replacements and adjustments as required • Relocate utilities as needed

Resiliency

Low

Low

Currently, Dickinson Avenue (FM 1266) is drained entirely by open ditches on both sides of the roadway. The proposed improvements include installation of a curb and gutter cross section which will include subterranean stormwater drainage facilities. These stormwater drainage improvements will include a combination of box 10' x 5' and 6' x 6' reinforced concrete box culverts as well as 24" and 36" reinforced concrete pipes. This combination drainage infrastructure will ensure the roadway will have the necessary drainage capacity to exceed local design requirements and provide better drainage than the currently existing conditions. By placing the stormwater drainage facilities underground, it will be possible to introduce the bicycle and pedestrian facilities on the corridor. Additionally, the underground drainage facilities will reduce costly maintenance expenses including mowing, trash/debris collection, and periodic retrenching associated with open ditches. Another improvement proposed by this project includes a wider bridge spanning West Gum Bayou (between FM 517 and Deats Road). This wider bridge span will improve the flow of water beneath the bridge during storm events.

Access/Connectivity

6189

8626

No

Yes

No

Environmental Justice

6189

8626

1562

1168

483

979

29.6

At least 1 in 3 households living on either side of Dickinson Avenue (FM 1266) are defined as Low to Moderate Income by HUD. There are some sections on eastern side of the corridor where that number rises to 7 of 10 households. Many households on both sides of the corridor own only 1 car or 0 cars. The residents surrounding this project area are in great need of safe bicycle and pedestrian facilities. Currently, there are no sidewalks or bicycle facilities along Dickinson Avenue (FM 1266) between FM 646 and FM 517. This project proposes to greatly improve conditions for bicyclists and pedestrians by adding 8' sidewalks to both sides of the corridor, each with a 4' landscaped buffer between the curb and sidewalk. Additionally, the number of streetlights along the corridor will be greatly increased, resulting in a much safer and accessible condition for drivers, pedestrians, and cyclists throughout the day and night. Other safety enhancements will be included in the project at the 3 signalized intersections such as high visibility crosswalks, pedestrian phase signaling, and pedestrian median refuges as needed.

This project has no adverse effects to vulnerable populations. The list of adverse effects from the detailed criteria and comments are listed below: - Body impairment, infirmity, illness, or death: This project will improve safety for all users, particularly multimodal users through its transportation safety countermeasures. - Air, noise, or water pollution; soil contamination: This project will reduce air pollution through conversion of trips from automobiles to multimodal modes; a soil and groundwater management plan will be implemented during construction. - Disruption or diminution of manmade or natural resources: This project will not affect manmade or natural resources. - Destruction or diminution of aesthetic values: This project will improve aesthetic values through landscaping and additional landscaping planted along the corridor. - Impact upon the cohesion or economic vitality of a community: This project will increase economic vitality and cohesion of the community through improved access, connectivity, and safety. - Impact to public or private facilities and services: This project will improve the impact to public and private facilities or services by improving access and connectivity. - Adverse impacts on employment: This project will create short-term jobs through construction. The improvements will provide access to businesses and other uses along the corridor, which will encourage economic growth. - Displacement of persons, businesses, farms, or non-profit organizations: No right of way is required and there will be no displacement. - Increased traffic congestion, exclusion or separation: The improvements will decrease traffic congestion, improve travel time reliability and reduce delay. - Detail or, reduction in, significant delay in receipt of benefits of transportation program: This project is in alignment with local, regional, state and federal goals. The project, if funded, will advance the receipt of benefits of the regional transportation program.

Impacts on Natural and Cultural Resources

Most of the project alignment is within the 500- or 100-year flood plain. This area is largely developed with residential neighborhoods. Because the project is an improvement of an existing roadway, it is not anticipated to adversely impact flooding. Coordination will be done with the appropriate flood control agencies as needed. The project crosses a wetland just sound of its intersection with Deats Road; there are also several wetland areas adjacent to the alignment. Project work is not anticipated to fill or dredge any wetland areas and adverse impacts are not expected. A portion of FM 517 just within ¼ mile of the project is considered a Texas State Historic Highway Route (1924 Automobile Red Book – Meridian). Based on the distance from the project, this resource is not anticipated to be impacted. The northern portion of the alignment is in an area designated as “Surface Survey of Mounds Only; No Deep Reconnaissance Recommended.” The area around FM 646 is cleared but undeveloped, but the rest of this designated area has been developed with commercial/industrial and residential uses. An archeological survey will be completed as needed.

H-GAC to calculate

Innovation

No

No

Additional Documents

662_Dickinson Ave (FM1266) - supporting materials.pdf

662_Dic1266_BCA memo.pdf