Implement new bicycle lanes along various roadway corridors within the City including signage and striping.
Timeframe
Short Term (0-5 Years)
Estimated Cost
$355,583.00
Investment Category-Focused Criteria
Roadway
Principal Arterial or Higher Functional Class
The goal of this project is to consturct a multi-use trail along Seawall Blvd, and FM3005 from Boedeker Road to the San Luis Pass along the gulf side of the island.
12653
30 years
Good
Yes
A new pavement condition assessment was performed in 2023. The final report is in DRAFT format and has not been released to the public.
Yes
Other Investment Category Focused Criteria
No
The focus of this project is a multi-use trail to provide accessability for pedestinan, bicyclists and other recreation users.
This project in many cases will abut many large tracts fo vacant land on the island that could be developed into large residential and/or multi-use developments.
This project will reduce the number of conflict points that existg between the major arterial roadways and the highly desired gulf of mexico beaches along Galveston Island.
The overall intent of this project is ot develop and engineering design that can be implemented by a physical construction project. This current project is to conduct a feasibility study and complete and engineering design package.
The proposed project will provide enhanced access to existing transit stops along the Seawall and provide greater protection for pedestrians all users while waiting for regularly scheduled pickups.
Planning Factors Criteria
1. What is the existing fatality crash rate at the project location? Regional crash data is available online on the crash data viewer. H-GAC staff will provide assistance in calculating the crash rates upon request.
0.16 crashes per vehicle mile traveled
R = 1787/(5*28.422) = 12.58 crashes per mile
Moving pedestrian and bicyclists off of the roadway will reduce the potential for the type of crashes experienced in the past.
Resiliency
Low
Low
This project will be graded to drain in a manner that follows the existing drainage patterns already established by TxDOT and the City/County/US Army Corps of Engineers.
Access/Connectivity
175
4137
No
No
No
Environmental Justice
175
4137
1182
1589
852
238
20
The proposed corridor improvements will improve accessibility for all users along the corridor by reducing delays due to traffic and congestion.
The proposed corridor improvements will improve accessibility for all users along the corridor by reducing delays due to traffic and congestion.
Impacts on Natural and Cultural Resources
This project will be graded to drain in a manner that follows the existing drainage patterns already established by TxDOT and the City/County/US Army Corps of Engineers.