High Growth Area Needs Questionnaire

Project Information

Agency Name TxDOT Houston District
Project Title 36A Planning Studies
Facility/Street/Highway 36A
Limits From IH 10 W to US 290 /SH 6 near Hempstead
Description Preliminary engineering study in preparation for a possible DEIS
Timeframe Medium Term (6-10 Years)
Estimated Cost $7,500,000.00

Investment Category-Focused Criteria

The project is located in a high growth area. The population is projected to grow by 114.9% and jobs are projected to increase by 76.4%. While land use changes have not yet been announced or modeled, additional residential land uses will be needed in the future to accommodate the projected growth. This project is a preliminary engineering study in preparation for a Draft EIS for a new 21 mile 4-lane highway connecting IH 10 W to US 290/SH6. The project has been identified in prior planning studies to create an alternative to the already congested corridors of IH 10 W to US 290/SH6. The preliminary engineering study will establish the operational benefits that the project is anticipated to provide, including reducing daily traffic volume and delay on adjacent North-South routes. The added capacity will improve regional connectivity and reduce primary and secondary crashes due to congestion.

Yes

https://www.h-gac.com/getmedia/3bb31f66-1e79-4fdd-ac21-3e9240e2ad43/waller-county-transportation-plan.pdf

Preliminary engineering study in preparation for a possible DEIS for 36A (CONSTRUCT FOUR-LANE DIVIDED ON NEW LOCATION)

Yes

The project is located in a high growth area in Waller County. The population is projected to grow by 114.9% and jobs are projected to increase by 76.4%. Tons of new residential developments surrounding the project study area and industrial/warehousing projects closer to the IH 10 W corridor.

Yes

This project is a preliminary engineering study in preparation for a Draft EIS for a new 21 mile 4-lane highway connecting IH 10 W to US 290/SH6. The project has been identified in prior planning studies to create an alternative to the already congested corridors of IH 10 W to US 290/SH6. The preliminary engineering study will establish the operational benefits that the project is anticipated to provide, including reducing daily traffic volume and delay on adjacent North-South routes. The added capacity will improve regional connectivity and reduce primary and secondary crashes due to congestion.

LOS A

Yes

This proposed highway would provide redundancy to existing north-south roads in the western part of the H-GAC service area, such as FM 359 and FM 362 and certainly SH 99.

No

Yes

Model.HighGrowthAreaNeedsQuestionnaire.InvestmentCategory5ai

Other Investment Category Focused Criteria

No

The project is not located on a Critical Urban Freight Corridor. The project is not located on the TxDOT or FHWA Freight Networks, but it would connect roads that are. The project improves regional goods movement by adding capacity which will relieve congestion.

This project is a preliminary engineering study in preparation for a Draft EIS for a new 21 mile 4-lane highway connecting IH 10 W to US 290/SH6. The project has been identified in prior planning studies to create an alternative to the already congested corridors of IH 10 W to US 290/SH6. The preliminary engineering study will establish the operational benefits that the project is anticipated to provide, including reducing daily traffic volume and delay on adjacent North-South routes. The added capacity will improve regional connectivity and reduce primary and secondary crashes due to congestion.

Sidewalks or shared use paths could be recommended on the frontage roads for 36A. Shared use paths provide a low-stress experience for active transportation users, increasing user safety and health while improving regional connectivity. The addition of sidewalks will create transportation alternatives and allow pedestrians greater access to services and improve quality of life.

No existing or planned transit service is provided on this facility.

36A facility could act as a backup if SH 99 to the east is closed.

Project is on new Location, state of good repair would be brand new and service life is not applicable yet.

Planning Factors Criteria

-

-

N/A

Resiliency

Low

Model.HighGrowthAreaNeedsQuestionnaire.Resiliency2

Project is on new location but all roads around the region of this project are Low Vulnerability and Low Criticality. All current projects are being designed to meet and/or exceed ATLAS-14 drainage standards.

Access/Connectivity

7410

15772

No

Yes

No

Environmental Justice

7410

15772

2627

1031

544

1247

36.60

The area surrounding the project segment has a higher low-income population (21.06%) as compared to the regional average of 13.5%. The area surrounding the project segment has a lower minority population (60.02%) as compared to the regional average of 65% minority. Impacts to the environmental justice populations will be determined during the draft environmental impact statement evaluation process.

The area surrounding the project segment has a higher low-income population (21.06%) as compared to the regional average of 13.5%. The area surrounding the project segment has a lower minority population (60.02%) as compared to the regional average of 65% minority. TxDOT’s Environmental Process is designed to ensure compliance with Title VI of the Civil Rights Act of 1964, and the Executive Order on Environmental Justice. Standard practice is to implement projects that provide user safety and operational efficiency while taking into account environmental quality and impacts to surrounding communities. In practice this means identifying and assessing potential project impacts, then proposing measures to avoid, minimize and/or mitigate disproportionately high and adverse effects to Environmental Justice Populations.

Impacts on Natural and Cultural Resources

This project is in conceptual development. It is anticipated to proceed as an Environmental Impact Statement to evaluate, avoid and mitigate potential impacts to the natural or human environment.

N/A

Innovation

Yes

Brand new Signal Phasing and timing (SpAT) signals will be installed on this segment of the project - proposed frontage roads (Related to CSJ 0912-00-701 that will install 1,100+ of these signals on all traffic lights on TxDOT HOU district roads)

Yes

Brand new Signal Phasing and timing (SpAT) signals will be installed on this segment of the project - proposed frontage roads (Related to CSJ 0912-00-701 that will install 1,100+ of these signals on all traffic lights on TxDOT HOU district roads)

Additional Documents

2023CFP-070 map.png

2023HGAC-CFP-CR-LOS-City of Pattison - Mayor (All Waller Co Projects).pdf

2023HGAC-CFP-CR-LOS-Waller County - County Judge (All Waller Co Projects).pdf

2023HGAC-CFP-RGM-LOS-Brazoria County-Comm Pct 1 (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-City of Friendswood-Mayor (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-City of Galveston-Mayor (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-City of Pattison - Mayor (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-Port Freeport-Chairman (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-Waller County-County Judge (ALL RGM TxDOT Projects).pdf