Stewart Road - 61st to 75th Streets: Corridor Improvements
Facility/Street/Highway
Stewart Road
Limits
61st Street to 75th Street
Description
Full reconstruction of Stewart Road from 61st to 75th Streets to include a two-way left turn lane, pedestrian improvements (e.g. sidewalks, ADA ramps), traffic signal upgrades (i.e. 65th, 68th, 69th and Colony Park Drive), replacement of water and sanitary sewer infrastructure, storm sewer system improvements, and ROW acquisition (if necessary).
Timeframe
Short Term (0-5 Years)
Estimated Cost
$46,058,000.00
Investment Category-Focused Criteria
No
Yes
This project occurs along an existing transit route in the City of Galveston.
No
No
Unknown
The transit agency helps usher people during emergencies to the community center on Broadway to transfer people onto busses for evacuation form the island.
Other Investment Category Focused Criteria
Yes
The improved corridor will enhance access to existing and potential development along the corridor.
The expansion of the roadway geometry through the addition of a two way left turn lane allows turning vehicles to exit the through travel lanes to access businesses along the corridor. in addition, the expansion of the roadway network to include bus pull-outs will allow busses to leavt teh travel lane for pickup/dropoff reducing backups in the through lane as a result of this activity.
This proposed project will consist of a complete corridor improvement within the right of way. This will allow for new sidewalks, driveway entrances, ADA Accessibility and other built components along the corridor to provide a safe place for all users.
The increased width of the roadway by adding the two way left turn lane will allow traffic to be diverted around accidents, thus reducing delays to all users resulting from crashes along the corridor.
This project will reconstruct and upsize existing infrastructure to improve capacity and condition of the entire roadway corridor. New concrete pavement will be incorporated into the design to provide a 50-year design life of the pavement, reducing the need to reconstruct this network segment for several decades.
Planning Factors Criteria
236 crashes per 100 million vehicle miles
R = 385/(5*1.395) = 55.19 crashes per mile
The improved roadway geometrics along this corridor will improve safety by reducing driver confusion, which will reduce expected fatalities along this stretch of the road network.
Resiliency
High
Medium
This project will include upgrades to the underground drainage conveyance system as well as improvements at the intersections to provide larger inlets to accommodate a greater inflow of water into the system. Given the island’s unique geographic constraints, inclusion of sluice gates or other closure type apparatuses are being considered at the outfall to prevent the system from being inundated dure to tidal backflow.
Access/Connectivity
2995
4125
No
Yes
No
Environmental Justice
2995
4125
1387
755
554
256
20
The proposed corridor improvements will improve accessibility for all users along the corridor by reducing delays due to traffic and congestion.
This project will incorporate greater accessibility to existing municipal services offered by the City to all residents.
Impacts on Natural and Cultural Resources
This project will occur along an already developed corridor. The planned improvements will include upgrades to the underground drainage conveyance system as well as improvements at the intersections to provide larger inlets to accommodate a greater inflow of water into the system. Given the island’s unique geographic constraints, inclusion of sluice gates or other closure type apparatuses are being considered at the outfall to prevent the system from being inundated dure to tidal backflow.