Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Megan Campbell

Planner

713-802-5325

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

Texas Department of Transportation - Houston

Quincy Allen

District Engineer

713-802-5000

[email protected]

7600 Washington Avenue

Houston

TX

77007

Additional Agency Information

Project Information

South SL 336 Widening

Montgomery County

SL 336

FM 1314, IH 45

The existing facility, between FM 1314 and IH 45 generally consists of a two-lane undivided roadway. The facility had 68 crashes and 2 serious injuries during the period from 2015 to 2017. The truck volume on the facility is roughly 5,372 trucks per day and this represents 11.8% percent of the facility's AADT. 

Widen to 4-lane divided roadway

The project proposes to widen the SL 336 roadway from a two-lane undivided roadway to a four-lane divided facility. Directions of travel would be separated by a median. Turn lanes would be provided at various locations. A sidewalk would be constructed on the south side of the roadway. It is anticipated that no additional right-of-way (ROW) would be needed to accommodate the proposed improvements. The purpose of the proposed project is to add capacity, construct the roadway to meet current design standards, improve mobility, and improve traffic safety through reduced crashes.

Yes

16343

Yes

0338-11-056

Less than $100 million

(Maintain) Roadway/Freight Rehabilitation/Reconstruction

9680000

TXDOT_HOU_HGAC2018CFP.PDF

Project Development/Readiness

30% PS&E

Categorical Exclusion (CE)

10/01/2018

Open-Ended D 

Yes

No

No

No

No

Yes

30%

No

09/01/2022

No

Anticipated US Army Corps of Engineers Permits: Nation Wide Permit (NWP)

Map/Location

Map_HOU_59_HW_SL336.pdf

Project Budget

HOU_59_HW_SL336 Project Budget Worksheet.xlsx

No

Planning Factors - Connectivity to Employment/Eliminates At-Grade Railroad Crossings

Yes

901 - 1000

No

Planning Factors - Environmental Justice

Yes

Yes

Planning Factors - Resiliency/Flood Mitigation Strategies

Yes

SL 336 provides a direct connection to IH 45, a designated evacuation route. This project elevates portions of SL 336.

Planning Factors - Improves Multimodal LOS

Yes

Yes

Yes

This project adds 2 lanes of capacity to SL 336.  The Conroe Connection "Route 2 South - Lone Star Family Health" utilizes a portion of SL 336 that are within this project's limits (http://www.cityofconroe.org/home/showdocument?id=20555). This project sidewalks and a 15' outside lane to accommodate bicyclists.

Planning Factors - Planning Coordination

Yes

H-GAC RTP 2040 (Under MPO ID 16343)

http://www.h-gac.com/taq/plan/2040/default.aspx

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Principal Arterial

No

Yes

No

No

route_support.pdf