High Growth Area Needs Questionnaire

Project Information

Agency Name TxDOT Houston District
Project Title FM 1314 AMS Phase 3 of 3
Facility/Street/Highway FM 1314
Limits From SL 494 to SH 242
Description FM 1314 Access Management Study Long Term Recommendations Implementation (Phase 3)
Timeframe Long Term (More than 10 Years)
Estimated Cost $87,560,000.00

Investment Category-Focused Criteria

FM 1314 from SH 242 to SL 494 is a 12-mile- long corridor, located within a rapidly developing urban area of Montgomery County. Recent origin-destination (Replica) data indicates that FM 1314 serves as a significant route to IH 69, and a considerable proportion of trips originate and conclude within the study area itself. Grocery stores, restaurants, and other commercial developments near IH 69 N attract individuals from more residential areas along the corridor, making this area one of high priority. Lands along FM 1314 are being developed quickly. 61% of lands within the 0.5 radius of the corridor are either vacant or famlands, which could be developed to residential or commercial propoerties. According to H-GAC, the total population of all Traffic Analysis Zones (TAZ) adjacent to the study corridor is expected to increase from 25,698 in 2018 to 81,356 in 2045 with the highest increase in population occurring between Grand Pkwy/SH 99 and Riverwalk Dr/Spartan Dr where Porter High School is currently located. Total employment for all corridor adjacent TAZs is expected to increase from 6,068 in 2018 to 14,810 in 2045. Increased population and employment are expected to contribute to an increase in travel to and from, and along the FM 1314 corridor. H-GAC's travel demand model (TDM) determined that hourly PM traffic is expected to reach volumes ranging from 1,600 to 2,800 in each direction by 2043. The highest growth rate along FM 1314 is expected to occur between Grand Pkwy and Gene Campbell Blvd. Commuter and freight traffic use FM 1314 to access the East Montgomery County Industrial Park which holds multiple internationally recognized companies, including Wal-Mart and Lowes. EMCID is actively recruiting more companies to the 800-acres industrial park. Many businesses opened in the past 10 years, including the Walmart’s opening in 2018. Multiple future developments slated throughout the corridor are predicted to further contribute to the increase in population, employment, and travel demand along the FM 1314. These developments include two grocery stores, 4,000 single-family homes, a distribution center, and two mixed-use developments comprised of multiple commercial developments, 342 apartments, a hospital, and a medical district. All future developments are considered short-term excluding one grocery store, which is considered mid-term and will be located near SH 242.

Yes

https://www.txdot.gov/projects/projects-studies/houston/fm1314-access-management-study.html

The project scope includes the following improvements: Addition of a new third travel lane from IH 69 N to Gene Campbell Blvd. Addition of new 12-foot shoulders from IH 69 N to Gene Campbell Blvd. Addition of additional turn lanes ques from IH 69 N to Gene Campbell Blvd. Reserving the ROW along Gene Campbell Blvd for future widening. Enhancements to drainage ditches and drainage along the 12-mile corridor. Raised curb and 10-foot shared-use sidepath on both sides of FM 1314 (6.7 miles). Addition of new traffic signal at Ferne Drive. Intersection improvements to accommodate additional 3rd travel lane. Installation of 12-foot shoulders from McQueen Rd to Sorters Rd. Driveway management along the entire corridor, including the consolidation and installation of driveways (case by case basis). Realignment of Owens Rd to a traditional four-leg intersection. Realignment of Fatheree Dr intersection. Realignment of Mills Rd intersection. At-Grade Railroad Intersection realignment/consolidation with Royal Purple Lane at SL 494 and FM 1314.

Yes

Project corridor is experiencing high rates of growth in single family (Mavera, Artavia, The Highlands, and Azalea District at Valley Ranch Subdivisions) and commercial land uses. Corridor is major East-West thoroughfare between SL 494 (IH-69 N) and SH 242, ultimately connecting to IH-45 N. Porter High School has direct connection to the corridor. 2 New HEBs will be opening along this corridor as well.

Yes

This project will relieve traffic congestion by adding an additional lane as many local streets and local thoroughfares (Gene Campbell Road) dump traffic on to FM 1314.

LOS C

Yes

FM 1485, SH 242, and SH 99 all run parallel to FM 1314 and can be used as an alternative route if the road needs to close or vice versa.

