High Growth Area Needs Questionnaire

Project Information

Agency Name TxDOT Houston District
Project Title FM 1458 Reconstruct/Realign and Widen
Facility/Street/Highway FM 1458
Limits From FM 359 to Austin C/L
Description Widen from 2-lane to 4-lanes and implement access management treatments including turn lanes, intersection improvements, and realigning existing roadway curves to improve safety and mobility.
Timeframe Long Term (More than 10 Years)
Estimated Cost $70,000,000.00

Investment Category-Focused Criteria

The project is located in a high growth area. The population is projected to grow by 373.3% and jobs are projected to increase by 111.8%. While land use changes have not yet been announced or modeled, additional residential land uses will be needed in the future to accommodate the projected growth.This segment of FM 1458 will benefit from improved connectivity and improved level of service that will result from this improvement. The average daily volume of traffic on this segment in 2021 was 1,295, with 11.3 percent of that being truck traffic. By 2041 daily traffic volume is expected to increase by 40 percent. The purpose of the project is to improve capacity, connectivity, level of service, and safety of the project segment. The added capacity will improve regional connectivity for all modes while also reducing congestion and improving safety by reducing primary and secondary crashes due to congestion and by bringing the segment of FM 1458 up to TxDOT and FHWA safety standards." Additional growth projections are available in the Waller County Transportation Plan, Appendix C Growth Matrix

Yes

Thoroughfare Maps and Plans | Houston-Galveston Area Council (H-GAC)

This project will widen from 2-lane to 4-lanes and implement access management treatments including turn lanes, intersection improvements, and realigning existing roadway curves to improve safety and mobility.

Yes

The project is located in a high growth area. The population is projected to grow by 373.3% and jobs are projected to increase by 111.8%. No notable land use changes announced or modeled. Additional growth projections are available in the Waller County Transportation Plan, Appendix C Growth Matrix

Yes

Adding capacity will relieve congestion in the facility by allowing for a reduced vehicle-to-capacity ratio. Further, it will allow more room for traffic to avoid crashes on the segment, reducing congestion caused by crashes. As an access management strategy in corridors, medians reduce mid-block left turn-related crashes. They enhance traffic flow and reduce the quantity and severity of crashes at intersections and resulting congestion. This project will improve intersection design and operation, facilitating more efficient traffic flow and reducing congestion caused by intersection-related crashes. This project includes adding turn lanes, which remove turning vehicles from the flow of traffic and reduce slowdowns and congestion. They also have the potential to reduce rear end crashes as well as a variety of other left turn conflicts, further reducing congestion caused by resulting crashes. Additional growth projections are available in the Waller County Transportation Plan, Appendix C Growth Matrix

LOS A

Yes

FM 1458 is one of three crossing points across the Brazos River, the other nearby alternatives are IH 10 W to the south and FM 529 to the north.

No

No

Other Investment Category Focused Criteria

No

The project is not located on a Critical Urban Freight Corridor. The project is not located on the TxDOT or FHWA Freight Networks. The project improves regional goods movement by added capacity which will relieve congestion.

This segment of FM 1458 will benefit from improved connectivity and improved level of service that will result from this improvement. The average daily volume of traffic on this segment in 2021 was 1,295, with 11.3 percent of that being truck traffic. By 2041 daily traffic volume is expected to increase by 40 percent. The purpose of the project is to improve capacity, connectivity, level of service, and safety of the project segment. The added capacity will improve regional connectivity for all modes while also reducing congestion and improving safety by reducing primary and secondary crashes due to congestion and by bringing the segment of FM 1458 up to TxDOT and FHWA safety standards.

Bike paths will be installed on another project (2023CFP-221), Sidewalks or shared use paths will most likely be built on both sides of this project. Shared use paths provide a low-stress experience for active transportation users, increasing user safety and health while improving regional connectivity. The addition of sidewalks will create transportation alternatives and allow pedestrians greater access to services and improve quality of life. Bike lanes increase the safety of riders and improve regional connectivity.

No existing or planned transit service is provided on this facility.

The project will widen lanes to allow more space to move disabled vehicles and will improve intersection design and operations to better maintain flow on the facility after vehicle collisions.

