Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Megan Campbell

Planner

713-802-5325

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

Texas Department of Transportation - Houston

Quincy Allen

District Engineer

713-802-5000

[email protected]

7600 Washington Avenue

Houston

TX

77007

Additional Agency Information

Project Information

FM 517 Widening and Access Management

Brazoria County

FM 517

Galveston County Line, SH 35

The proposed project is needed to improve mobility in Brazoria and Galveston Counties and to improve safety by providing a divided roadway. The proposed roadway would provide additional capacity for traffic traversing this quickly growing part of the county. The project area is projected to see particularly strong growth, particularly within the City of Alvin. Galveston County, as well as the cities of Dickinson and League City, show moderate projected growth.

The proposed improvements to FM 517 from SH 35 to I-45 include widening the existing facility to four lanes with two 12-foot-wide travel lanes in each direction with curb and gutter; between FM 646 and I-45 the improvements include an 18-foot-wide raised median with turn lanes. The facility would also have 14-foot-wide shoulders and 5-foot-wide sidewalks on both sides of the roadway.

The purpose of the proposed project is to accommodate future anticipated traffic demand and growth in the region, as well as improve safety and mobility by constructing a divided roadway with raised medians. Congestion is anticipated to lessen due to access changes to adjacent residences and businesses via the creation of openings in the raised medians at select locations and intersections. The roadway improvements would accommodate anticipated future growth in the region by adding needed additional capacity while providing accommodations for bicyclists and pedestrians through the construction of shared-use lanes and sidewalks.

Yes

16320

Yes

1002-01-006

Less than $100 million

(Expand) Roadway Added Capacity/New Construction/Complete Streets

8976000

TXDOT_HOU_HGAC2018CFP.PDF

Project Development/Readiness

30% PS&E

Environmental Assessment (EA)

12/01/2019

Yes

No

No

No

Yes

06/01/2020

06/01/2020

06/01/2022

69

0

No

No

US Army Corp of Engineers Permit will be an Individual Permit (IP). 

Map/Location

Map_HOU_66_HW_FM517.pdf

Project Budget

HOU_66_HW_FM517 Project Budget Worksheet.xlsx

No

Benefit/Cost Analysis

HOU_66_HW_FM517 Roadway Safety Benefits Template - Editable.xlsx

1031201835928PM.xlsx

HOU_66_HW_FM517 Roadway Emissions Benefits Template - Editable.xlsx

HOU_66_HW_FM517_Support.pdf

Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings

Yes

901 - 1000

No

Planning Factors - Environmental Justice

Yes

No

Planning Factors - Improves Corridor Level of Travel Time Reliability (LOTTR)

0.11 - 0.20

HOU_66_HW_FM517 Level of Time Travel Reliability LOTTR Estimation Template - Editable.xlsx

Planning Factors - Improves Multimodal LOS

Yes

Yes

Yes

Project adds capacity, serves transit route on FM 517 and adds sidewalks http://www.gulfcoastcenter.org/userfiles/file/Connect%20Transportation/Connect_Transit_Mainland_Schedule_Map_2014.pdf

Planning Factors - Planning Coordination

Yes

H-GAC RTP 2040 (Under MPO ID 16320) ; Galveston County Support Letter

http://www.h-gac.com/taq/plan/2040/default.aspx

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Minor Arterial

No

No

No

Yes