Operational Improvements and Congestion Management Questionnaire

Project Information

Agency Name City of Mont Belvieu
Project Title Public Works & Engineering Director
Facility/Street/Highway Eagle Dr.
Limits From Fm 565 to SH 146
Description Reconstruction of 2-lane open ditch to 4-lane Blvd with curb and gutter with sidewalks and bikeway.
Timeframe Short Term (0-5 Years)
Estimated Cost $36,000,000.00

Investment Category-Focused Criteria

No

1.0 – 1.25

Existing free-flow speed run from SH 146 to Lakes of Champions on Eagle Dr at 35 MPH and 3 signals is 6.48 minutes. Peak Hour run is 7.72 minutes. During peak hours for school 2-3pm is 8.96 at a TTI of 1.382

< 1.0

Project would provide communication to signals for coordination, upgrades, and control from the Managment Center at old city hall. This would allow for coordinated flow through the intersections and provide school traffic relief by allowing real time timing adjustments.

The basic goal of this Management Center Plan is to identify a series of improvement projects to address the transportation-related functional requirements for the City of Mont Belvieu, with an objective of providing a Management Center and advanced transportation system improvements throughout the city for emergency operations. The guiding principles and many of the technical aspects have not been developed previously. This plan will serve as a foundation for a Management Center implementation along with a much-needed updated technology for ITS devices to improve egress and ingress for emergency operations related Evacuations, plant operations emergencies, and coordinating/providing guidance for interstate/Sate Highway traffic along SH 146, SH 99 and IH 10 during traffic incident and emergencies.

Yes

Other Investment Category Focused Criteria

Yes

The proposed improvements will increase the throughput capacity of the existing road, decreasing delays and improving safety. The road is expected to reach capacity within the next couple of years. The project will widen FM 3360/ Eagle Dr. from 2 lane undivided to 4 lanes divided with ability to adjust for additional capacity and turn lanes including wider sidewalk or trails with bikers. The intersections of FM 565 and SH 146 will have intersection improvements and upgraded signal technology including adding a fiber connection to the cities MBlink internet system for emergency services. Additional signals or pedestrian crossings will be analyzed and installed for the Riceland Development access to Town Center and City Hall.

There are currently few walking and biking options in the area. The project will expand the sidewalks and/ or trails network for pedestrians and bikers. The project will provide design for walkers and bikers to get to the new city hall on the westside of Eagle Dr. This will be critical since Riceland development is located mainly on the eastside of Eagle Dr. Project will provide a safer or improved bike/walker route to get to the Town Center area, Riceland area and park area approx. 0.5 mile south of FM 565. The project will also provide an improved connection between the north side of town and the south side of town, decreasing vehicular trips to major destinations on the south side of Mont Belvieu.

Proposed improvements will increase the capacity of the existing roadway, minimizing delays and improving safety of motorists, pedestrians and cyclists. The improvements will also provide the backbone of a robust transit system by expanding roadway size to accommodate buses, bus stops, safe street crossings, etc.

Eagle Drive in this area is a vital connection for Mont Belvieu and the adjacent area. Today Eagle Dr is a 2-lane highway undivided with 2' to no shoulders. Adding 4 lanes concrete pavement will help keep traffic moving and provide a relief lane or can provide a traffic pattern change to other side for emergency personnel to keep safe.

Project is currently planned to be concrete curb and gutter providing a long-life span. This will help with future maintenance. Underground storm system will not require cleaning out or scraping ditches every year to maintain a good flow. Additionally, the existing roadway section is reaching the end of its service life.

Planning Factors Criteria

0.1667 (1 in 2023)

0.3333 (2023)

The widening of FM 3360/Eagle Dr will provide a safer drive for future and current residents. The addition of additional through lanes, medians, left turn lanes, median openings/access management improvements, wider sidewalks and bike trails will reduce crash rates for rear end collision for turning vehicles and head on crashes. Having curb and gutters will provide residents and students with safer sidewalks and bike trails, including eliminating the ditches along sidewalks edges.

Resiliency

Low

Low

The project would eliminate the roadside ditches along FM 3360/Eagle Dr. Curb and gutter drainage system will provide a safer system for pedestrians and bikers near the current ditches. An underground drainage system would be added and connected to Mont Belvieu regional system.

Access/Connectivity

1252

931

Yes

Yes

No

Environmental Justice

1252

931

93

500

830

1320

4

Project will provide access to city hall thru improved sidewalks and roadway crossings to pay bills including water, internet and others. It will also improve pedestrian and cyclist access to the livable center that is currently under construction around City Hall. Improvement will also better access to the Barbers Hill schools and Community Parks located south of FM 565 including biking and walking. This project is part of the transportation master plan for the City, which emphasizes pedestrian and cyclist connectivity throughout the entire town and between major destinations.

Project will be constructed and designed inside existing right of way. No additional right of way will be needed along Eagle Dr. The project will not hinder pedestrian or cycling connectivity in any way. Additionally, the proposed boulevard will not create a barrier between different areas of town as it will be walkable and will prioritize connectivity. No poverty areas will be affected but walkable, biking and traffic congestion will be improved.

Impacts on Natural and Cultural Resources

No wetlands or flood plains are located along the proposed project along Eagle Dr from FM 565 to SH 146. Moreover, the project will take place within existing right of way.

0.03 (both)

Innovation

Yes

The south end of the project is where the new Livable Center, updated City Hall, park area, retail, and other businesses will be. Innovative ideas will be implemented for the mobility of pedestrians and cyclists from all parts of town including crossing signals or median bulb-outs for refuge. Technologies will be needed for Riceland Development to connect to City Hall and Livable Center area. The implementation of this project would significantly improve connectivity and congestion while working cohesively with the livable center and the City's ultimate vision of a walkable town.

No

Additional Documents

Approved Riceland Master Plans - Mont Belvieu.pdf

Mont Belvieu Adopted Comprehensive Plan Reduced Reduced.pdf

Mont Belvieu Adopted Master Trails Plan 9-25-18.pdf

Mont Belvieu Adopted Master Trails Plan 9-25-18.pdf

Mont Belvieu Capital Improvements Plan 20182027 2019.03.20.pdf

Mont Belvieu Main Livable Center Study by HGAC.pdf