Resiliency and State of Good Repair Questionnaire

Project Information

Agency Name City of Mont Belvieu
Project Title Public Works & Engineering Director
Facility/Street/Highway Eagle Dr.
Limits From Fm 565 to SH 146
Description Reconstruction of 2-lane open ditch to 4-lane Blvd with curb and gutter with sidewalks and bikeway.
Timeframe Short Term (0-5 Years)
Estimated Cost $36,000,000.00

Investment Category-Focused Criteria

Roadway

Principal Arterial or Higher Functional Class

The existing roadway section is only one lane each way, with limited to no shoulders. Road closures due to maintenance or accidents result in major disruptions to the traffic operations around town due to the significance of this road in the community. Widening the road and providing ample space for re-routing traffic would significantly improve the resiliency of this road, and the community as a whole.

7,696 in 2021

50 years

Fair

No

Yes

Other Investment Category Focused Criteria

Yes

The proposed improvements will increase the throughput capacity of the existing road, decreasing delays and improving safety. The road is expected to reach capacity within the next couple of years. The project will widen FM 3360/ Eagle Dr. from 2 lane undivided to 4 lanes divided with ability to adjust for additional capacity and turn lanes including wider sidewalk or trails with bikers. The intersections of FM 565 and SH 146 will have intersection improvements and upgraded signal technology including adding a fiber connection to the cities MBlink internet system for emergency services. Additional signals or pedestrian crossings will be analyzed and installed for the Riceland Development access to Town Center and City Hall.

The added turn lanes, through lanes, medians, trails and sidewalks will improve the safety and travel times through this area of town.

There are currently few walking and biking options in the area. The project will expand the sidewalks and/ or trails network for pedestrians and bikers. The project will provide design for walkers and bikers to get to the new city hall on the westside of Eagle Dr. This will be critical since Riceland development is located mainly on the eastside of Eagle Dr. Project will provide a safer or improved bike/walker route to get to the Town Center area, Riceland area and park area approx. 0.5 mile south of FM 565. The project will also provide an improved connection between the north side of town and the south side of town, decreasing vehicular trips to major destinations on the south side of Mont Belvieu.

Currently Mont Belvieu does not have transit services but may need to review for an Eagle Dr. route to and from IH 10 area since majority of the residents will live off of Eagle Dr. The proposed project is fully compatible with future plans for transit services, providing improved roadway capacity, better pedestrian and cyclist facilities, and available space for bus stops and bicycle storage.

Planning Factors Criteria

1. What is the existing fatality crash rate at the project location? Regional crash data is available online on the crash data viewer. H-GAC staff will provide assistance in calculating the crash rates upon request.

0.1667 (1 in 2023)

0.3333 (2023)

The widening of FM 3360/Eagle Dr will provide a safer drive for future and current residents. The addition of additional through lanes, medians, left turn lanes, median openings/access management improvements, wider sidewalks and bike trails will reduce crash rates for rear end collision for turning vehicles and head on crashes. Having curb and gutters will provide residents and students with safer sidewalks and bike trails, including eliminating the ditches along sidewalks edges.

Resiliency

Low

Low

The project would eliminate the roadside ditches along FM 3360/Eagle Dr. Curb and gutter drainage system will provide a safer system for pedestrians and bikers near the current ditches. An underground drainage system would be added and connected to Mont Belvieu regional system.

Access/Connectivity

1252

931

Yes

Yes

No

Environmental Justice

1252

931

93

500

830

1320

4

Project will provide access to city hall thru improved sidewalks and roadway crossings to pay bills including water, internet and others. It will also improve pedestrian and cyclist access to the livable center that is currently under construction around City Hall. Improvement will also better access to the Barbers Hill schools and Community Parks located south of FM 565 including biking and walking. This project is part of the transportation master plan for the City, which emphasizes pedestrian and cyclist connectivity throughout the entire town and between major destinations.

Project will be constructed and designed inside existing right of way. No additional right of way will be needed along Eagle Dr. The project will not hinder pedestrian or cycling connectivity in any way. Additionally, the proposed boulevard will not create a barrier between different areas of town as it will be walkable and will prioritize connectivity. No poverty areas will be affected but walkable, biking and traffic congestion will be improved.

Impacts on Natural and Cultural Resources

No wetlands or flood plains are located along the proposed project along Eagle Dr from FM 565 to SH 146. Moreover, the project will take place within existing right of way.

0.03 (both)

Innovation

Yes

The south end of the project is where the new Livable Center, updated City Hall, park area, retail, and other businesses will be. Innovative ideas will be implemented for the mobility of pedestrians and cyclists from all parts of town including crossing signals or median bulb-outs for refuge. Technologies will be needed for Riceland Development to connect to City Hall and Livable Center area. The implementation of this project would significantly improve connectivity and congestion while working cohesively with the livable center and the City's ultimate vision of a walkable town.

No

Additional Documents

Mont Belvieu Adopted Comprehensive Plan Reduced Reduced.pdf

Mont Belvieu Adopted Master Trails Plan 9-25-18.pdf

Mont Belvieu Capital Improvements Plan 20182027 2019.03.20.pdf

Mont Belvieu Main Livable Center Study by HGAC.pdf

Riceland Livable Center Poster.pdf

Approved Riceland Master Plans - Mont Belvieu.pdf