Major Projects Questionnaire
Project Information
Agency Name | Galveston Wharves |
Project Title | 145 Direct Connect Engineering |
Facility/Street/Highway | I45 at Harborside to Harboside at Port |
Limits | |
Description | Engineering for I45 Direct Connect, project funded for preengineering already |
Timeframe | Medium Term (6-10 Years) |
Estimated Cost | $13,000,000.00 |
Regional Transportation Plan Goals
The Direct connect aligns with the 2045 RTP goals as follows: It improves safety, achieves and maintains a state of good repair, helps move people and good reliable and efficiently, with the ports cargo and cruise helps strengthen the regional economic competitiveness and conserves and protects natural and cultural resources.
Regional Significance
Roadway
Major Collector
Potential Crash Reductions
1/336
12/336
The elevated highway will have greater capacity then the current route, with no rail crossing, no cross traffic and/or flooding. These factors will lead to less accidents with this project.
Potential Congestion Reductions
No
1.0 – 1.25
The relative severity of travel congestion is measured by the ratio of the peak travel time to the travel time at free-flow speeds. A travel time index of 1.2 means travel speeds are 20 percent slower than free flow for a given time period. Given the mitigation factors the lower TTI.
eliminates the rail crossing, cross traffic, stops and flooding
Connectivity to Jobs, Medical Facilities, and Activity Centers
Yes
Yes
Yes
n/a
State of Good Repair
i45
Good
n/a
Biking and Walking Conditions
N/A
Impacts to Vulnerable Populations
19.1
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Hurricane Evacuation Route
Yes