This segment contains pavement in Poor condition, according to TxDOT and FHWA guidelines. This segment contains bridges in Fair condition, according to FHWA guidelines. The worst bridge on this project segment was built in 1981. It is rated as being in Fair condition overall, with a superstructure condition score of 7, substructure condition score of 7, and a deck condition score of 6. In a widening/reconstruction project like this project, pavement is removed and new pavement is constructed, thus increasing the state of good repair and extending the service life of the facility.

Planning Factors Criteria

5.125

56.371

Crash rates for this segment are per 100 million VMT. The fatality rate is 5.125, higher than the regional average (1.23), and the serious injury rate is 56.371, higher than the regional average, (6.18). This project is strategically designed to enhance intersection design and operation, effectively lowering intersection-related crashes. The planned widening of the roadway serves the dual purpose of increasing its capacity and mitigating primary and secondary crashes resulting from congestion. The bike paths are scheduled for installation in a separate project (2023CFP-221). However, for this project, there is a high likelihood of constructing sidewalks or shared-use paths on both sides. The addition of pedestrian infrastructure will allow pedestrians to safely use the facility and reduce points of conflicts with vehicles, thus further contributing to the overall safety and accessibility of the area. The consolidated crash reduction factor for this project is 165% as a result of installing pedestrian and bicycle infrastructure (WC 407), converting a 2-lane facility to a 4-lane divided (WC 538), and improving the horizontal alignment (WC 506).

Resiliency

Medium

Model.HighGrowthAreaNeedsQuestionnaire.Resiliency2

All current projects are being designed to meet and/or exceed ATLAS-14 drainage standards.

Access/Connectivity

2,415

2,659

No

Yes

Yes

Environmental Justice

2,415

2,659

626

375

367

291

25.60

The area surrounding the project segment has a lower low-income population (11.19%) as compared to the regional average of 13.5%. The area surrounding the project segment has a lower minority population (47.52%) as compared to the regional average of 65% minority. Because of its central location in the regional network, the project will produce improvements in mobility and connectivity for vulnerable populations as well as connectivity to schools, medical facilities, and social services for the regional population. As a result of the improvement, vulnerable populations will have increased resilience and evacuation capacity in the event of hazards. Additional growth projections are available in the Waller County Transportation Plan, Appendix C Growth Matrix

The area surrounding the project segment has a lower low-income population (11.19%) as compared to the regional average of 13.5%. The area surrounding the project segment has a lower minority population (47.52%) as compared to the regional average of 65% minority. TxDOT’s Environmental Process is designed to ensure compliance with Title VI of the Civil Rights Act of 1964, and the Executive Order on Environmental Justice. Standard practice is to implement projects that provide user safety and operational efficiency while taking into account environmental quality and impacts on surrounding communities. In practice this means identifying and assessing potential project impacts, and then proposing measures to avoid, minimize, and/or mitigate disproportionately high and adverse effects to Environmental Justice Populations. Additional growth projections are available in the Waller County Transportation Plan, Appendix C Growth Matrix

Impacts on Natural and Cultural Resources

This project is in conceptual development. If required, the appropriate Environmental Document (Categorical Exclusion, Environmental Assessment, or Environmental Impact Statement) will be conducted to identify, avoid or mitigate potential impacts to the natural or human environment.

0;0

Innovation

No

No

Additional Documents

2023HGAC-CFP-RGM-LOS-Brazoria County-Comm Pct 1 (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-City of Friendswood-Mayor (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-City of Galveston-Mayor (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-Port Freeport-Chairman (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-CR-LOS-City of Pattison - Mayor (All Waller Co Projects).pdf

2023HGAC-CFP-CR-LOS-Waller County - County Judge (All Waller Co Projects).pdf

2023CFP-166 map.png

2023HGAC-CFP-RGM-LOS-Port Freeport-Chairman (ALL RGM TxDOT Projects).pdf

2023HGAC-CFP-RGM-LOS-Waller County-County Judge (ALL RGM TxDOT Projects).pdf

Waller County Transportation Plan Appendix C.pdf