No

Yes

Model.HighGrowthAreaNeedsQuestionnaire.InvestmentCategory5ai

Other Investment Category Focused Criteria

No

The project is not located on a Critical Urban Freight Corridor. The project is not located on the TxDOT or FHWA Freight Networks. The project improves regional goods movement by access management (medians/turn lanes) which will enhance traffic flow and reduce the quantity and severity of crashes. Widening from 4 to 6 lanes on FM 1314 from IH 69 N to Gene Campbell to address the additional truck traffic from nearby warehouses and commuters in the area.

The long-term congestion management strategy focuses on improving the mobility, safety, and efficiency of the corridor. These improvements collectively meet both current and future demands of the corridor while maintaining the corridor’s safety, efficiency, and utility. The strategies include: Lane widening from 2 to 3 lanes in each direction along FM 1314 with 12-foot shoulders and additional turn lanes from IH 69 N to Gene Campbell Blvd. Reserving the ROW along Gene Campbell Blvd for future widening. Drainage study and additional drainage infrastructure improvements (as determined by study). Construction of a raised curb and a 10-ft shared-use sidepath on both sides of FM 1314 (6.7 miles). Installation of a new traffic signal to improve mobility at Ferne Drive. 12-foot shoulder from McQueen Rd to Sorters Rd. Driveway management along the corridor, including the consolidation and installation of driveways (case by case basis). Realignment of Owens Rd, will convert this intersection to a traditional four leg intersection. Realignment of Fathree Dr to improve intersection angle and sight distance. Realignment of Mills Rd to improve intersection angle and sight distance. Realignment of Mills Rd intersection. At-Grade Railroad Intersection realignment/consolidation with Royal Purple Lane at SL 494 and FM 1314.

10 Ft Shared use paths and/or 6 ft sidewalks are being recommended on the entire corridor.

There is no transit along this corridor.

FM 1485 Corridor runs almost parallel to this project, inoperability impacts would be minimized because traffic could use FM 1485 as a backup route if FM 1314 were shut down.

Pavement Score: Fair This segment contains pavement in Fair condition, according to TxDOT and FHWA guidelines. The project includes reconstruction of the roadway which will lead to an improvement in the state of good repair and extend the service life of the facility.

Planning Factors Criteria

3.196

16.895

The crash rate per VMT on the southern end of FM 1314 are above the statewide average, with the segment between IH 69 N and SL 494 far exceeding the statewide average. The statewide average crash rate of FM roads is 253.5 per 100 million VMT (MVMT). However, the average crash rate on FM 1314 is 340 per 100 MVMT from Sorters Rd to IH 69 and an astonishing 1,246 per 100 MVMT from IH 69 N to SL 494. Crashes data from CRIS for years 2017-2022 report a total of 1,358 crashes within those six years. There are eight fatal and 30 severe injury crashes in these years, suggesting that severe crashes reoccur annually. Failing to control speed and failing to yield right of way are the top primary contributing causes to crashes. See work types on High Growth Area Needs Question 3.

Resiliency

Low

Model.HighGrowthAreaNeedsQuestionnaire.Resiliency2

All current projects are being designed to meet and/or exceed ATLAS-14 drainage standards.

Access/Connectivity

12,790

12,904

No

Yes

Yes

Environmental Justice

12,790

12,904

3,900

2,426

1,348

2,605

28.5

This project will improve mobility to and from jobs and provide for multimodal opportunities by including sidewalks/shared use paths. Students will now have safe routes to schools along the corridor if they so choose to walk to school.

This project includes medians that opportunity spaces for green landscaping (improves air quality and creates a traffic calming measure to improve safety) by EMCID if they so choose. For example, the project will improve drainage to ATLAS-14 standards, which will mitigate impacts from added capacity to vulnerable populations.

Impacts on Natural and Cultural Resources

FM 1314 subject to frequent flooding as it is located between the Caney Creek and Dry Creek. Segments of the FM 1314 corridor are under the 100-year or 500-year floodplains. All projects are being designed to match or exceed ATLAS-14 standards.

NOx: -1.79, VOC: -7.56

Innovation

Yes

Brand new Signal Phasing and timing (SpAT) signals will be installed on this segment of the project (Related to CSJ 0912-00-701 that will install 1,100+ of these signals on all traffic lights on TxDOT HOU district roads)

Yes

Brand new Signal Phasing and timing (SpAT) signals will be installed on this segment of the project (Related to CSJ 0912-00-701 that will install 1,100+ of these signals on all traffic lights on TxDOT HOU district roads)

Additional Documents

2023HGAC-CFP-CR-LOS-City of Conroe - Asst Director of Capital Projects (All Montgomery Co Projects).pdf

2023HGAC-CFP-CR-LOS-Montgomery County - County Judge&Comm (All Montgomery Co Projects).pdf

2023CFP-229 map.png